Requests Encl Listed Approved Ref Matl & Administration Requirements for Reactor & Senior Reactor Operator Licensing Exams Scheduled for Wk of 860602 by 860401
ML20141N140
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/26/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Koester G
KANSAS GAS & ELECTRIC CO.
References
NUDOCS 8603040403
Download: ML20141N140 (4)


Text

A Docket: 50-482 fEB 26 RU Kansas Gas and Electric Company ATTN: Glenn L. Koester Vice President, Nuclear P.O. Box 208 Wichita, Kansas 67201

SUBJECT:

REACTOR OPERATOR AND SENIOR OPERATOR LICENSING EXAMINATIONS Gentlemen:

In a telephone conversation between Mr. Arthur Mah, Manager of Nuclear Operator Training and Mr. J. E. Whittemore, NRC Examiner, arrangements were made for the administration of operator licensing examinations to Kansas Gas and Electric personnel.

Written and simulator / operating examinations are scheduled for the week of June 2, 1986 at the Wolf Creek training facility. The written examinations will be administered on June 3,1986 at the Wolf Creek training facility. The simulator / operating examinations will follow.

In order for us to meet the above schedule, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1,

" Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations," by April 1, 1986. Any delay in receiving this material may result in a delay in administering the examinations. Our examinations are scheduled far in advance with considerable planning to utilize our present examiner manpower and to meet the examination dates requested by various facilities. Missing the April 1, 1986 deadline, even by a few days, likely will result in a long delay because it may not be possible to reschedule examinations at other facilities. Mr. Mah has been informed of our reference material requirements and the address where the material must be sent.

The facility management is responsible for providing adequate space and facilities in order to properly conduct the written examinations. Enclosure 2,

" Administration of Reactor / Senior Reactor Operator Licensing Written Examinations," describes our requirements for conducting these examinations.

Mr. Mah has also been informed of these requirements.

This request for information was approved by the Office of Management and Budget under Clearance Number 3050-0101, which expires June 30, 1986. Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 320B, New Executive Office Building, Washington, D. C. 20503.

RIV:RSB/0Lh OL RS RPB g JEWhittmore:gb RA o ey DRHunter JECagl grdo a D 9/86 t/ 6 t/tt/86 3M 86 8603040403 G60226 PDR ADOCK 05000482

/h b

V PDR I\

Kansas Gas and Electric Thank you for your consideration in this matter. If you have any questions regarding examination procedures and requirements, please contact Mr. J. E.

Whittemore, Examiner, at (817)860-8294, or Mr. R. A. Cooley, Chief, Operator Licensing Section, at (817)860 8147.

Sincerely, originai scned BX, J. E. Gagliardo, Chief Reactor Projects Branch

Enclosures:

As stated cc:

Kansas Gas and Electric Company ATTN: Otto Maynard, Manager of Licensing P. O. Box 309 (Sharp Road)

Burlington, Kansas 66839 Forrest Rhodes, Plant Superintendent Wolf Creek Generating Station P. O. Box 309 Burlington, Kansas 66839 A. S. Mah, Mgr. of Nuclear Training Wolf Creek Generating Station P. O. Box 309 Burlington, Kansas 66839 Kansas Radiation Control Program Director bcc to DMB (IE42) bcc distrib. by RIV:

RPB Resident Inspector R. D. Martin, RA Section Chief (RPB/B) DRSP RIV File RSB D. Weiss, LFMB (AR-2015) J. Whittemore

ATTACHMENT 1 REFERENCE MATERIAL REQUIREMENTS FOR REACTOR / SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS

1. Procedure Index (alphabetical by subject).
2. All administrative procedures (as applicable to reactor operation or safety).
3. All integrated plant procedures (normal or general operating procedures).
4. Emergency procedures (emergency instructions, abnormal or special procedures).

4

5. Standing orders (important orders that are safety related and may supersede the regular procedures).
6. Fuel handling and core-loading procedures, (initial core-loading i procedure,whenappropriate).
7. Annunciator procedures (alarm procedures, including setpoints).

l

8. Radiation protection manual (radiation protection manual or procedures).
9. Emergency plan implementing procedures.

. 10. Technical Specifications.

4

11. Lesson plans (training manuals, plant orientation manual, system descriptions, reactor theory, thermodynamics, etc.).
12. System operating procedures.
13. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams.

! 14. Technical data book, and/or plant curve information as used by operators.

15. Any other material the examiner feels is necessary to adequately prepare a written examination, such as reactor traces of significant plant evolutions.

l

16. Questions and answers that licensee has prepared (voluntary by licensee). l

)

17. Malfunction and initial condition material for simulator (if applicable). j The above reference material should be approved, final issues, and so marked.

If a plant has not finalized some of the material, the chief examiner is responsible for ensuring that the most complete, up-to-date material is available and that agreement has been reached with the licensee for limiting i

, changes before the administration of the examination. All procedures and  !

reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents so that they can be used efficiently.

ATTACHMENT 2 REQUIREMENTS FOR ADMINISTRATI0h 0F WRITTEN EXAMINATIONS Operator Licensing Branch requirements are:

1. A single room shall be provided for completing the written examination.  !

The location of this room and supporting rest room facilities shall be such as to prevent contact with all other facility and/or contractor personnel during the duration of the written examination. If necessary, the facility should make arrangements for use of a suitable room at a local school, motel, or other building. Obtaining this room is the responsibility of the licensee.

2. Minimum spacing is required to ensure examination integrity as determined by the chief examiner. Minimum spacing should be one candidate per table, with a 3 foot space between tables. No wall charts, models, and/or other training materials shall be present in the examination room.
3. Suitable arrangements shall be made by the facility if the candidates are to have lunch, coffee, or other refreshments. These arrangements shall comply with Item 1 above. These arrangements shall be reviewed by the examiner and/or proctor.
4. The licensee shall provide pads of 8-1/2- by 11- in lined paper in unopened packages for each candidate's usc in completing the examination.

The examiner shall distribute these pads to the candidates. All reference material needed to complete the examination shall be furnished by the examiner. Candidates can bring pens, pencils, calculators, or slide rules into the examination room, and no other equipment or reference material shall be allowed.

5. Only black ink or dark pencils should be used for writing answers to questions.