January 28, 1997 4
A U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Subject:
Docket Nos. 50-361 and 50-362 120 Day Response to Generic Letter 96-06: " Assurance of Equipment 4
Operability and Containment Integrity During Design-Basis Accident Conditions" i
San Onofre Nuclear Generating Station Units 2 and 3 Southern California Edison (Edison) requires additional time to finalize the 120-day response to Generic Letter (GL) 96-06 for San Onofre Nuclear Generating Station (SONGS) Units 2 and 3. Edison will submit the 120 day response by February 4, 1997.
If you have any questions or would like additional information, please let me know.
S' cerely, l
/
/
Rai try anager, Plant Licensing cc:
L. J. Callan, Regional Administrator, NPC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field.0ffice, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 i
y(07D o 9701310017 970128 PDR ADOCK 05000361 P