Advises of Special Initiative in Late Stages of Planning Entitled, Emergency Operating Procedure (EOP) Insp Program. Purpose of Insp to Verify That EOPs Technically Accurate & Actions Can Be Meaningfully Accomplished
ML20147C627
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/24/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
References
NUDOCS 8803030122
Download: ML20147C627 (2)


Text

_ - - - - _ - - . . - - - -

FB-24128 _,

-In-Repl'y Refer To:

Docket: :STN 50-482 Wolf Creek Nuclear Operating Corporation ATTN: Bart D. Withers

. President and Chief Executive Officer

~P.O. Box.411 Burlington, Kansas 66839 Gentlemen

.This is to advise'you of a- special i.nspection ' initiative 'that is in the late stages of planning. It will include ~ an inspection to be perfomed at the Wolf-Creek Generating Station. The initiative is entitled the "E0P Inspection _

Program." +

r The purpose'of thecinspection'is to verify at' selected sites that-the emergency operating procedures (EOPs) are technically accurate;' that their specified actions can be meaningfully accomplished using existing equipment, controls, and. instrumentation; and that the available procedures have the usability necessary to provide the operator with an effective operating tool.

The inspection program inclu' des a team 1.nspection of four plants for each of-the NSS vendor. types and the Wolf Creek plant was selected as one of the four Westinghouse plants to be inspected. The inspections are to be perfomed in the April through June 1988 timeframe.

The inspection team will include two or three senior reactor inspectors, a licensing examiner, a human factors specialist, and your senior resident inspector (Mr. Bruce Bartlett). The team leader for your inspection will be Mr. Ray Love from Region III. Mr. Love, or one of his supervisors, will be contacting you in the near future to discuss the inspection and to begin negotiating the inspection schedule.

Additional information and details of the program will be provided by your inspection team.

4 C:0P .Dj  : D:DRfG/ Reconcurd JEGag rdo:cs ilhoan i LJCallan pdEGagliarNo 2/9 /t 2/3/88 88 2/g3/88 2/>/88 n /y*o\

..o3o3o m eso22a 7 - -m, p

g-GM O--

y ,. .

s 4 Wolf- Creek' Nuclear Operating - Corporation

If you have any questions'in the' interim regarding this inspection prcgram, we would be pleased to discuss them with you.

_ Signed By.

@J.. E. Callan L~. J. Callan, Director Division of Reactor Projects

'cc:: ..

.Wolf Creek Nuclear Operating Corporation ATTN: Otto Maynard, Manager

'of Licensing

.P.O. Box 411 Burlington, Kansas 66839

' Wolf Creek Nuclear Operating Corporation ATTN: Gary Boyer, Plant Manager -

P.O. Box 411 .  :

Burlington, Kansas 66839 l

' Kansas Corporation Comission ATTN: -Robert D. Elliott, Chief Engineer -

Fourth Floor, Docking State Office Building '

. Topeka, Kansas 66612-1571

.Kanses Radiation Control Program Director bec to DMB (IE01) bec distrib. by RIV-RRI R. D. Martin, RA SectionChief(DRP/A) DRP  ;

RPSB-DRSS J. M. Hinds, RIII c RIV File 'Callaway, RIII MIS System RSTS Operator Project Engineer DRP/A R. Hall  !

Lisa Shea, RM/ALF P. O'Connor, NRR Project Manager DRS TSS F. Gillespie, NRR Myron Karman, ELD, MNBB ,

i W. Regan, NRR.

J. Persensky, NRR r J. Wright, RIII  !

R. Love, RIII l Division Director, RI Division Director, RII Division Director, RIII  ;

Division' Director, RV

_.