In Reply Refer To:
Docket:
50-382/87-21
Louisiana Power & Light Company
ATTN:
J. G. Dewease, Senior Vice President
Nuclear Operations
317 Baronne Street
New Orleans, Louisiana
70160
Gentlemen:
Thank you for your letter, dated December 30, 1987, in response to our letter,
dated November 30, 1987. We have no further questions at this time and will
review your corrective action during a future inspection.
Sincerely,
Original Signed By
L L Callan
L. J. Callan, Director
Division of Reactor Projects
,
cc:
Louisiana Power & Light Company
ATTN:
G. E. Wuller, Onsite
Licensing Coordinator
P.O. Box B
Killona, Louisiana
70066
Louisiana Power & Light Company
l
ATTH:
N. S. Carns, Plant Manager
P.O. Box B
'
Killona, Louisiana
70066
Middle South Services
l
ATTN: Mr. R. T. Lally
P.O. Box 61000
'
New Orleans, Louisiana
70161
Louisiana Power & Light Company
i
ATTN:
K. W. Cook, Nuclear Safety and
'
Regulatory Affairs Manager
317 Baronne Street
P.O. Box 60340
New Orleans, Louisiana
70160
Louisiana Radiation Control Program Director
'
bec:
(seenextpage)
()k
$
0:0
l}hoan
g\\
SPE -
LCallan
DHunn utt:cs
J
1/l)./88
1//A/88
1 41) /88
-
8801200148 880114
3DR
ADOCK0500g2
'
.
I
l
Louisiana Power & Light
-2-
Company
bec to DMB (IE01)
bec distrib by RIV:
RRI
R. D. Martin, RA
Section Chief (DRP/A)
RPSB-DRSS
MIS System
Project Engineer, DRF/A
RSTS Operator
RIV File
J. Wilson, NRR Project Manager
R. Hall
Lisa Shea, RM/ALF
.
l
e n
LO UISI AN A / 317 BARONNE STREET
- p O. BOX 60340
.
(504) 595 3100
POWER & L1GHT
NEW ORLEANS, LOUISIAN A 70160
$00Nbsb
December 30, 1987
A4.05
~
U.S. Nuclear Regulatory Corrission
~
@ 2 0W2 p'
ATTN: Document Control Desk
Washington, D.C. 20555
E3l@
"D
Subject: Waterford 3 SES
Docket No. 50-382
License No. NPF-38
NRC Inspection Report 87-21
Attached is the Louisiana Power & Light Company (LP&L) response to
Violation No. 8721-01 identified in Inspection Report No. 87-21.
If you have any questions on the response, please contact G.E. Wuller,
Operational Licensing, at (504) 464-3499.
l
Very truly yours,
l
r
F.J. Drummond
l
l
Nuclear Services Manager
I
l
FJD:GEW:ssf
l
l
Attachment
ec:
R.D. Martin, NRC Region IV
J.A. Calvo, NRC-NRR
J.H. Wilson, NRC-NRR
l
NRC Resident Inspectors Office
l
W.M. Stevenson
l
E.L. Blake
l
l
-
1
l
4 #')so
hg0
>
oY
Y2
l f>'0
N
amu sount opponrustry suptoven"
'
1
.
. . ' . ' , .
Attechnent to
Page 1 of 2
,
'
LP&L Response to Violation No. 8721-01
VIOLATION NO. 8721-01
Failure to Evaluate Out-of-Calibration Test Equipment in Timely Manner
10 CFR 50, Appendix B, Criterion XVI, Corrective Action, states, in part,
"Measures shall be established to assure that conditions adverse to quality,
such as failures, malfunctions, deficiencies, deviations, defective
material and equipment, and nonconformances are promptly identified and
corrected."
LP&L Procedure UNT-5-009, "Administrative Procedure Dispositioning of M&TE
Nonconformances," dated October 12, 1986, paragraph 5.5. states, "The M&TE
nonconformance evaluation Condition Identification and Work Authorization
(CIWA) must be completed by the department within 30 days from the date of
identification recorded on the originator section of the M&TE
nonconformance evaluation. The 30-day limit may be exceeded in cases where
retest or recalibration of equipment is necessary to evaluate the
nonconformance." Paragraph 5.15 states, "The Operations Quality Assurance
department shall review the completed evaluation for acceptability and
close out the M&TE nonconformance evaluation."
Contrary to the above, three out of five evaluated nonconformance CIWA's
seiteted by the NRC inspector, were found to have exceeded the 30-day
lim. cation imposed by paragraph 5.5, LP&L Procedure UNT-5-009, as
identified above,
Specific CIWA documents are as follows:
CIWA Documents
Originator Date
Completed,
CIWA 031565
March 9, 1987
September 17, 1987
CIWA 031566
March 9, 1987
May 29, 1987
CIWA 031600
March 30, 1987
May 29, 1987
This is a Severity Level IV violation.
RESPONSE
(1) Reason For The Violation
UNT-05-009 "Dispositioning of M&TE Nonconformances" Section 5.5 states
,
"The M&TE nonconformance evaluation Condition Identification Work
l
Authorization (CIWA) must be completed by the department within 30
days from the date of identification recorded on the originator
section of the M&TE nonconformance evaluation." For the three CIWAs
'
identified in the violation #8721-01, two of the three met this
l
requirement. The specific dates for department evaluation completion
l
are as follows:
l
l
ORIG. SECTION OF
DEPARTMENT
CIWA
THE EVALUATION
EVALUATION COMPLETED
CIWA CLOSED
031565
March 4, 1987
March 9, 1987
Sept. 17, 1987
031566
March 4, 1987
May 7, 1987
May 29, 1987
031600
March 25, 1987
April 22, 1987
May 29, 1987
P
-.
, _ . _
. _ . _
- ,-
.
.
.
'
..
' ' ' ' , '
Attach 2Gnt to
.
Page 2 of 2
.
CIWA 031566 did not meet the 30 day limitation as specified in
UNT-5-009.
This CIWA was sent to Nuclear Operations Engineering on
March 9, 1987. The reason for this violation was an inadequate
tracking method ueed to ensure a timely record search completion.
(2) Corrective Actions That Have Been Taken
The Station Information Management System (SIMS) is now employed in
the tracking of M&TE nonconformances.
Each user department is now
responsibic for planning the Work Authorization (WA) within that
department.
A generic work authrrization has been entered into SIMS to provide
consistency in planning by the various depcrtments now responsible for
planning and conducting the evaluations.
SIMS reports are now issued on a weekly basis to all departments thr,t
have record search CI/WAs. This report provides a listing ot' near
term M&TE record c earchea and the responsible groups required to
plan / evaluate them.
The Plant Manager issued letter W3I87-0151 on December 2, 1987, to th.
tasponsible managers explaining the SIMS report, the urgency of timely
evaluation completion, and the sam,le generic work autho71:ation used
for planning. The overdue Records 3earch Evaluations listed in the
Plant Manager's letter have been completed.
(3) Corrective Actions To Be Taken
A proposed revision to UNT-5-009 gives the evaluator the ability to
request an extension in time for performance of the evaluation.
The
reason for the extension will oe documented on the WA along with the
Maintenance Superintendent's approval s'.gnature.
The revision to
UNT-5-009 is scheduled for approval by January 31, 1988.
(4) Date When Full Compliance Will Be Achieved
~
Waterford 3 is in full compliance at this time.
.