05000346/LER-1978-095-03, /03L-0:on 780905,station Batteries Weekly Surveillance Test Not Performed Until 780906.Caused by Personnel Error

From kanterella
(Redirected from ML20147B278)
Jump to navigation Jump to search
/03L-0:on 780905,station Batteries Weekly Surveillance Test Not Performed Until 780906.Caused by Personnel Error
ML20147B278
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/29/1978
From: Baltz J, Beeler T
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20147B268 List:
References
LER-78-095-03L, LER-78-95-3L, NP-33-78-112, NUDOCS 7810100063
Download: ML20147B278 (2)


LER-1978-095, /03L-0:on 780905,station Batteries Weekly Surveillance Test Not Performed Until 780906.Caused by Personnel Error
Event date:
Report date:
3461978095R03 - NRC Website

text

I U. S. NUCLE AR REGUL ATORY COMMISSION i

NR ORM 30E mm LICENSEE EVENT REPORT

  • ~

t l

CONTROL BLOCK: l l

l l

l l

l (PLE ASE PRINT OR TYPE ALL REQUIRED INFORMATION) i 6

l1 l1 l1 l1 l@l l

l@

1 g

l 0l Hl Dl Bl Sl 1l@] O ] O l -l 0 l 0 l N l p l p l_ l0 l 3 l@l4 25 2th LICENSE TYPE Ja 57 C AT 68 o 1 LsCENSE NwveER 7

8 9 LICENSEE CODE 14 15 lolil 3[nc[lL}@l0]5101-10 l3l416 @l019101517 18 j@l 019 l 2 l 9 l 7 l 8 CON'T 74 75 REPORT DATE 80 6d 63 EVENT DATE 60 61 DOCKET NUMBER EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h the Station Batteries Weekly Sur-l 7

8 10 la j l on 9/5/78 it was discovered by unit personnel that fication surveil-g 10131 l ve111ance Test had not been performed as required by Technical Speci completed until September 6, 1978 at j

lance requirement 4.8.2.3.2a.

Testing was not l o 141 1 There was no danger to'the health and safety of the public or to unit j

f o ( s i l 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br />.

If a need for the batteries existed, they would have been able to perform go gg ; gpersonnel.

j go;7g l properly.

(NP 78-112) l 80

[ 0 l8 l l SOoE

"#$E SUsCiOE COMPONENT CODE SLBC DE SU E

lol91 l El CJg g lC lg l Bl Al Tl Tl Rl Y g (Z g l Zlg C0 16 19 20 9

10 11 12 IJ REVISION OCCURAENCE REPORT 7

8 SEoVENTI AL CoOE TYPE N O.

@ nu=R Ro 17 18 I l-1 1019151 y

1013i O

l-l 10 l REPORT NO.

EVENT YE AR LE 21 22 2J 24

6 2T 23 23 30 31 32 at MAN FA TURER HOURS S B IT E FO 1 8.

SU PLI l x l@l z l@

Izl@

LzJO I el of of o f l Yl@

l NI@

lzl@

I z I zl zl zJ@

KEN 'A ON ON PL NT ME 33 34 35 36 3i da 41 42 43 44 47 CAUSE OESCRIPTION AND CORRECTIVE ACTIONS h A misunderstanding existed between l

I1 l O I l Personnel error is the cause of this occurrence!

scheduling personne1' and test personnel which resulted in the assump-j g g surveillance test 1976, unicn tion that tne test was completed. Tne test was completed on September b, g

,, g satisfied the surveillance requirement of g

verified the batteries were operable and gg

Technical Specification 4.8.2.3.2al.

80 7

8 9 DISCOVERY OESCRIPTION l

IS O RY ST U

% POWER OTH ER STATUS j

lBjglRoutineTestReview l_115 l l El@ l 0 l 7 l 5 lgl NA C TENT LOCATION OF RELEASE

' A 7tVITY l

RELE ASED OF RELE ASE AMOUNT OF ACTIVITY l-l NA l1l6I 3 @ lZ}@l NA PERSONNEL EXPOS ES I

JUV ER TYPE DESCR'PTION fiTil I I tI 0J @l zl @ l NA

~

PERSONNEL INJU IES l

DESCRIPTION

dJUM0ER1 Ol@l N^

80 f7TTI I l

7 8 9 il 12 LOSS OF OR O AYAGE TO F ACILITY l

TV E DESgt PT60N

...{rlT1 LJ@l ~

PUBLt TY,

[

=

NFC USE ONLY ISSUE D

DESCRIPTION

l llllllllll l ! l },

80 5 l

N^

68 69

. 2 O "D MD 419-259-5000, Ext. 253/215, 7

8 9 10

_ uny,

'l TOLEDO EDISON COMPANY DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION SUPPLEMENTAL INFORMATION FOR LER NP-33-78-112 DATE OF EVENT:

September 5, 1978 FACILITY: Davis-Besse Unit 1 ST 5084.01, " Station Batteries Weekly Surveillance 1DENTIFICATION OF OCCURRENCE:

Test" was not performed in the required seven day period u

The unit was in Mode 1, with Power (MWT) = 2098, Conditions Prior to Occurrence:

and Load (MWE) = 716.

At 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> on September 5, 1978, it was discovered Description of Occurrence:

by unit personnel that ST 5084.01, " Station Batteries Weekly Surveillance Test" had not been performed as required by Technical Specification surveillance requirement The Technical Specification requires that each 125 volt battery be 4.8.2.3.2a.-

demonstrated operable once every seven days. The maximum allowable extension period was 25% of the seven day frequency which required testing to be completed by Septem-ber 2, 1978. Testing was not completed until September 6,1978 at 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br />.

Designation of Apparent Cause of Occurrence: Personnel error is the cause of'this scheduling per-A misunderstanding existed between surveillance test sonnel and test personnel which resulted in the assu=ption that the test was ccm-occurrence.

pleted.

There was no danger to the health and safety of the public Analysis of Occurrence:

or to unit personnel.

If a need _f or the batteries existed, they would have been able to perform properly.

Corrective Action

Maintenance personnel were notified of the discrepancy and immediately began performing the test. The test was completed on September 6, 1978, at 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> which verified the batteries were operable and satisifed the surveillance requirement of Technical Specification 4.8.2.3.2al.

Previous f ailures to complete the surveillance requirements were I

Failure Data:

reported in Licensee Event Reports NP-33-78-112, NP-33-78-103, NP-33-78-108, but these did not include NP-33-77-84 NP-33-77-93, NP-33-78-98 and NP-33-77-101, the station battery surveillance requirements.

\\

LER #78-095