Proj Rept for April & May 1977 Financial Info,Alligator Bayou Study,Site Audit,Constr Activities & Records Mgt
ML20147D832
Person / Time
Site: River Bend  Entergy icon.png
Issue date: 06/20/1977
From: Burdick W
STONE & WEBSTER, INC.
To: Adams S
GULF STATES UTILITIES CO.
Shared Package
ML20147D828 List:
References
RBS-2718, NUDOCS 7812200177
Download: ML20147D832 (3)


Text

. __ - _ _ - - _ _ -

.CCuElhESI g

&%e STONE 8 WEBSTER ENGINEERING CORPOR ATION Nou; e

~

CHERRY HILL OPERATIONS CCNTER ' boa & M :J, '

3 EXECUTIVE CAMPUS. P.o. DoX s2co CH E R R Y H H.L. NEW JERSEY o8o34 .

... ....~

O,'e'L". '

UL'!O*"**

"0 3" "

n'!:'s,$"*."'

% " *1. ".'t. "to.

Gulf States Utilities Company June 20, 1977 Senior Vice President - Engineering and Construction J.O.Nos.12210412330 Mr. S. L. Adams RBS-2718 fi.'.r U N7/,

Attn: Records Management Department - Nuclear P. O. Box 2951 fp. EgpEDgecod,' ., ,

Beaumont, Texas 77704  ;

thCfont:d gnt offices.

Total expenditures for two units during April and May ucre $7,789,000 and $7,208,000, respectively, excluding NSSS and construction recurity.

l , This represen?s a variance from our March 13, 1977 Study Forecast of s

! ($2,311,000)'and ($1,824,000).

l l Total 1977 ngenditures through May were $32,597,000, excluding NSSS and '

construction Jacurity, an underrun of $3,201,000 as compared to the March 15, 1971 forecast.

I I

l 781220 017 7 9

,*[ g

. i ,,.

. 2 Tocal project expenditures through May, 1977, were:

Unit 1 - $150,667,000 Unit 2 - $ 15,939,000 Total $166,606,000 A considerable amount of e'ngineering and design staff man-hours were expended in providing input to complete the estimate, schedule, and cash flow update. In addition to that effort, analytieni activities. continued for the Steel Containment, Reactor Building Concrete Structures, RCIC, Pipe Rupture, Class 1 Analysis of Main Steam System,'and. Tunnel Pipe Supports. Also, inquiries to and discussions with vendors were ongoing ,

l regarding impact on deliveries and payments of the new schedule for '

Units 1 and 2.

1

--3> We need your comments and input on the Alligator Bayou Study and the L.S.U. evaluation of the ecological impact of the Alligator Bayou  !

culverts / embankment design to determine if that design complies with the '

Construction Permit.

The NRC conducted a site audit during the week of April 11, 1977. The final report of findings is expected in early June. Two " apparent" infractions were identified by the NRC at the exit interview, but it is our opinion that no infractions will be included in the final report.

The interim Records }bnagement procedures were submitted during April,  !

and discussiors are continuing to resolve problem areas.

Construction activities continued in accordance with our overall plan for 1977. By April 15, S&W manual forces had been gradually reduced to  :

a level of 96, plus surveyors. Site development work is 94 percent complete, including 100 percent completion of Step D backfill.

Twenty-one and one-half shifts were lost during the two-month period due

'to inclement weather conditions bringing the total to 43 1/2 shifts lost since field activity was started. An additional 11 3/4 shifts have been lost due to union activities.

Project statur as of May 31, 1977, was:

Unit 1 Unit 2 Engineering 67.1% 20.5%  !

Design 53.9% 3.1 % -

Procurement 76.2% 64.0%

Construction' 3.95% Total Prcject 15.6% 0.87%

K 0

. e r e ..,,4m- -- - + - -- -

~

- 3 $1 These completion percentages are based on the new Revised Preliminary Estimate of May 1, 1977.

Very truly yours, s'