Summary of 860307 Meeting W/Util Re Proposed Responses to NRC 851115 Questions on Emergency Mgt Plan
ML20142A043
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/14/1986
From: Kadambi N
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8603190259
Download: ML20142A043 (7)


Text

  1. [*,, UNITED STATES

, [ g NUCLEAR REGULATORY COMMISSION

, 5 -l WASHINGTON, D. C. 20555

\ .*** /

gMW Docket Nos: 50-498 and 50-499 APPLICANT: Houston lightino and Power Company FACILITY: South Texas Pro,iect

SUBJECT:

Summary of Meeting Feld on March 7, 1986 oN the Emergency Management Plan.

The applicant requested this meeting to discuss with the staff the proposed responses to questions and comments transmitted to the applicant on November 15, 1985. The attendees are shown in Enclosure 1.

DISCUSSION As preparation for the meeting, a schedule had been discussed based on the applicant's letter to the staff of February 4,1986. Agreement was reached that the following schedule would apoly for the review and completion of the

. Emergency Management Plan, leading up to the exercise in February,1987, i

' . NRC provides verbal comments on draft revisions to the initial STP Emergency Plan (EP) 3/07/86

. Pl&P provides revised EP and answers to Q-l's 4/07/86

. NRC provides additional comments and questions on ,

revised EP 5/23/86

. Pl&P provides STP Emergency Plan Implementing l Procedures 6/06/86 1

. Pl&P provides final revision of EP 6/27/86

. Plan begins Pre-Exercise Drills 7/86

. NRC conducts Emergency Preparedness Appraisal based on the readiness of STP 11/86

. STP Pre-licensing Energency Exercise 2/87 This meeting accomplished the objectives of the first milestone in the schedule usina draft responses provided by the applicant for each item in the November 15, 1985 staff transmittal. The entire package of draft responses has not been enclosed herewith due to the large volume involved. The second milestone in the schedule calls for a formal submittal from the applicant which will incorporate the results of the discussion as follows:

1 I

8603190259 860314 PDR ADOCK 05000498 F PDR

t MAR 14.W (1) The Emergency Plan will be a self-standing document, including within it summaries of the method of interaction between the state and local authorities, and plant personnel, in case of an emergency. The staff provide'd copies of acceptable examples in this area.

(2) All references in the plan to " hot line" will be changed to "EAS".

(3) In Section 2.7.3.1, " prompt"' notificatico will be changed to "as-soon-as-possible, but within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />."

(4) Agreements with Bechtel and Westinghouse will be included in the Plan.

(5) Where specific procedures are called for in the Plan, a brief summary and procedure number will be given.

(6) Ranges and sensitivities for instrumentation will be supplied in the Plan, without specifying makes and model numbers. i (7) Various editorial corrections were discussed.

The staff proposed, and the applicant agreed to support, a site etsit in the April-May, 1986 period.

- 2 " --

N. P. Kadambi, Project Manager PWR Project Directorate #5 Division of PWR I.icensing-A

. NIJA fg}

h 14 m

_2 (1) The Emergency Plan will be a self-standing document, including within it summaries of the method of interaction between the state and local authorities, and plant personnel, in case of an emergency. The staff provided copies of acceptable examples in this area.

(2) All references in the plan to " hot line" will be changed to "E&S".

(3) In Section 2.7.3.1, " prompt" notification will be changed to "as-soon-as-possible, but within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />."

(4) Agreements with Bechtel and Westinghouse will be included in the Plan. -

(5) Where specific procedures are called for in the Plan, a brief summary and procedure number will be given.

(6) Ranges and sensitivities for instrumentation will be supplied in the Plan, without specifying makes and model numbers.

(7) Various editorial corrections were discussed.

The staff. proposed, and the applicant agreed to support, a site visit in the April-May, 1986 period.

V N.P.kadambi,ProjectManager PWR Project Directorate #5 Division of PWR licensing-A I

0FC :PD#5. toy,  :  :  :  :  :  : j

_____: EL :____________:____________:____________.____________.____________.___________

NAME :NPKadambi  : -

DATE : JL/lk/86els : -

0FFICIAL RECORD COPY

+ -

Meeting Summary Distribution

., c Docket or Central File NRC Participants

. NRC PDR local PDR N. P. Kadambi PD#5 Reading File Edward Williams J. Partlow (Emergency Preparedness only)

. V. Noonan Project Manager P.Kadambi OEI.D E. Jordan B. Grimes ACRS (10)

M. Rushbrook

)

cc: Licensee and Plant Service list M

E l

i .

Mr. J. H. Goldberg Houston lighting and Power Company South Texas Project CC*

4 Brian Berwick, Esq. Resident Inspector / South Texas Assistant Attorney General Project

. Environmental Protection Division c/o U. S. Nuclear Regulatory Commission l P.O. Box 12548 P. O. Box 910 Capitol Station Bay City, Texas 77414 Austin, Texas 78711 Mr. Jonathan Davis Mr. J. T. Westermeir Assistant City Attorney Manager, South Texas Project City of Austin Houston lighting and Power Company P. O. Box 1088 P. O. Box 1700 Austin, Texas 78767 Houston, Texas 77001 Ms. Pat Coy 4

Mr. H. L. Peterson Citizens Concerned About Nuclear Mr. G. Porkorny Power City of Austin 5106 Casa Oro P. O. Box 1088 San Antonio, Texas 78233 Austin, Texas 78767 Mr. J. B. Poston Mr. Mark R. Wisenberg Mr. A. Von Rosenberg Manager, Nuclear licensing j City Public Service Board Houston, lighting and Power Company P. O. Box 1771 P. O. Box 1700 San Antonio, Texas 78296 Houston, Texas 77001 Jack R. Newman, Esq. Mr. Charles Halligan Newman & Holtzincer, P. C. Mr. Burton L. I.ex 1615 L Street, NW Bechtel Corporation Washington, D. C. 20036 P. O. Box 2166 Houston, Texas 77001 Melbert Schwartz, Jr., Esq.

1 Baker & Botts Mr. E. R. Brooks '

l One Shell Plaza Mr. R. L. Range l

~

Houston, Texas 77002 Central Power and light Company P. O. Box 2122 Mrs. Peggy Buchorn Corpus Christi, Texas 78403 Executive Director Citizens for Equitable Utilities, Inc.

Route 1, Box 1684 Brazoria, Texas 77422 i 1 l

l

.' ~

. Houson I.ighting & Power Company South Texas Project l

  • i i

CC:

1 Regional Administrator, Region IV U. S. Nuclear Regulatory Commission Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Mr. I.anny Sinkin Covasil for Intervenor Citizens Concerned about Nuclear Power, Inc.

Christic Institute -

1324 North Capitol Street

Washington, D. C. 20002 Mr. S. Head, Respresentative

! Pouston lighting and Power Company Suite 1309 7910 Woodmont Avenue Bethesda, Maryland 20814 4

i 1

i i

_ , , , , , . - . - . _ . . - _m.. . . - , _ , - . . _ , , , . ~ . . . . _ _ _ _ . _ , . , , , , - > . . . _ , . . . , . . . _ , __,_.,_m_ ..

l 3

i . SOUTH TEXAS PROJECT EMERGENCY Pl.ANNING MEEETING MARCH 7, 1986 ATTENDEE AFFII.IATION I

N. P. Kadambi NRC/PD#5 Edward Williams NRC/I&E/EPB W. P. Kinsey Pl&P - Plant Manager R. R. Goodwin PL&P Emergency & Safety Supv.

M.A. McBurnett Hl.&P Nuclear I.icensing Terry G. Roberson Fl.&P Engineering i