ML20147C181

From kanterella
Jump to navigation Jump to search
Forwards LER 78-071/03L-0
Date released: 06/09/2020 Download: ML20147C181


/03L-0 on 781117:procedure HNP-2-3003 Was Not Completed W/In Specified Interval Per Tech Specs 4.3.1.1(4) for Instru 2B21-N017D.Caused by Personnel Repairing 2 Other Instru & Procedure Had to Be Stopped Due to Repairs
ML20147C194
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/01/1978
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20147C194 (2)
Forwards LER 78-071/03L-0
ML20147C176
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/01/1978
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20147C176 (1)