OF tiONTHLY OPERATING EXPERIENCE UNIT I JANUARY, 1988 January 1 The Unit remained shutdown for refueling.
through January 31 4
n
-1
((L
8803020280 880131
\\f \\
PDR ADOCK 05000334 R
.pcp
r-1 o
OPERATING DATA REPORT DOCKET NO.:
50-334 REPORT DATE:
02/06/88 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 643 1825 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: JANUARY 1988
- 3. LICENSED THERMAL POWER (MWt):
2660
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross KWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net KWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744.0 744.0 103032.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
0.0 0.0 59184.2
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
0.0 0.0 57654.2
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
0.0 0.0 136917319.5
- 17. GROSS ELECT ENERGY GEN. (MWH):
0.0 0.0 43865720.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
3200.0 3200.0 40922493.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 0.0 0.0 58.3
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 0.0 58.3
- 22. UNIl CAPACITY FACTOR (DER): PCT 0.0 0.0 50.8
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 19.7 24 SHUIDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: FEB.25.1088
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
r-s.
AVERAGE DAlLi UNIT POWER LEVE1.
DOCKETNo.
N'334 UNIT 3'.*? S Wi: J1 2/10/88 DAM COMPLETED SY H.A. Winger,,
TTLIPHONE G12) 643-1825 MONTy January DAY AVERACE DAILY POWER LIVEL DAY AVERAGE DAILY POWER LEVEL t MWe, Net) ggw, g 3 1
0 o
,7 2
0
,g o
0 o
3 g
0 o
4 5
0 0
,3 6
0 0
n 7
0 0
3 3
0 o
4 0
0 9
,3 10 0
3 o
II O
27 o
12 0
,3 n
13 n
29 0
14 0
0 30 15 0
3, o
16 0
INSTRUCTIONS
- a-e let r mh 4 in the recocting nu,nen, c.,,npute,o t
at t nule at it I77) 3
i UNf! SIMJIDOWNS AND POWER REEMKISONS EMKRE T NO.
50-lit, UNIr NAME BV PS Useit II IDAIE 2/10/88 REFOftT MONIH January COMPLEIFis my M.A. Winger _
IELE rl00NE (412) 643-1825 m
e.
c~
'* ee o o*
O CU Licensee e
o Cause & Corrective No.
Date
?.
3 I', *.
Event 0e S*
.o Action to S
$3 sS" Report #
y*$
- j n
Prevent Recurrence H
O m
u oo 1
880101 S
744 C
4 N/A ZZ ZZZZZZ The Unit remained shutdown the entire month for the Unit's Sixth Refueling Outage.
.s-e c
I 2
3,,g,,4:
I~ l-wieJ Reas. e 4
- 3.,3ue.es c. 3..e.
6..s 5 5 liedw'rJ A f equipmesw Iaslese(I oplaisel g
,e,,,
g g.
P cpasas... paea R Maiseenesete s* Tess 2-m at scree i ness Sle(res s.w I se rns<c C Refering 3 4.g agge scra.
l iens M.gwe el l M B l eir tnt 8Mi t; ll RrFeelatew) Rcssektiesse i
4-ContiseaseJ From Frevlees Ptosette Ule.Il 5
I th.reague Italeessig A lesense I smessenaci ne
$_g,f,,c,go, I AJnanestemeeve 9-Other 5
- f. Orreaes. at I e..
lI api,ne3 I si,.tne i. L.n.- %...
Pe/Fil ilihisceel331a )
e
m r
NARRATIVE SUliMARY OF MONTHLY OPERATING EXPERIENCE UNIT !!
JANUARY, 1988 January 1 The Unit operated at a nominal value of 100% output.
through January 26 January 27 At 0152 hours0.00176 days <br />0.0422 hours <br />2.513228e-4 weeks <br />5.7836e-5 months <br />, the Unit tripped after the 'A' 4KV Bus became de-energized causing the ' A' Reactor Coolant Pump to trip.
January 28 The Unit remained shutdown for scheduled maintenance.
through January 31 lppF" i
OPERATING DATA REPORT DOCKET NO.-
50 412 REPORT DATE:
02/08/88 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 643-1825 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: JANUARY 1988
- 3. LICENSED THERMAL POWER (MWt):
2660
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
885
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
833
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PER'10D:
744.0 744.0 1815.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
625.9 625.9 1591.4
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE:
625.9 625.9 1575.7
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MVH):
1647518.0 1647518.0 4033155.4 l
- 17. GROSS ELECT. ENERGY GEN. (MWH):
535800.0 535800.0 1318000.0
- 18. NET ELECTRICAL ENERGY GEN, (MVH):
506550.0 506550.0 1244654.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 84.1 84.1 86.8 l
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 84.1 84.1 86.8
- 22. UNIT CAPACITY FACTOR (DER): PCT 81.4 81.4 82.0
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 7.1 1
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
N/A
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: FEB.10.1488
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A 08/04/87 INITIAL ELECTRICITY N/A 08/17/87 COMMERCIAL OPERATION 11/87 11/17/87
r AVERAGE DAILY UNIT ?CWER LIVEL 00CXIT No.
50-412 (y17 BVPS Unit 2 DATE 2/10/88 COMPLITED SY M.A. Winger TELEPHONE (412) 643-1825 MONTH Januarv OAY AVERAGE DAILY POWER LIVEL DAY AVERAGE DAILY POWER LIVEL lMWe-NetI (Mweec) 814 810 g7 810 814 gg 3
818 g,
806 4
814 30 310 814 810 g
,3 6
810 810 g
7 814 810
- )
g 814 803
- 4 9
810 814
,3 10 814
- g 814 11 809
- 7 41 810 o
12 810 o
13 14 814 o
3, 13 814 0
3g 16 810 INSTRUCTIONS On this format har the actase d:ily unit timer 'eut in MWe Net f,sr e:ch day in the repi,vring m. nth.C.innute..
the nearest whole mepwati.
itir771 i
= _.. _ __
... _ = _
-t l
UNII sitte aI) OWNS AND FOWER REEMKi30NS EMK RE T NO. 50-417 UNiiNAME, EVPS tinit 2 DAIE 2/10/88 NEF00tTAGONIH January COMPLElf ts gy M.A. Winger _
IELEF900NE (412) 643-1825 m
8 g: n w ee o oe a
oSt Licensee Cause & Corrective 4
[]o.
Date y5 2
UE Event 8
Action to Q
g5 3
f$"
Report I as o ao Prevent Recurrence e
o W
jag N"
0 oo I
880127 F
0 A
3 88-02 EB ELECON At 0152 hours0.00176 days <br />0.0422 hours <br />2.513228e-4 weeks <br />5.7836e-5 months <br /> on the 27th, the Unit tripped af ter the
'A' 4KV bus became de energized. The Unit remained f
shutdown through the end of the month fo-troubleshooting.
2 880127 S
118.1 B
9 N/A CA VESSEL The Unit remained shutdown to perform scheduled maintenance on a leaking pressurizer manway.
i i
1 2
3 4
I F.=.eJ Reas.
se,e s,.a :
I.siedes G - Inse. ek.is 5 LlerJ #cJ A f.gisernerne I melvec (I arlateil a _se t
8.= F cpaesse..=..e Desa R Maasseesissise e.e Tess 2-esa at seram I nees Sleues e.= 1 ens <c
(' Refuel %
3-a.a atie serse 8*cas N.g*=sei1 MsIas<tNIeMIf.
D NrF'elasew) Messekte.see 4-Cent ia.e4 Free Previous Moatin Elle.I l I t),.reas.
lealaw.g A 1 s case I sansenathus beeN t im I AJuanesenoeoc 9_ o, g,,,
5 1
- 8. O.reass. moat I se.o iI splacesi I sluine i S sum %.u...-
1 gsff7) 33eht.c,g3,g.3,,,3 l
l
-e4
'Af Telephone (412) 393-6000
.o. Box 4 Shippingport, PA 15077 0004 Februa ry 10. 1988 Beaver Valley Power Station-Unit 1 - Docket No. 50-334, License No. DPR-66 l
Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Director. Office of Management Information & Program Control Washington, D. C. 20555 Gentlemen :
r In accorda nce with Appendix A Technical Specifications, the Monthly Operating Report is submitted for Unit 1 and Unit 2 for the month of January, 1988.
t very truly yours,
dab
. D. Si e be r '
j Vice President Nuclear. 0perations Imd Enclosures o# :#