ML20141N109
| ML20141N109 | |
| Person / Time | |
|---|---|
| Site: | University of Michigan |
| Issue date: | 02/24/1986 |
| From: | Berkow H Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20141N106 | List: |
| References | |
| R-028-A-031, R-28-A-31, NUDOCS 8603030588 | |
| Download: ML20141N109 (5) | |
Text
.
'o,,
UNITED STATES 4
8 NUCLEAR REGULATORY COMMISSION g
4 D
E WASHINGTON, D. C. 20555
\\...../
UNIVERSITY OF MICHIGAN DOCKET NO.50-002 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 31 License No. R-28 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment to Facility Operating License No. R-28, filed by the University of Michigan (the licensee), dated December 2, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's regulations as set forth in 10 CFR Chapter I:
B.
The facility will operate in conformity with the amended license, the provisions of the Act, and the rules and regulations of the Comission; C.
There is re.asonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon-defense and security or to the health and safety of the public; E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied; and F.
Publication of notice of this amendment is not required since it does not involve a significant hazards consideration nor amendment of a license of the type described in 10 CFR Section 2.106(a)(2).,
e6030305s0 e50224 DR ALOCK O 2
. 2.
Accordingly, the license is amended by changes to the technical specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of License No. R-28 is hereby amended to read as follows:
(2) Technical Specifications The technical specifications contained in Appendix A, as revised through Amendment No. 31, are hereby incorporated in the license.
The licensee shall operate the-facility in accordance with the technical specifications.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/1 isbbs Herbert N. Berkow, Director Standardization & Special Projects Directorate Division of PWR Licensing-B
Attachment:
Appendix A Technical Specifications Changes
~~
Date of Issuance: February 24, 1986 1
i e
~
.,4
ATTACHMENT TO LICENSE AMENDMENT NO. 31 FACILITY OPERATING LICENSE NO. R-28 DOCKET N0.50-002 Revised Appendix A technical specifications are as follows:
Remove Pages Add Pages 33 (Amendment No. 29) 33 (Amendment No. 31) 35 (Amendment No. 29) 35 (Amendment No. 31)
Changes on the revised pages are identified by marginal lines.
t 1
i
.i i
1 4
,v
-,,m..
,,--.3
-m-m,4-4
TECHNICAL SPECIFICATIONS Ford Nuclear Reactor Docket 50-2, License R-28 November, 1984 6.0 ADMINISTRATIVE CONTROLS 6.1 Organization (1) The organizational structure of the University of Michigan-relating to the Ford Nuclear Reactor (FNR) shall be as shown in Figure 6.1.
(2) The FNR Reactor Manager shall be responsible for the safe operation of the FNR. He shall be responsible for assuring that all operations are conducted in a safe manner and within the limits prescribed by the facility license, including the technical specifications and operating procedures.
During periods of his absence, his responsibilities are delegated to the Assistant Reactor Manager.
(3)
In all matters pertaining to the operation of the plant and these technical specifications, the FNR Reactor Manager shall report to and be directly responsible to the Director, Michigan Memorial-Phoenix Project.
(4) Qualifications, FNR Reactor Manager and Assistant Reactor Manager: Minimum qualifications for the FNR Reactor Manager and Assistant Reactor Manager shall be a bachelor's degree and at least four years of reactor operating experience in increasingly responsible positions.
Years spent in graduate study may be substituted for operating experience on a one for one basis up to a maximum of two years. Within six months after being assigned this position, the Reactor Manager and Assistant Reactor Manager shall apply for an NRC senior operator license if he does not already hold one.
(5) A health physicist who is organizationally independent of the FNR operations group shall be responsible for radiological safety at the facility.
(6) A licensed operator or licensed senior operator pursuant to 10CFR55 shall be present in the control room whenever the reactor is in operation as defined in these specifica-tions. The minimum operating crew will be composed of two irdividuals, at least one of which will be so licensed.
(7) A licensed senior operator shall be present or readily available on call at any time the reactor is in operation.
(8) The identity of and method for rapidly contacting the licensed senior operator on duty shall be known to the reactor operator at any time that the reactor is in operation.
Amendment No. 31 Page 33
w TECHNICAL SPECIFICATIONS Ford Nuclear Reactor Docket 50-2, License R-28 I
November. 1984 Figure 6.1 Drganization Chart for the Ford Nuclear Reactor Regents University of Michigan 4
President 1
Vice President Research Director Director Michigan Memorial-Phoenix Projeci Radiation Control Service 5
I i
~
- L__,
Safety Review i
CcEnittee 1
- l Reactor Manager Health Physicist Assistant Reactor Manager
-. ~
j Licensed Operators i
i Safety,and Licensing Function l
- 1 Amendment No. 31 Dage 35
r-e 7---m-
---w---w-,wwy pe-->-w-w--
y
-7.we,,
..,.yw-+e,-->m--,
.-.ww----.g.----+w, g
-w.y--%,..,,-wv.,
2-et--aw=a.+--m w.ww-yam.W+e-aev-e