p atco UNITED STATES
~
y
'q NUCLEAR REGULATORY COMMISSION
[
REGION IV o
$..k s 611 RYAN PLAZA DRIVE, SUITE 1000
- YA.b 8
ARLINGTON, TEXAS 76011 Q)
Y r
o
?
- +
27 SEP 1978 Docket No.-99900283/78 !
Boston-Insulated Wire and Cable Company
. ATTN: Mr. E. Manchester, Jr.
President 65; Bay Street Boston, Massachusetts 02125' Gentlemen:
This refers.to the QA Program inspection conducted by Mr. W., E. Foster of this office'on July 24-27, 1978, of your facility at Boston, Massachusetts associated with the mar.ufacture and fabrication of wire and cable and to the discussions of our findings with Mr. J. Rath and members of your staff'at the conclusion of the inspection.
This inspection was made to confirni that, in the areas inspected, your QA-program is being effectively' implemented. 'The inspection effort is not designed to assure that unique quality requirements imposed by a customer are being. implemented; nor to assure that a-specific product, component-or service provided by you to your customers, is of ~ acceptable quality.
As you know, the NRC requires each of its licensees to assume full responsibility for the quality of specific products, components or services procured from others.
You should therefore not conclude-that the'NRC's
~
inspection exempts you from inspections by an NRC licensee or his agents.
nor from taking effective corrective action in response to their findings.
Areas examined and our findi.ngs are discussed in the enclosed report.
Within these areae., the. inspection consisted of,
examination of proce-dures and representative records, interviews with personnel, and observa-tions vy the inspector.
During the inspection it was found that the implementation of your QA Program failed to meet certain NRC requirements.
The' specific findings
- i and references to the pertinent requirements are identified in the enclo-sures to this letter.
Please provide us within thirty (30) days of your receipt of this repcrt a written statement containing, (1) a description af steps that have been i
or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the date your corrective actions and preventive measures were or will be completed.
\\.
'I 812 210 M
\\
-..._m.
,m b
ap.-rm+,
hw=ip:-
n.
t->wei av wqur p-,+,ysp
-r-
--t-*=-T+tice =
,+t er s = se t-s' e
- v v y1'e-s-+
t e
- k. s. e--e ue-*'em>e-si-zeh'-gr we-e e g i.sie-an wrw by.eu*4=vre Up -5**o*e44Ftver TT1 *M4FGfF"41-Du 9=rW"199*mff f
AW*
Boston Insulated Wire and Cable Company In addition to the current findings, we determined that you failed to take satisfactory corrective action relative to Deviation No. D.3.a.(1) identified in our letter dated June 22, 1977, and its attachment.
Specifically,your letter of July 18, 1977, stated that documentation would be indicated by having the person reviewing the contract initial, date, and affix his QC stamp to the checklist.
As shown in the attached inspection report, this commitment had not been completely ' implemented.
Consequently, in your response, please inform us of steps that have been or.will be taken to assure that management comitments to take corrective action will be acconnodated in the future.
In accordance with Section 2.790 of the Commission's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply, together with the enclosed inspection report will be placed in the Comission's Public Document Room.
If this report contains any information that you believe to be proprietary,)it is nec-essary that you make a written application within thirty (30 days to this office to withhold such information from' public disclosure. Any such application must include a full statement of the reasons on.the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary infonnation identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, i
/
Karl V. Seyfrit Director i
Enclosures:
l.
Notice of Deviation 2.
Inspection Report No. 99900283/78-01 l
s I
- _ _. -. _. _ _. -. - _ _ _ _ _.. ~ _ _.. _ _ -,... ~ _. _. - _.... _... _.,. -. _. _. _ -..... _.. _..
O.
Boston Insulated Wire and Cable Company Docket No. 99900283/78-01 NOTICE OF DEVIATION Based on the results of an NRC inspection condt.cted on July 24-27, 1978, it appeared that certain of your activities were not conducted 'n full compliance with NRC requirements as indicated below:
A.
Boston Insulated Wire and Cable Company's corrective action response letter of July 18, 1977, states in part, " Documentation will be in-dicated by having the person reviewing the contract initial, date, and affix his QC stamp to the check list." Effectivity date is June 13, 1977.
Contrary to the above, the following checklists had not been initialed:
Order Nos./ Dates Order Ncs./ Dates 84034 - April 19,1978 84087 - May 1, 1978 84033 - April 19, 1978 84086 - April 19,1978 84075 - April 3,1978 B.
Criterion V of Appendix B to.10 CFR 50 states in part, " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings."
Paragraph 4.0 of the Shop Floor Traceability procedure identifies critical materials while paragraph 5.1 requires using BIW Quality Control Requirements for Suppliers Spec. QCS 100.
Contrary to the above, BIW Quality Control requirements for Suppliers Specification, QCS-100, could not be found.
See Details Section, paragraph B.3.
C.
Criterion IV of Appendix B to 10 CFR 50 states in part, " Measures shall be established to assure that applicable regulatory require-ments, design bases, and other requirements which are necessary to assure adequate quality are suitably included or referenced in the documents for procJrement of material, equipment, and services....
To the extent necessary, procurement documents shall require contrac-tors or subcontractors to provide a quality assurance program consist-ent with the pertinent provisions of this appendix."
7812210o9
- %+=*e eBh*
4* 4a eammy wee $ GhhG m$ MD@p a$ +
O 4 *****
-"-40" O*
- H
- "*A
- O"*4 "8*
. Section 5. of ANSI N45.2-1971, states in part, " Procurement documents shall include provisions for the following, as applicable:
(1)
Supplier Quality Assurance Program... (2) Basic Technical Require-ments... (3) Source Inspection and Audit... (4). Documentation Requirements... (5) Lower Tier Procurements...."
Paragraph 4.1 of the Quality Control Manual states in part, "All nomenclature and requirements (codes, standards, quality control plans, etc.) are included in the purchase order documentation...."
Paragraph 4.2 of the Quality Control Manual states in part, " Purchase Requisitions and orders are screened by the Quality Control Depart-ment...."
Contrary to the above:
1.
Purchas3 orders did not include provisions for quality assurance and audits, e.g., BIW Purchase Orders 3-3876, dated February 1, 1978; 1-9781, dated March 27, 1978; 1-8908, dated February 1, 1978; and 3-9840, dated March 30, 1978.
All of these orders involved items important to safety.
?.
Purchase-requisitions are not screened by the Quality Control Department.
See Details Section, paragraph C.3.c.
D.
Criterion V of Appendix B to 10 CFR 50 states in part, " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings."
Paragraph 2.8 of Final Inspection Procedure No.1 states, "Each reel is given an electrical and visual inspection by Final Inspection to assure that it is complete, free of defects, and that all. previously required tests and inspections have been performed."
Contrary to the above, no electrical inspections are performed by Final Inspection to assure that each reel is free of defects.
E.
Criterion VI of Appendix B to 10 CFR 50 states in part, " Measures shall be established to control the issuance of documents, such as instructions, procedures, and drawings, including cFanges thereto, 2
-ym+y
--g w+
re w
w e-w N--
4 T=
+
M w
-+9T e
"5'"
- 'T F"
"F"*#i#4
4
. which prescribe all activties affecting quality.
These' measures shall assure that documents, including changes,-are reviewed for adequacy and ap? roved for release by authorized personnel and are distributed.to and used at the location...."
Additionally, Section 7. of ANSI N45.2-1971 requires the measures to be documented.
Contrary to the above, measures-had not been documented to control.
the issuance of drawings; e.g., drawings 11316-H-010, Revision E, December 5,1977, and 12495-H-024, June 22 and 27-28,1978, were located in the Engineering files-without approval signatures.
See Details Section, paragraph E.3.c.
F.
Criterion.VI of Appendix B.to 10 CFR 50 states in part, " Measures shall be established'to control the issuance.of documents, such as instructions, procedures, and drawings,' including changes thereto, which prescribe all activities affecting' quality.
These measures
.shall assure that documents, including changes, are reviewed for adequacy and approved.for release by authorized personnel...."
Paragraph 6.4 of. the Quality. Control Manual rec,uires that a copy of the Specification' Change Notice (SCN) accompany the Manufacturing Specification until the manufacturing step is changed.
Additionally, paragraph 6.5 requires Product Design Engineer approval of Manufactur-ing Specification changes.
Contrary to the above:
1.
Specification Change Notices (for changes 0 and E) were not-accompanying Manufacturing Specification for Order No. 74016/B3,-
Part No. 11316-H-010, Change C, and the manufacturing step had not been changed.
l-2.
The following Manufacturing Specification changes had been-released to manufacturing but had not been approved by the Product Design Engineer:
Part No./ Change Part No./ Change 11734-C-G22 A 9506-R-040 B 12150-H-002 A 9507-R-016 B
)
.p.
..--e~,,-
-.v-....
~,