Confirms Date of 880314 for Environ Qualification Insp Per 880209 Telcon.Insp Will Take Place at Licensee Corporate Ofc Berlin,Ct w/1 Day Plant Visit on 880316
ML20147C189
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/25/1988
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 8803030026
Download: ML20147C189 (3)


Text

-

8 e-FEB 2 51988 Docket No.

50-423 Northeast Nuclear Energy Company ATTN: Mr. E. J. Mroczka Senior Vice President - Nuclear Engineering and Operations Group P. O.' Box 270 Hartford, Connecticut 06141-0270 Gentlemen:

Subject:

10 CFR 50.49 ENVIRONMENTAL QUALIFICATION INSPECTION, MILLSTONE 3 NUCLEAR POWER PLANT (50-423/88-04)

This letter confirms the dates of March 14, 1988 for the NRC 10 CFR 50.49 environmental qualification (EQ) inspection of Millstone 3.

These dates were established during a conference call on February 9, 1988 between Mr. B. A. Tuthill of your organization and Mr. R. Paolino of the NRC Region I office. The inspec-tion will take place at the licensee's corporate office in Berlin, Connecticut, with a one day plant visit on Wednesday, March 16, 1988.

A management entrance meeting is scheduled for 2:00 p.m. on March 14, 1988.

The management exit meeting 1s tentatively scheduled for 10:00 a.m. on March 18, 1988.

The inspection will include the following:

1.

Review of your implementation of 10 CFR 50.49 EQ program, including preservation of qualified status of equipment.

2.

Review of your implementation of Technical Evaluation Report / Safety Evaluation Report EQ corrective action commitments.

3.

Review of EQ documentation files.

4.

Physical inspection of equipment from the Master List.

One week prior to the inspection we will need copies of each document identified in attachment 1, items 1 through 6.

A duplicate copy should be sent to:

Uldis Potapovs, Chief Equipment Qualification Inspection Section White Flint North - 94 U. S. Nuclear Regulatory Commission Washington, DC 20555 l$[0gb0$ $ o 23 I

PDR

..FICIAL RECORD COPY PAOLIN010/21/87 - 0001.0.0 G

02/22/88 ry L-

]

G Northoast Nuclear Energy Company 2

Your cooperation with us during this inspection will be appreciated.

Should you have any questions regarding this inspection, you can contact Mr. R. Paolino at (215) 337-5285 or Mr. C. Anderson at (215) 337-5376.

Sincerely, g *. s ** m127:

. 7. L... :

-/,5

[' [

William V. Johnston Acting Director Division of Reactor Safety

/'

cc w/ enc 1:

W. D. Romberg, Vice President, belearOperations D. O. Nordquist, Manager of Qu ity Assurance P. M. Kacich, Manager, Generation Facilities Licensing S. E. Scace, Station Superintendent Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector State of Connecticut bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief S. Pindale, RI, Beaver Valley W. Raymond, SRI, Millstone 1&2 R. Ferguson, LPM, NRR R. Bores, DRSS U. Potapovs, NRR gy RI:Dl0

-[

c,

.) J f

RS RI:DRS RI:DRS Paolino/rw Anderson E pen - B., a 2/10/88 2/j3/88 2/g/88 0FFICIAL RECORD COPY PAOLIN010/21/87 - 0002.0.0 02/10/88

c)

ATTACHMENT 1 4

REFERENCES

-1.

Licensee's overall EQ Program 2.

NRC Safety Evaluation Reports concerning environmental qualification of safety-related electrical equipnent.

3 Master List, version in effect at time of inspection.

4.

a.

Generic Letter 84-24, 0.G. Eisenhut to Licensee's and Applications, dated December 27, 1984,

Subject:

Certification of Compliance to 10-CFR 50.49.

b.

Licensee's response to Generic Letter 84-24.

5.

Licensee's current System Component Evaluation Worksheets (SCEW sheets) or equivalent (earlier SCEW sheets may have been included in previous licensee submittals).

6.

Licensee's procedures applicable to equipment qualification (EQ) program, procurement of qualified equipment, maintenance of qualified equipment, EQ documentation, modifications to EQ equipment, EQ personnel training (site and corporate personnel), QA/EQ interface including corporate QA, Site QA/QC audits, EQ spare parts procurement and licensee program for EQ related NRC Information Notices / Bulletins.

7.

  • Licensee's qualification documentation and/or EQ files.
  • These documents must be available for the inspectors use throughout the inspection.

1