- - y.
Public Service Electric and Gas Company Steven E. Mittenberger Public Service Electric and C-as Company P.O. Box 236 Hancocks Bridge, NJ 08038 609 339-4199 -
Vcs Pres &nt -
nucisar operaw.s February 26, 1988 NLR-N88032 U.
S.
Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555 Gentlemen:
REPLY TO NOTICE OF VIOLATION NRC INSPECTION REPORT 50-354/87-29 DOCKET NO. 50-354 HOPE CREEK GENERATING STATION Public Service Electric and Gas Company (PSE&G) is in receipt of your letter, dated January 28, 1988, which transmitted a Notice
~
Violation involving a f ailure to comply with the requirements of an approved station procedure.
Pursuant to the provisions of 10 CPR 2.201, our response to the Notice of Violation is provided in Attachment 1.
Sincerely, 2 -
W i
Attachment C
Mr. W.
T.
Russell, Administrator USNRC Region I Mr.
G.
W.
Rivenbark USNRC Licensing Project Manager Mr.
R.
W.
Borchardt USNRC Senior Resident Inspector Mr.
D.
M.
Scott, Chief ggp \\
Bureau of Nuclear Engineering k
Department of Environmental Protection i
l 380 Scotch Road Trenton, NJ 08628 8803030306 800226 PDR ADOCK 05000354 G
. _ _ _ _, _ _, _ _ _ _.. ~. _ _ _ _ _ - _ _
l I-7 ATTACHMENT l-
'10LCFR 2.201 INFORMATION
'PUBLIC SERVICE ~ ELECTRIC AND GAS COMPANY HOPE CREEK GENERATING STATION RESPONSE TO NOTICE OF VIOLATION INSPECTION REPORT NUMBER 50-354/87-29 As described in Appendix A of your January 28, 1988 letter, Technical Specification 6.8.1 requires that written procedures be established, implemented and maintained covering. activities recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978, which includes Administrative Procedures.
I&C Calibration Procedure IC-DC.ZZ-175(O), "Tavis Pressure Transducer, Model P-8C Device Calibration", specifies correct system restoration including an independent verification of system lineup at the conclusion of the device calibration.
Contrary to the above, procedure IC-DC.ZZ-175(Q) was improperly performed, in that, the flow transducer was not correctly returned to service.
Additionally, the independent verification of system lineup failed to identify the discrepancy.
1.
PUBLIC SERVICE ELECTRIC AND GAS COMPANY DOES NOT DISPUTE THE VIOLATION.
2.
THE ROOT CAUSE OF THE VIOLATION WAS PERSONNEL ERROR IN NOT COMPLYING WITH THE PROCEDURE.
On December 4, 1987, the
'B' Filtration, Recirculation and Filtration System (FRVS) recirculation fan flow transmitter was found isolated while difficulties were being experienced with starting and running the recirculation fan.
This event was caused by a lack of strict procedural compliance on the part of the I&C technicians responsible for the performance of the calibration and return to service of the subject instrument.
While this violation of a station procedure was licensee identified, it was cited as a violation due to recurring problems in the area of procedural compliance.
a L
ATTACHMENT 1 (CONT'D) 3.
IMMEDIATE CORRECTIVE ACTIONS:
The instrument was properly restored to service and
'B' FRVS recirculation fan was demonstrated OPERABLE.
The I&C. technicians (contractors) involved in this event received formal reprimands and disciplinary suspensions.
This event was reviewed with all maintenance controls supervisory personnel and technicians in a group meeting with the Maintenance Manager.
4.
ACTIONS TAKEN TO PREVENT RECURRENCE:
As described in our response to Notice of Violation 50-354/
87-23-01, which also involved procedural compliance problems, a multi-disciplined working group, chaired by the Maintenance Manager, has been established and is charged with the investigation and development of methods to ensure procedural compliance.
5.
WE ARE IN FULL COMPLIANCE.