Forwards Insp Repts 50-498/87-73 & 50-499/87-73 on 871130-1211.No Violations or Deviations Noted
ML20147D275
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/14/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20147D280 List:
References
NUDOCS 8801200118
Download: ML20147D275 (3)


See also: IR 05000498/1987073

Text

q

-

,

l

.

M~l 4 E

i

!

In Reply Refer To:

Dockets: 50-498/87-73

50-499/87-73

-l

Houston Lighting & Power Company.

ATTN: J. H. Goldberg, Group Vice

President, Nuclear

P.O. Box 1700

Houston, Texas 77001

'

Gentlemen:

This refers to the inspection conduc'ted by Messrs. L. D.' Gilbert, R. C: Haag,  !

and R. B. Vickrey of this office during the period November 30 through )

December 11, 1987,'of activities authorized by NRC Operating. License NPF-71 and 1

Construction Permit CPPR-129 for the South Texas Project, Units 1 and 2, and.to-  ;

the discusaon of our findings with Mr. J.. S. -Phelps and other members of your  ;

staff at the conclusion of the inspection, i

Areas examined during the inspection included selected instrument components-

and systems, welding of reactor vessel internals, mechanical component work  !

observations, and procedure and record review. Within these areas, the

inspection consisted of se')ctive examination of procedures and representative

records, interviews with personnel, and observations by the NRC inspectors.

The inspection findings are documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed By l

L.J. CaUan

L. J. Callan, Director

Division of Reactor Projects

Enclosure: (see next page)

RIV:0PS MQPS MQPS MQPS C:0PS . D:DRS C: DRP/D

RBVickrey;1w RCHaag LGilbert IBarnes WSeidle JMilhoan GLConstable

/ /88 / /88 / /88 / -/88 / /88 / /88 / /88

  • D:DRP W AReconcur *See previous concurrence l

LJCallan WSeidl -

g0\

t/gp/88 / //y/88

8801200118 880114 \\

PDR ADOCK 05000498

g DCD

i

_ . - .. _ _ . - . _ ._ - _ . ._ _ ___--

. ,

s , , .

In Reply Refer To: .

Dockets: 50-498/87-73

'50-499/87-73

Houston Lighting & Power Company

ATTN: J. H. Goldberg, Group Vice .i'

President, Nuclear

P.O. Box 1700

Houston, Texas 77001  :;

1

-Gentlemen:

This refers to the inspection conducted by Messrs. L. D.. Gilbert, R. C. Haag, I

and R. B. Vickrey of this-office during the period November 30 through I

December 11, 1987, of activities authorized by NRC Operating License NPF-71 and

Construction Permit CPPR-129 for the South Texas Project,- Units 1 and 2, and to

the discussion of our findings with Mr. J. S. Phelps and other members of your

.

,

staff at the conclusion of the, inspection. l

l

Areas e;<amined during the inspection included selected instrument components:

and systems, welding of reactor vessel internals, mechanical component'- work

observations, and procedure a'nd record review. Within these areas, the

inspection consisted of selective examination'of procedures and representative

records, interviews with personnel, and observations by the NRC inspectors. The.

inspection findings are documented ir, the enclosed inspection report. J

1

Within the scope of the inspection, no. violations or deviations were  !

identified. .)

i

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items -is identified in.

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, ws:will_be pleased to

discuss them with you.

Sincerely,

L. J. Callan, Director.

Division of Reactor Projects .j

Enclosure: (see next page)

RIV:0PS MQPS2B MQP MQPS p C:0PS 'D: 4 RP/D h

RCHaag LGilbert IBarnes WSeidle JM11 oan onstable

RBVip/88kr

t /> y;iwi /5'/88 i /W /80 ////88 // f/88

i/f/88

f

/ /S'/88

,

0:DRP Reconcur

LJCallan WSeidle

/ /88 / /88

~

->  ?- . ,

,

, . . . .

,

'

.

. , -

/ ,' '

e ,,

4

Houston-Lighting & Power Companyf -2-

'

. , ,

,

o

En' closure:.

Appendix - NRC Inspection Report

'50-498/87-73 '

50-499/87-73

'

cc w/ enclosure:

Houston Lighting & Power Company

ATTN: M Wisenberg, Manager

Nuclear Licensing

P.O. Box 1700

Houston, Texas 77001

Houston l Lighting & Power Company

ATTN: Gerald E. Vaughn, Vice President

Nuclear Operations

P.O. Box 1700

Houston, Texas 77001

Central Power & Light Company

ATTN: R. L. Range /R. P. Verret

P.O.. Box 2121

Corpus Christi, Texas 78403

City Public Service Board

ATTN: R. J. Costello/M. T. Hardt

P.O. Box 1771

San Antonio, Texas 78296

City of Austin

ATTN: M. 8. Lee /J. E. Malaski

P.O. Box 1088

Austin, Texas 78767-8814

Texas Radiation Control Program Director

bec to DM8 (IE01) ,

bec distrib, by RIV:

  • DRP *RRI-0PS

R. D. Martin, RA *RRI-CONST.

  • Section Chief (DRP/D) RPSB-DRSS
  • MIS System *RIV File
  • Lisa Shea, RM/ALF *RSTS Operator

R. Bachmann, 0GC *H. Bundy

  • P. Kadambi, NRR Project Manager *R. Taylor
  • TSS *R. Hall
  • DRS D. Powers
  • L. Gilbert *R. C. Haag
  • R. 8. Vickrey
  • w/766

.

A

1

$ .

s