ML20141N142
| ML20141N142 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 02/28/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| Shared Package | |
| ML20141N143 | List: |
| References | |
| NUDOCS 8603040408 | |
| Download: ML20141N142 (3) | |
See also: IR 05000424/1986008
Text
-
.
.
.
v-
s
1.
re//od
.
FEB 28 M
Georgia Power Company
. ATTN: Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: REPORT NO. 50-424/86-08
On February 10-14, 1986, NRC inspected activities authorized by NRC Construction
Permit No. CPPR-108 for your Vogtle facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
,
Areas examined during the inspection are identified in the report. Within these-
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concef>ning this letter, please contact us.
Sincerely,
/d
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-424/86-08
cc w/ encl:
vR..E. Conway, Senior Vice President &
Project Director
D. O. Foster, Vice President, Project
Support
<P. D. Rice, Vice President, Project
Engineering
rR. H. Pinson, Vice President, Project
Construction
d T. Beckham, Vice President &
General Manager - Operations
(cc w/ encl cont'd - see page 2)
hof0lDOCM05000424
O40g esoggg
G
-
oi .
r -
-n~
'
~
~^
^
$
.
.
Georgia Pow 3r Company
2
FE8 2 61996
,
(cccont'd)
LR. A. Thomas, Vice President,
Licensing
t4. W. Hayes, -Vogtle Quality
Assurance Manager
S. C. Ramsey, Manager -
Readiness Review
g B. Bockhold, General Manager,
Nuclear Operations
E T. Gucwa, Chief
. Nuclear Engineer
W. H. Googe, Project
Construction Manager
E/ D. Groover, Quality
Assurance Site Manager -
Construction
W.1A. Bailey, Project Licensing
Manager
fr( F. Trowbridge, Esq., Shaw,
Pittman, Potts and Trowbridge
LB~.~ W. Churchill, Esq. , Shaw,
Pittman, Potts and Trowbridge
C L. Blake, Jr., Esq., Shaw,
Pittman, Potts and Trowbridge
V E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
OV G. Ledbetter, Commissioner,
Department of Human Resources
S-H. Badger,OfficeofPlanning
and Budget
@. Kirkland, III, Counsel,
Office of the Consumer's Utility
, Council
PC. C. Teper, Georgians Against
Nuclear Energy
'
.T.e Johnson, Executive Director,
" Educational Campaign for a
Prosperous Georgia
y.'B. Margulies, Esq., Chaiman,
Atomic Safety and Licensing Baard
. Panel
br. O. H. Paris, Administrative-Judge
-Atomic Safety and Licensing Board
. Panel
vG. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
[ Government Accountability Project
P. Garde, Citizens Clinic, Director-
(bec w/enci - see page 3)
-
_
__
_
_
_ _
,
- ,
.
.
. Georgia Power Company
3
FED E 6 E -
t
b'cc w/ encl:
LF. Reis, ELD
@ M. Hill, IE
(-
J . Miller,.NRR
W. Brach, EDO
M. Sinkule, RII
W. Rankin,.RII
"
) Document Control DeskRC Resident. Inspector
.
'
~ State of Georgia
i
.
J
r
- f -
i
i
.,
!-
!
!
i
s
!
R
I
RII
RII
.
i
Schnebli:jw
Nicholson
Fa
AHerdt
I h.
M/;tt/86
2/24/86
2/g/86
g/86
,
L