NARRATIVE

SUMMARY

OF tiONTHLY OPERATING EXPERIENCE UNIT I JANUARY, 1988 January 1 The Unit remained shutdown for refueling.

through January 31 4

n

-1

((L

8803020280 880131

\\f \\

PDR ADOCK 05000334 R

.pcp

r-1 o

OPERATING DATA REPORT DOCKET NO.:

50-334 REPORT DATE:

02/06/88 COMPLETED BY: M.A.WINGER TELEPHONE:

(412) 643 1825 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: JANUARY 1988
3. LICENSED THERMAL POWER (MWt):

2660

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

835

6. MAX. DEPENDABLE CAPACITY (Gross KWe):

860

7. MAX. DEPENDABLE CAPACITY (Net KWe):

810

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

744.0 744.0 103032.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

0.0 0.0 59184.2

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 4482.8

14. HOURS GENERATOR WAS ON LINE:

0.0 0.0 57654.2

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

0.0 0.0 136917319.5

17. GROSS ELECT ENERGY GEN. (MWH):

0.0 0.0 43865720.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

3200.0 3200.0 40922493.0

19. UNIT SERVICE FACTOR: (PERCENT) 0.0 0.0 58.3
20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 0.0 58.3
21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 0.0 52.3
22. UNIl CAPACITY FACTOR (DER): PCT 0.0 0.0 50.8
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 19.7 24 SHUIDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: FEB.25.1088
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

r-s.

AVERAGE DAlLi UNIT POWER LEVE1.

DOCKETNo.

N'334 UNIT 3'.*? S Wi: J1 2/10/88 DAM COMPLETED SY H.A. Winger,,

TTLIPHONE G12) 643-1825 MONTy January DAY AVERACE DAILY POWER LIVEL DAY AVERAGE DAILY POWER LEVEL t MWe, Net) ggw, g 3 1

0 o

,7 2

0

,g o

0 o

3 g

0 o

4 5

0 0

,3 6

0 0

n 7

0 0

3 3

0 o

4 0

0 9

,3 10 0

3 o

II O

27 o

12 0

,3 n

13 n

29 0

14 0

0 30 15 0

3, o

16 0

INSTRUCTIONS

  • a-e let r mh 4 in the recocting nu,nen, c.,,npute,o t

at t nule at it I77) 3

i UNf! SIMJIDOWNS AND POWER REEMKISONS EMKRE T NO.

50-lit, UNIr NAME BV PS Useit II IDAIE 2/10/88 REFOftT MONIH January COMPLEIFis my M.A. Winger _

IELE rl00NE (412) 643-1825 m

e.

c~

'* ee o o*

O CU Licensee e

o Cause & Corrective No.

Date

?.

3 I', *.

Event 0e S*

.o Action to S

$3 sS" Report #

y*$

  • j n

Prevent Recurrence H

O m

u oo 1

880101 S

744 C

4 N/A ZZ ZZZZZZ The Unit remained shutdown the entire month for the Unit's Sixth Refueling Outage.

.s-e c

I 2

3,,g,,4:

I~ l-wieJ Reas. e 4

3.,3ue.es c. 3..e.

6..s 5 5 liedw'rJ A f equipmesw Iaslese(I oplaisel g

,e,,,

g g.

P cpasas... paea R Maiseenesete s* Tess 2-m at scree i ness Sle(res s.w I se rns<c C Refering 3 4.g agge scra.

l iens M.gwe el l M B l eir tnt 8Mi t; ll RrFeelatew) Rcssektiesse i

4-ContiseaseJ From Frevlees Ptosette Ule.Il 5

I th.reague Italeessig A lesense I smessenaci ne

$_g,f,,c,go, I AJnanestemeeve 9-Other 5

f. Orreaes. at I e..

lI api,ne3 I si,.tne i. L.n.- %...

Pe/Fil ilihisceel331a )

e

m r

NARRATIVE SUliMARY OF MONTHLY OPERATING EXPERIENCE UNIT !!

JANUARY, 1988 January 1 The Unit operated at a nominal value of 100% output.

through January 26 January 27 At 0152 hours0.00176 days <br />0.0422 hours <br />2.513228e-4 weeks <br />5.7836e-5 months <br />, the Unit tripped after the 'A' 4KV Bus became de-energized causing the ' A' Reactor Coolant Pump to trip.

January 28 The Unit remained shutdown for scheduled maintenance.

through January 31 lppF" i

OPERATING DATA REPORT DOCKET NO.-

50 412 REPORT DATE:

02/08/88 COMPLETED BY: M.A.WINGER TELEPHONE:

(412) 643-1825 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: JANUARY 1988
3. LICENSED THERMAL POWER (MWt):

2660

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

836

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

885

7. MAX. DEPENDABLE CAPACITY (Net MWe):

833

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PER'10D:

744.0 744.0 1815.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

625.9 625.9 1591.4

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR WAS ON LINE:

625.9 625.9 1575.7

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MVH):

1647518.0 1647518.0 4033155.4 l

17. GROSS ELECT. ENERGY GEN. (MWH):

535800.0 535800.0 1318000.0

18. NET ELECTRICAL ENERGY GEN, (MVH):

506550.0 506550.0 1244654.0

19. UNIT SERVICE FACTOR: (PERCENT) 84.1 84.1 86.8 l
20. UNIT AVAILABILITY FACTOR:(PERCENT) 84.1 84.1 86.8
21. UNIT CAPACITY FACTOR (MDC): PCT 81.7 81.7 82.3
22. UNIT CAPACITY FACTOR (DER): PCT 81.4 81.4 82.0
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 7.1 1
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):

N/A

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: FEB.10.1488
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A 08/04/87 INITIAL ELECTRICITY N/A 08/17/87 COMMERCIAL OPERATION 11/87 11/17/87

r AVERAGE DAILY UNIT ?CWER LIVEL 00CXIT No.

50-412 (y17 BVPS Unit 2 DATE 2/10/88 COMPLITED SY M.A. Winger TELEPHONE (412) 643-1825 MONTH Januarv OAY AVERAGE DAILY POWER LIVEL DAY AVERAGE DAILY POWER LIVEL lMWe-NetI (Mweec) 814 810 g7 810 814 gg 3

818 g,

806 4

814 30 310 814 810 g

,3 6

810 810 g

7 814 810

)

g 814 803

4 9

810 814

,3 10 814

g 814 11 809
7 41 810 o

12 810 o

13 14 814 o

3, 13 814 0

3g 16 810 INSTRUCTIONS On this format har the actase d:ily unit timer 'eut in MWe Net f,sr e:ch day in the repi,vring m. nth.C.innute..

the nearest whole mepwati.

itir771 i

= _.. _ __

... _ = _

-t l

UNII sitte aI) OWNS AND FOWER REEMKi30NS EMK RE T NO. 50-417 UNiiNAME, EVPS tinit 2 DAIE 2/10/88 NEF00tTAGONIH January COMPLElf ts gy M.A. Winger _

IELEF900NE (412) 643-1825 m

8 g: n w ee o oe a

oSt Licensee Cause & Corrective 4

[]o.

Date y5 2

UE Event 8

Action to Q

g5 3

f$"

Report I as o ao Prevent Recurrence e

o W

jag N"

0 oo I

880127 F

0 A

3 88-02 EB ELECON At 0152 hours0.00176 days <br />0.0422 hours <br />2.513228e-4 weeks <br />5.7836e-5 months <br /> on the 27th, the Unit tripped af ter the

'A' 4KV bus became de energized. The Unit remained f

shutdown through the end of the month fo-troubleshooting.

2 880127 S

118.1 B

9 N/A CA VESSEL The Unit remained shutdown to perform scheduled maintenance on a leaking pressurizer manway.

i i

1 2

3 4

I F.=.eJ Reas.

se,e s,.a :

I.siedes G - Inse. ek.is 5 LlerJ #cJ A f.gisernerne I melvec (I arlateil a _se t

8.= F cpaesse..=..e Desa R Maasseesissise e.e Tess 2-esa at seram I nees Sleues e.= 1 ens <c

(' Refuel %

3-a.a atie serse 8*cas N.g*=sei1 MsIas<tNIeMIf.

D NrF'elasew) Messekte.see 4-Cent ia.e4 Free Previous Moatin Elle.I l I t),.reas.

lealaw.g A 1 s case I sansenathus beeN t im I AJuanesenoeoc 9_ o, g,,,

5 1

8. O.reass. moat I se.o iI splacesi I sluine i S sum %.u...-

1 gsff7) 33eht.c,g3,g.3,,,3 l

l

-e4

'Af Telephone (412) 393-6000

.o. Box 4 Shippingport, PA 15077 0004 Februa ry 10. 1988 Beaver Valley Power Station-Unit 1 - Docket No. 50-334, License No. DPR-66 l

Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Director. Office of Management Information & Program Control Washington, D. C. 20555 Gentlemen :

r In accorda nce with Appendix A Technical Specifications, the Monthly Operating Report is submitted for Unit 1 and Unit 2 for the month of January, 1988.

t very truly yours,

dab

. D. Si e be r '

j Vice President Nuclear. 0perations Imd Enclosures o# :#

G9 cc: NRC Regional Office k /

King of Prussia, PA g.>

f-6,/

I>f.W, CS 9

.