ML20147C826

From kanterella
Jump to navigation Jump to search
Responds to Util Re Interpretation of Tech Spec 6.9.1.1 Concerning Submittal of Startup Repts.Agrees That Repts Not Necessary When Only Small Number of Fuel Bundles Inserted in Reload for Test Purposes
ML20147C826
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/25/1988
From: Crocker L
Office of Nuclear Reactor Regulation
To: Gucwa L
GEORGIA POWER CO.
References
NUDOCS 8803030170
Download: ML20147C826 (3)


Text

j

~#g-J s

February 25, 1988

[

I Docket Nos.: 50-3?1 i

50-366 Mr. L. T. Gucwa-Manager, Nuclear Safety and Licensing Georgia Power Company l

P. O. Box 4545 Atlanta, GA 30302 i

Dear Mr. Gucwa:

l Your letter of December 29, 1981, provided your interpretation of the requirements of Technical Specification 6.9.1.1 (both units) as regards i

the submittal of start-up reports.

We' agree that such reports are not necessary when only a small number of l

fuel bundles (typically four or ' ewer) of a different design or that have been manufactured by a different vendor are inserted in a re-load core for test purposes. Such a small number of test fuel bundles would be expected I

i to have only a minimal impact on core performance. We would, of course, expect to be notified of any unexpected effects on core performance due to the j

presence of such test fuel assemblies, t

Sincerely, t

1 4

?

J Lawrence P. Crocker, Project Manager Project Directorate !!-3 Division of Peactor Projects I/II J

cc: See next page

)

Concu.rence:

i /

WHedg}b PD PD SRXR PDI -3 i

LCrocker PR es Acting PD l

J/[/88

%/2]/8A U /88 j

$//9/E8

/

1 i

l I

a803030170 00g h PDR ADOCK O PDR P

i

)

t Mr. James P. O'Reilly Edwin I. Hatch Nuclear Plant, Georgia Power Company Units Nos. I and 2 h

CC:

G. F. Trowbridge, Esq.

Shaw, Pittman, Potts and Trowbridge 2300 N Street, N. W.

Washington 0.C.

20037 Mr. L. T. Gucwa Engineering Department Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302 Nuclear Safety and Compliance Manager Edwin I. Hatch Nuclear Plant l

Georgia Power Company P. O. Box 442 Baxley, Georgia 31513 Mr. Louis B. Long Southern Company Services, Inc.

P. O. Box 2625 Birmingham, Alabama 35202 i

Resident inspector U.S. Nuclear Regulatory Comission Route 1. Box 725 Baxley, Georgia 31513 Regional Administrator, Region !!

U.S. Nuclear Regulatory Comission 101 Marietta Street, Suite 2900 Atlanta, Georiga 30323 Mr. Charles H. Badger Office of Planning and Budget Room 610 l

2M Washington Street S.W.

Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Comissioner Department of Natural Resources 270 Washington Street, N.W.

Atlanta, Georgia 30334 Chairman Appling County Comissioners County Courthouse i

Baxley, Georgia 31513 1

L

.g

...v g

i L

f DISTRIPUTION:

i i

tenhot:MM i

NRC A local PDRs i

PDdV.3 Reading j }r i

->..>.a..

nn-___..

n 471 y

,,ii wI

w. w v vi

~

i 0

gw

,>-2 1..

b. 3 w w v u e i 1 y

. [g h

i' m_____

I IW5 bb 3'M7' Y

g J. Sniezek 4

+

6 4

4 h

i i

I 1

1 t

a i

a i

o i

i J.

[

i c

j i

y

)m i

I i

I i

i -

1 i

4 e

f I

I t

t

['

I i

i t

r