ML20147B990

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jan 1988
ML20147B990
Person / Time
Site: Beaver Valley
Issue date: 01/31/1988
From: Sieber J, Winger M
DUQUESNE LIGHT CO.
To:
NRC
References
NUDOCS 8803020280
Download: ML20147B990 (9)


Text

( - -

, NARRATIVE

SUMMARY

OF tiONTHLY OPERATING EXPERIENCE UNIT I JANUARY, 1988 January 1 The Unit remained shutdown for refueling.

through January 31 n 4

-1 ((L

8803020280 880131 PDR \f \

R ADOCK 05000334

.pcp

r- 1

.- o .

OPERATING DATA REPORT DOCKET NO.: 50-334 REPORT DATE: 02/06/88 COMPLETED BY: M.A.WINGER TELEPHONE: (412) 643 1825 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: JANUARY 1988
3. LICENSED THERMAL POWER (MWt): 2660
4. NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 835
6. MAX. DEPENDABLE CAPACITY (Gross KWe): 860
7. MAX. DEPENDABLE CAPACITY (Net KWe): 810
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 744.0 744.0 103032.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 0.0 0.0 59184.2
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
14. HOURS GENERATOR WAS ON LINE: 0.0 0.0 57654.2
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MWH): 0.0 0.0 136917319.5
17. GROSS ELECT ENERGY GEN. (MWH): 0.0 0.0 43865720.0
18. NET ELECTRICAL ENERGY GEN. (MWH): 3200.0 3200.0 40922493.0
19. UNIT SERVICE FACTOR: (PERCENT) 0.0 0.0 58.3
20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 0.0 58.3
21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 0.0 52.3
22. UNIl CAPACITY FACTOR (DER): PCT 0.0 0.0 50.8
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 19.7 24 SHUIDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: FEB.25.1088
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

r- .

s. .

. AVERAGE DAlLi UNIT POWER LEVE1.

DOCKETNo. N'334 UNIT 3'.*? S Wi: J1 DAM 2/10/88 COMPLETED SY H.A. Winger,,

TTLIPHONE G12) 643- 1825 MONTy January DAY AVERACE DAILY POWER LIVEL DAY AVERAGE DAILY POWER LEVEL t MWe, Net) ggw, g 3 1 0 ,7 o 2 0 ,g o 3

0 o g

0 o 4

0 0 5 ,3 0 0 6 n 7 0 0

-- 3 3

0 o 4

0 0 9 ,3 10 0 o 3 ,

II O 27 ,

o 12 0 n

,3 13 n 0 29 14 0 0 30 15 0 o 3,

16 0 INSTRUCTIONS

' "

  • a- e let r mh 4 in the recocting nu,nen, c.,,npute ,o t at t nule at it I77) 3

i .

50-lit, UNf! SIMJIDOWNS AND POWER REEMKISONS EMKRE T NO.

UNIr NAME BV PS Useit II .

IDAIE 2/10/88 .

REFOftT MONIH January COMPLEIFis my M.A. Winger _

IELE rl00NE (412) 643-1825 m

e.

c~

o*

'* ee o

    • O
  • e CU Licensee No. ". 3 I', *.

o Cause & Corrective Date .o  ?.

Event 0e S* Action to H

S O

$3 "

n sS" Report # *j $ Prevent Recurrence y*$ m u o

o 1 880101 S 744 C 4 N/A ZZ ZZZZZZ The Unit remained shutdown the entire month for the Unit's Sixth Refueling Outage.

s-e c

I 2 I~ l-wieJ Reas. e 3 ,,g,,4: 4 5 5 liedw'rJ 3. ,3ue.es c . 3..e. 6..s A f equipmesw Iaslese(I oplaisel g ,e,,, g g. P cpasas . .. paea R Maiseenesete s* Tess 2-m at scree C Refering i ness Sle(res s.w I se rns<c 3 4.g agge scra. l iens M.gwe el l M B l eir tnt 8Mi t; ll RrFeelatew) Rcssektiesse 4-ContiseaseJ From Frevlees Ptosette Ule.Il I th.reague Italeessig A lesense I smessenaci ne $_g,f,,c,go, I AJnanestemeeve 9-Other 5

f. Orreaes. at I e.. lI api,ne3 .

I si,.tne i . L.n.- %...

Pe/Fil ilihisceel331a )

e

_ m r .

NARRATIVE SUliMARY OF MONTHLY OPERATING EXPERIENCE UNIT !!

JANUARY, 1988 January 1 The Unit operated at a nominal value of 100% output.

through January 26 January 27 At 0152 hours0.00176 days <br />0.0422 hours <br />2.513228e-4 weeks <br />5.7836e-5 months <br />, the Unit tripped after the 'A' 4KV Bus became de-energized causing the ' A' Reactor Coolant Pump to trip.

January 28 The Unit remained shutdown for scheduled maintenance.

through January 31 lppF" i OPERATING DATA REPORT DOCKET NO.- 50 412 REPORT DATE: 02/08/88 COMPLETED BY: M.A.WINGER TELEPHONE: (412) 643-1825 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: JANUARY 1988
3. LICENSED THERMAL POWER (MWt): 2660
4. NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 836
6. MAX. DEPENDABLE CAPACITY (Gross MWe): 885
7. MAX. DEPENDABLE CAPACITY (Net MWe): 833
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
11. HOURS IN REPORTING PER'10D: 744.0 744.0 1815.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 625.9 625.9 1591.4
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR WAS ON LINE: 625.9 625.9 1575.7
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MVH): 1647518.0 1647518.0 4033155.4
17. GROSS ELECT. ENERGY GEN. (MWH): 535800.0 535800.0 l 1318000.0
18. NET ELECTRICAL ENERGY GEN, (MVH): 506550.0 506550.0 1244654.0
19. UNIT SERVICE FACTOR: (PERCENT) 84.1 84.1 86.8 l
20. UNIT AVAILABILITY FACTOR:(PERCENT) 84.1 84.1 86.8
21. UNIT CAPACITY FACTOR (MDC): PCT 81.7 81.7 82.3
22. UNIT CAPACITY FACTOR (DER): PCT 81.4 81.4 82.0  ;
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 7.1 1
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH): l N/A
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: FEB.10.1488
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A 08/04/87 INITIAL ELECTRICITY N/A 08/17/87 COMMERCIAL OPERATION 11/87 11/17/87

r -

, AVERAGE DAILY UNIT ?CWER LIVEL 00CXIT No. 50-412 (y17 BVPS Unit 2 DATE 2/10/88 COMPLITED SY M.A. Winger TELEPHONE (412) 643-1825 MONTH Januarv OAY AVERAGE DAILY POWER LIVEL DAY AVERAGE DAILY POWER LIVEL lMWe-NetI (Mweec)

814 g7 810
810 gg 814 3 818 g, 806 4 814 30 310 g 814 810

,3 6 810 g 810 814 810 7  :)

g 814 ;4 803 9 810 ,3 814 10 814 ;g 814 11 809 ;7 41 ,

810 o 12 ,

l 13 810 o 14 814 o 3,

13 814 3g 0 16 810 INSTRUCTIONS  ;

On this format har the actase d:ily unit timer 'eut in MWe Net f,sr e:ch day in the repi,vring m. nth.C.innute . .

the nearest whole mepwati.

itir771 l

l i

_ = _ . . _ __ _ _ _ _ . . . _ = _ __ . . _ _ _ __ _

-t l

  • UNII sitte aI) OWNS AND FOWER REEMKi30NS EMK RE T NO. 50-417 ,

UNiiNAME, EVPS tinit 2 .

DAIE 2/10/88 NEF00tTAGONIH January COMPLElf ts gy M.A. Winger _

IELEF900NE (412) 643-1825 m

8 g: n w ee o oe a oSt Licensee 4 Cause & Corrective

[]o . Date ". y5 2 UE Event 8

Action to Q g5 3 f$" Report I as o ao e o W jago N" Prevent Recurrence 0

o I 880127 F 0 A 3 88-02 EB ELECON At 0152 hours0.00176 days <br />0.0422 hours <br />2.513228e-4 weeks <br />5.7836e-5 months <br /> on the 27th, the Unit tripped af ter the 'A' 4KV bus became de energized. The Unit remained f shutdown through the end of the month fo- troubleshooting.

2 880127 S 118.1 B 9 N/A CA VESSEL The Unit remained shutdown to perform scheduled maintenance on a leaking ,

pressurizer manway.

i i 1 2 F.=.eJ 3 4 I Reas. se,e s,.a :

5 LlerJ #cJ I.siedes G - Inse. ek.is A f.gisernerne I melvec (I arlateil a _se t 8.= F cpaesse..= ..e Desa R Maasseesissise e.e Tess 2-esa at seram I nees Sleues e.= 1 ens <c

(' Refuel % 3-a.a atie serse 8*cas N.g*=sei1 MsIas<tNIeMIf.

D NrF'elasew) Messekte.see 4-Cent ia.e4 Free Previous Moatin Elle.I l I t),.reas. lealaw.g A 1 s case I sansenathus beeN t im I AJuanesenoeoc 9_ o, g,,, 5 1

1 8. O .reass. moat I se.o iI splacesi ,

I sluine i S sum %.u.. .-

gsff7) 33eht.c,g3 ,g.3,,,3 l '

l .- -e4

'Af Telephone (412) 393-6000

.o. Box 4 Shippingport, PA 15077 0004 Februa ry 10. 1988 Beaver Valley Power Station-Unit 1 - Docket No. 50-334, License No. DPR-66 l Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report  !

U. S. Nuclear Regulatory Commission Director. Office of Management >

Information & Program Control '

Washington, D. C. 20555 Gentlemen :

r In accorda nce with Appendix A Technical Specifications, the Monthly Operating Report is submitted for Unit 1 and Unit 2 for the month of January, 1988.

t very truly yours ,

dab

. D. Si e be r '

j  :

Vice President Nuclear . 0perations Imd i Enclosures cc: NRC Regional Office King of Prussia , PA g o#G9k:#/ -

f- l 6

,/

I>f.W, CS 9

-- - - .