ML20147B311
| ML20147B311 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 01/12/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| References | |
| NUDOCS 8801150197 | |
| Download: ML20147B311 (2) | |
Text
g
' 4 <j JAN 121988.
In Reply Refer To:
Dockets:.50-498 50-499 Houston Lighting & Power Company ATTN:
J. H. Goldberg, Group Vice President, Nuclear P. O. Box 1700 Houston, Texas 77001 Gentlemen:
The_ Region IV staff has completed review of the emergency plan changes which you submitted to this office by letter dated December 2, 1987.
The revisions were reviewed by-our emergency preparedness staff and the proposed changes to the emergency plan are acceptable.
If there are any questions in regard to this letter, please contact Mr. N. M.
Terc (817) 860-8129 Original signes 3r L, J. Callan, Director Division of Rector Projects cc:
(see next page) 4 i
l M4e[r@;ap" B
C:NMEP
/0 0:0RP AI 87-487 c
WLFisher G
stable LJCallan
/ / 7 /88 l/6'/88 l/,i/88 L /, /88
[f
\\g pI 8801150197 880112 PDR ADOCK 05000498
/
F PDR
t 3s -
s Houston Power & Lighting. Company.,
cc:
Houston' Lighting & Power. Company ATTN:
M. Wisenberg, Manager Nuclear Licensing
~P. O. Box 1700 Houston, Texas 77001
-Houston Lighting & Power Company ATTN: Gerald E. Vaughn, Vice_ President Nuclear Operations-P.>0. Box 1700 Houston, Texas 77001-Chief, Radiological Preparedness Team FEMA. Region 6 Federal Center 800 North Loop 288 Denton, Texas 76201-3698
.l Central Power and Light Co.
R. L. Range /R. P. Verret P. O. Box 2121 Corpus Christi, TX 78403 City Public Service Board A. Von Rosenbert/M T. Hardt P. O. Box 1771 San Antonio, TX 78296 City of Austin M. B. Lee /J. E. Malaski P. O. Box 1008 Austin, TX 78767-8814 Texas Radiation Control Program Director bec to DMB (A045) bec distrib, by RIV:
TSS ORP RRI-0PS R. D. Martin, RA RRI-CONST.
Section Chief (DRP/0)
R. Taylor MIS System RIV File L. Shea, RM/ALF RITS Operator R. Bachmann, OGC l
H. Bundy P. Kadambi, NRR Project Manager l
4 Project Inspector, RPB R. Hall Inspector (s)
R. L. Bangart W. L. Fisher D. B. Matthews, NRR NMEPB DRS j
G. Bates i
t i
i
-