ML20147E331

From kanterella
Jump to navigation Jump to search
Informs of NRC Plans to Administer Generic Fundamentals Examination Section of Written Operator Licensing Examination at Southern California on 970409
ML20147E331
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/10/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
References
NUDOCS 9702180304
Download: ML20147E331 (3)


Text

-

e p*M%q UNITED STATES y

n

,k NUCLEAR REGULATORY COMMISSION REGION IV n

y 3 IV~ '

f 611 RYAN PLAZA DRIVE, SUtTE 400 8

AR LINGTON, T E XAS 760118064 9 *****

FEB IO (997 4

Harold B. Ray, Executive Vice President Southern California Edison Co.

San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128

SUBJECT:

GENERIC FUNDAMENTALS SECTION OF THE WRITTEN OPERATOR LICENSING EXAMINATION

Dear Mr. Ray:

The NRC plans to administer a Generic Fundamentals Examination Section (GFES) of the written operator licensing examination at your facility on April 9, 1997. The GFES will consist of 100 questions. The maximum time allowed to complete the examination is 2-1/2 hours and the passing score will be i

80 percent.

In order to nominate candidates, an authorized representative from your facility must submit a letter listing the names of candidates for the examination to the appropriate NRC Regional Administrator and to the Chief, Operator Licensing Branch. The letter must be received both in the Region and at NRC Headquarters by March 6, 1997, in order to allow us to assign docket numbers to the candidates and to make preparations for shipping the examinations to you for administration. The letter must certify that the candidates will have completed their fundamentals training by the date of the examination and are enrolled in your training program leading to an NRC operator or senior operator license. The letter must also list the names of 4

personnel you will be using to proctor the examination and the address to which the examinations should be sent. A sample registration letter is enclosed.

The address for the Operator Licensing Branch Chief is as follows:

Stuart A. Richards, Chief Operator Licensing Branch U.S. Nuclear Regulatory Commission MS OWFN 9-D-24 Washington, DC 20555 Approximately 2 weeks prior to the examination administration date, your designated facility contact will be sent a letter delineating examination particulars (i.e., proctor responsibilities, student 1.D. numbers, etc.)

Sincerely, J

S p Thomas P. Gwynn, Director 9702100304 970210 PDR ADOCK 05000361 V

PDR

Southern California Edison Co. Dockets:

50-361 50-362 Licenses: NPF-10 NPF-15

Enclosure:

As stated cc w/ enclosure:

Rob Sandstrom, Manager Nuclear Training Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 E-50A Nuclear Training Division San Clemente, CA 92674-0128

(.

d

.I~

Southern California Edison Co. bec to-DCB (IE42) bec distribution by RIV:

DRP Branch Chief Resident. Inspector M. Fields, NRR (0WFN 13-E-16)

Leah Tremper, OC/DAF/LFARB (TWFN 9-E-10)

RIV file L. Miller, TTC L. J. Callan, RA L. A. Hurley, GFES file l

180051 DOCUMENT NAME: GFES!

)

To reonive copy of documart, h in box:"C" = Copy without enclosures T - Copy with enclosures W = No copy RIV:OB LA g

l N C:OB lM D DRS l9 l

l LAHurley 74 JLPellet M

TPGwynn

/1d 02/l?/97

//

02/fe/97 02/$/97

/ /97 0FFICIAL RECORD COPY

\\

O

.