b-
i
UNITED sT ATEs
~
h
go 08 cog.
' NUCLEAR REGULATORY COMMISSION
o
'o
chb' f
q
" ' '
,
$
S
.10W AR
T STREET,NW
7
/
^
ATLANT A, GEORGI A 30303
f
f
%-/
%,
NOV 0 81978
- * " *
.Zn Reply. Refer To:
RIZ:JKR
50-416/78-16, 50-417/78-16
,
Mississippi Power and Light Company
Mr. Norris L. Stampley
ATTN:
Vice President of Production
P. O. Box 1640
Jackson, Mississippi
39205
Gentlemen:
This ref ers to the inspection conducted by J. K. Rausch of this
C
of activities authorized by NR
office on October 10-13, 1978,
f
Construction Permit Nos. CPPR-118 and CPPR-119 for t
i
Nucl. ear Power Plant, Unit 1 and 2 facility, and to the discuss on
the conclusion of the
of our findings held with T. E. Reaves at
inspection.
d
Areas examined during the inspection and our findings are discusse
Within these areas, the in-
in the enclosed inspection report.
,
d
'
spection consisted of selective examinations of proc
b
tions
by the inspectors.
Within the scope of this inspection, no items of noncompliance
were disclosed.
In accordance with Section 2.790 of the NRC's
Public
'
and the enclosed inspection report wiLL be placed in the NRC s
Part
information that you (or
Document Room. .If this report contains any it is necessary that you
believe to be proprietary,
ffice to withhold
.your contractor)make a written application within 20 days to this oAny suc
such inf ormation f rom public disclosure.of the reasons on the basis of which
it is
ed
include a full statementclaimed that.the information is proprietary, and s
ified in the application is
information ident
If we do not hear fror
so that proprietary
contained in a separate part.of the document.
will be
you in this regar_d within the specified period, the report
placed in the Public Document Room.
7812.18o3q
'
.
NOV 0 8 1978
'
Mississippi Power and Light Company
-2-
Should you have any questions concerning this letter, we will be
glad to discuss them with you.
Sincerely,
-
-
-
,,
,
e
'
.-s.
i
.
Charles E. Murphy,,' Chief
Reactor Construction and Engineering
Support Branch
Enclosures:
Inspection Report Nos.
50-416/78-16
and 50-417/78-16
cc w/enet:
Mr. W. L. Nail
Plant Superintendent
P. O. Box 756
Port Gibson, Mississippi
39150