J l4 Ek~
-
,-
In Reply Refer To:
Dockets:
50-313/87-37
50-368/87-37
Arkansas Power & Light Company
ATTN: Mr. Gene Campbell
Vice President, Nuclear
-Operations
P.O.-Box 551
Little Rock, Arkansas
72203
Gentlemen:
This refers to the inspection conducted by Messrs. R. C. Stewart and R. C. Haag
of this office during the periods October 21-23 and 27-30, 1987, of activities
authorized by NRC Operating Licenses NPF-6 and DPR-51 for Arkansas Nuclear One,
U.:its 1 and 2, and to the discussions of our findings with members of your
staff at the conclusion of the inspection.
Areas examined during the inspection included actions which you have taken-
with regard to the commitments made in the justification for continued
operation (JCO) dated related to the effects of the elevated reactor building
temperatures for Unit 1; and the leakage of the lower
inspection handhole cover on A and B once-through steam generators. Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel and plant observations by
the NRC inspectors.
The inspection findings are documented in the enclosed
inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Orlsin*I SIB
L.1.Cauan
L. J. Callan, Director
Division of Reactor Projects
Enclosure: (see next page)
RIV:RI:DR*
RI*
C:M&QPS* C:DRP/A*
D:DRS*
D:DR
Reconcur:
RCStewart;df
RHaag
IBarnes
JPJaudon
JMilhoan LJCallan
IBarnes
/ /88
/ /88
/ /88
/ /88
/ /88 \\ b /88
//w/88
- See previous concurrence
i
-
8801200075 08011 C
hl
ADOCK )5000313
(
0
-DCD
-
.
..
,
9
%
In Reply Refer To:
Dockets:
50-313/87-37
50-368/87-37
Arkansas Power & Light Company
ATTN:
Mr. Gene Campbell
Vice President, Nuclear
Operations
P.O. Box 551
Little Rock, Arkansas
72203
Gentlemen:
This refers to the inspection conducted by Messrs. R. C. Stewart and R. C Haag
of this office during the perieds October 21-23 and 27-30, 1987, of activities
authorized by NRC Operating Licenses NPF-6 and OPR-51 for Arkansas Nuclear One,
Units 1 and 2, and to the discussions of our findings with members of your
staff at the conclusion of the inspection.
Areas examined during the inspection included actions which you have taken
with regard to the commitments made in the justification for continued
operation (JCO) dated related to the effects of the elevated reactor building
temperatures for Unit 1; and the leakage of the lower
inspection handhole cover on A and 8 once-through steam generators.
Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel and plant observations by
the NRC inspectors.
The inspection findings are documented in the enclosed
inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
L. J. Callan, Director
Division of Reactor Pro *ects
Enclosure: (see next page)
'A
C. B f
0:
0:0RP
tilV: RI: 0RS*
RI *
C:M&QPS * C:
RP/
RCStewart;df
RHaag
IBarnes
JP audon JE
lia d "JMilhopp LJCallan
/ /
/ /
/ /
\\/CJf)
/
\\ /0 /3J
/ /
1
Reconcur:
'
IBarnes
/ /88
- See previous concurrence
- = ~ . .
El
.
. , .
,-
..
'
In Reply Refer To:
Dockets:
50-313/87-37
50-368/87-37
Arkansas Power & Light. Company
ATTN: Mr. Gene Campbell
Vice President, Nuclear
Operations
P.O. Box 551
Little Rock, Arkansas
72203
Gentlemen:
This refers to the inspection conducted by Messrs. R. C. Stewart and R. C. Haag
of this office during the periods October 21-23 and 27-30, 1987, of activities
authorized by NRC Operating Licenses NPF-6 and DPR-51 for Arkansas Nuclear One,
i
Units 1 and 2, and to the discussions of our findings with members of your
staff at the conclusion of the inspection.
Areas examined during the ins.nection included commitment actions associated
with the justification for continued operation as related to the effects of the
elevated reactor building temperatures for Unit 1 and the leakage of the lower
inspection handhole cover on A and 8 once-through steam generators. Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel and plant observations by
the NRC inspectors.
The inspection findings are documented in the enclosed
inspection report.
,
Within the scope of the inspection, no violations or deviations were -
identified.
>
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
l
L. J. Callan, Director -
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-313/87-37
50-368/87-37
i
cc:
(see next page)
/
Reconcur
'
RIV:RI
RI
C:M&QP};gC:DRP/A
C:
D:DRS
D:DRP
C:M&QPS
a
RCStewart;df
RHaadEb
IBarnes
JPJaudon JEGa
tardo JMilhoan LJCallan
IBarnes
/Z/18/ P y
a / M /j'] /2//S /f7
/ /
ll
/ /
/ /
/ l87
i
1
!
I
j
.
'
,
.
.
Arkansas Power & Light Company
-2-
Appendix - NRC Inspection Report
.
50-313/87-37
50-368/87-37
cc w/ enclosure:
J. M. Levine, Director
Site Nuclear Operations
Arkansas Nuclear One
P.O. Box 608
Russellville, Arkansas
72801
Arkansas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RRI
R. D. Martin, RA
RPSB-DRSS
- Section Chief (DRP/A)
- Lisa Shea, RM/ALF
- RIV File
- DRP
- MIS System
- RSTS Operator
"Project Engineer, DRP/A
- G. Dick, NRR Project Manager
- R. Hall
- DRS
- TSS
D. Powers
- R. Stewart
- R.
Haag
- R. Ireland
- w/766
l