ML20141N974

From kanterella
Jump to navigation Jump to search

Authorizes Utilization of mini-CECOR/BASSS Sys,Per 851129 Amend 92 to License DPR-40,which Changed Tech Specs to Support Operation at Full Rated Power During Cycle 10.Open Item Considered Closed
ML20141N974
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/10/1986
From: Thadani A
Office of Nuclear Reactor Regulation
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
References
TAC-59869, NUDOCS 8603180374
Download: ML20141N974 (1)


Text

. .

March 10, 1986 Docket No. 50-285 DISTRIBUTION:

MTi~*

NRC PDR Local PDR Mr. R. L. Andrews PD#8, Rdg Division Manager, Nuclear Production FJMiraglia Omaha Public Power District EJordan 1623 Harney Street 8 Grimes Omaha, Nebraska 68102 JPartlow PMKreutzer

Dear Mr. Andrews:

ACRS By letter dated November 29, 1985, the Commission issued Amendment No. 92 to Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1.

The Amendment changed the technical specifications to support the operation of the unit at full rated power during Cycle 10. As you know, there was one open as a result of our review. This involved the validation of the Mini-CECOR/BASSS system. '

By letter dated February 18, 1986, you stated that the Mini-CECOR/ BASS $ system has been validated and that the system can now be declared operational. We have reviewed your letter and believt. that the results of the check-case comparison between CECOR and mini-CECOR provide proof that mini-CECOR has been properly installed and validated. Therefore, we agree with your assessment and authorize you to utilize the Mini-CECOR/BASSS system. We consider this open item now closed.

Sincerely, M

Achok C. Thadani, Director Division of PWR Licensing-8 cc: See next page 8603180774 860310 DR %dCK O yS PD#8 PD#8 # PD#8 PMKpetuzer ETaurigny:dd s ACTipdani 3/o/86 3/ / /86 3//b /86 3/ LV86