Forwards Insp Repts 50-313/87-37 & 50-368/87-37 on 871021-23 & 27-30.No Violations or Deviations Noted
ML20147D143
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 01/14/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20147D149 List:
References
NUDOCS 8801200075
Download: ML20147D143 (4)


See also: IR 05000313/1987037

Text

.

.., ,

'

-

J l4 Ek~

,-

In Reply Refer To:

Dockets: 50-313/87-37

50-368/87-37

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

Vice President, Nuclear

-Operations

P.O.-Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Messrs. R. C. Stewart and R. C. Haag

of this office during the periods October 21-23 and 27-30, 1987, of activities

authorized by NRC Operating Licenses NPF-6 and DPR-51 for Arkansas Nuclear One,

U.:its 1 and 2, and to the discussions of our findings with members of your

staff at the conclusion of the inspection.

Areas examined during the inspection included actions which you have taken-

with regard to the commitments made in the justification for continued

operation (JCO) dated related to the effects of the elevated reactor building

temperatures for Unit 1; and the leakage of the lower

inspection handhole cover on A and B once-through steam generators. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel and plant observations by

the NRC inspectors. The inspection findings are documented in the enclosed

inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Orlsin*I SIB

L.1.Cauan

L. J. Callan, Director

Division of Reactor Projects

Enclosure: (see next page)

RIV:RI:DR* RI* C:M&QPS* C:DRP/A* D:DRS* D:DR Reconcur:

RCStewart;df RHaag IBarnes JPJaudon JMilhoan LJCallan IBarnes

/ /88 / /88 / /88 / /88 / /88 \ b /88 //w/88

  • See previous concurrence

-

i

8801200075 08011 C hl

PDR ADOCK )5000313 (

0 -DCD

.

.. ,

9

%

In Reply Refer To:

Dockets: 50-313/87-37

50-368/87-37

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

Vice President, Nuclear

Operations

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Messrs. R. C. Stewart and R. C Haag

of this office during the perieds October 21-23 and 27-30, 1987, of activities

authorized by NRC Operating Licenses NPF-6 and OPR-51 for Arkansas Nuclear One,

Units 1 and 2, and to the discussions of our findings with members of your

staff at the conclusion of the inspection.

Areas examined during the inspection included actions which you have taken

with regard to the commitments made in the justification for continued

operation (JCO) dated related to the effects of the elevated reactor building

temperatures for Unit 1; and the leakage of the lower

inspection handhole cover on A and 8 once-through steam generators. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel and plant observations by

the NRC inspectors. The inspection findings are documented in the enclosed

inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

L. J. Callan, Director

Division of Reactor Pro *ects

Enclosure: (see next page)

tilV: RI: 0RS*

RCStewart;df

RI *

RHaag

C:M&QPS * C:

IBarnes

RP /

'A

JP audon JE

C. B f 0: 0:0RP

lia d "JMilhopp LJCallan

/ / / / / / \/CJf) / \ /0 /3J / /

1

'

Reconcur:

IBarnes

/ /88

  • See previous concurrence

- = ~ . .

El

.

. , .

,-

..

'

l

In Reply Refer To:

Dockets: 50-313/87-37

50-368/87-37

l

Arkansas Power & Light. Company l

ATTN: Mr. Gene Campbell l

Vice President, Nuclear

Operations

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Messrs. R. C. Stewart and R. C. Haag

of this office during the periods October 21-23 and 27-30, 1987, of activities

authorized by NRC Operating Licenses NPF-6 and DPR-51 for Arkansas Nuclear One, i

Units 1 and 2, and to the discussions of our findings with members of your

staff at the conclusion of the inspection.

Areas examined during the ins.nection included commitment actions associated

with the justification for continued operation as related to the effects of the

elevated reactor building temperatures for Unit 1 and the leakage of the lower

inspection handhole cover on A and 8 once-through steam generators. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel and plant observations by

the NRC inspectors. The inspection findings are documented in the enclosed

inspection report. ,

Within the scope of the inspection, no violations or deviations were -

identified.

>

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely, l

L. J. Callan, Director -

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-313/87-37

50-368/87-37 i

!

cc: (see next page) l

/ Reconcur

'

RIV:RI RI a C:M&QP};gC:DRP/A C: D:DRS D:DRP C:M&QPS

RCStewart;df RHaadEb IBarnes JPJaudon JEGa tardo JMilhoan LJCallan IBarnes

/Z/18/ P y a / M /j'] /2//S /f7 / / ll / / / / / l87 i

1

!

I

j

.

' ,

.

.

Arkansas Power & Light Company -2-

Appendix - NRC Inspection Report .

50-313/87-37

50-368/87-37

cc w/ enclosure:

J. M. Levine, Director

Site Nuclear Operations

Arkansas Nuclear One

P.O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RRI R. D. Martin, RA

RPSB-DRSS *Section Chief (DRP/A)

  • Lisa Shea, RM/ALF *RIV File
  • DRP * MIS System
  • RSTS Operator "Project Engineer, DRP/A
  • G. Dick, NRR Project Manager *R. Hall
  • DRS *TSS

D. Powers *R. Stewart

  • R. Haag *R. Ireland
  • w/766 l

l

l