Text
.
FEB 0 71986 Docket Nos.:
50-440/441 DISTRUBUTION gestgesney JStefano NRC"SDR~
ACRS (10) local PDR PRC System Mr. Murray R. Edelman PD#4 Reading Vice President - Nuclear Group MRushbrook The Cleveland Electric Illuminating Company WButler P.O. Box 5000 OELD Cleveland, Ohio 44101 EJordan BGrimes
Dear Mr. Edelman:
JPartlow
SUBJECT:
CHANGES TO FSAR CHAPTER 14 INCORPORATED BY FSAR AMENDMENTS 21 THUR 24 - PERRY NUCLEAR POWER PLANT (UNITS 1 & 2)
Enclosed for your immediate attention and action are NRC staff comments 4
pertaining to the subject FSAR changes.
Since the enclosed comments involve plant startup test abstracts documented in FSAR Chapter 14, it is essential that any required test abstract changes be made prior to Perry Unit 1 initial criticality.
Your letter. attesting to the accuracy of the FSAR for Perry Unit 1 licensing may be used to address your commitment to make the required FSAR changes; Sowever, if time permits, it would be preferable that an FSAR amendment, accumenting changes relative to the enclosed comments, be docketed prior to Issuance of the low power operating license for Perry Unit 1.
To minimize any impact on licensing, an advance copy of the enclosed comments 3
was provided to your staff.
Should there be any questions or need to consult with the NRC staff, please contact the Perry Project Manager, John J. Stefano.
Sincerely, Walter R. Butler, Director 1
BWR Project Directorate No. 4 Division of BWR Licensing
Enclosure:
As stated cc:
See next page bec w/ enclosure:
G. Lainas R. Becker C. Woodhead, OELD
)JStfano:dh PD#4/PM PD#4/D r
WRButler 0$/ /86 Q2lG86 8603030522 B60207 PDR ADOCK 05000440 A
-yn-
,f.--,+
-w-
~
-r.
.n.:-
y
~
al
~
~ F B 0 7 1986 Docket Nos.:
50-440/441 DISTRUBUTION Docket File JStefano NRC PDR ACRS (10) local PDR PRC System Mr. Murray R. Edelman PD#4 Reading Vice President - Nuclear Group MRushbrook The Cleveland Electric Illuminating Company WButler P.O. Box 5000 OELD Cleveland, Ohio 44101 EJordan BGrimes
Dear Mr. Edelman:
JPartlow
SUBJECT:
CHANGES TO FSAR CHAPTER 14 INCORPORATED BY FSAR AMENDMENTS 21 THUR 24 - PERRY NUCLEAR POWER PLANT (UNITS 1 & 2)
Enclosed for your immediate attention and action are NRC staff comments pertaining to the subject FSAR changes.
Since the enclosed comments involve plant startup test abstracts documented in FSAR Chapter 14, it is essential that any required test abstract changes be made prior to Perry Unit 1 initial criticality.
Your letter attesting to the accuracy of the FSAR for Perry Unit 1 licensing may be used to address your commitment to make the required FSAR changes; however, if time permits, it would be preferable that an FSAR amendment, documenting changes relative to the enclosed comments, be docketed prior to issuance of the low power operating license for Perry Unit 1.
To minimize any i'apact on licensing, an advance copy of the enclosed comments was provided to your staff.
Should 16here be any questions or need to consult with the NRC staff, please contact the Perry Project Manager, John J. Stefano.
Sincerely, Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing
Enclosure:
As stated cc:
See next page bec w/ enclosure:
G. Lainas R. Becker C. Woodhead, OELD k
)JStfano:dh PD#4/PM PD#4/D t
WRButler 08/ /86 QL' y86
p uro
' o UNITED STATES 8
k NUCLEAR REGULATORY COMMISSION h
WASHINGTON, D. C.'20555 p#
FE8.0 7 1986 Docket Nos.:
50-440/441 4
Mr. Murray R. Edelman Vice President - Nuclear Group The Cleveland Electric Illuminating Company P.O. Box 5000 Cleveland, Ohio 44101 t
Dear Mr. Edelman:
SUBJECT:
CHANGES TO FSAR CHAPTER 14 INCORPORATED BY FSAR AMENDMENTS 21 THUR 24 - PERRY NUCLEAR POWER PLANT (UNITS 1 & 2) i Enclosed for your immediate attention and action are NRC staff comments pertaining to the subject FSAR changes.
Since the enclosed comments involve i
plant startup test abstracts documented in FSAR Chapter 14, it is essential that any required test abstract changes be made prior to Perry Unit 1 initial criticality.
i Your letter attesting to the accuracy of the FSAR for Perry Unit 1 licensing may be used to address your commitment to make the required FSAR changes; however., if time permits, it would be preferable that an FSAR amendment, documenting changes relative to the enclosed comments, be docketed prior to issuance of the low power operating license for Perry Unit 1.
To niinimize any impact on licensing, an advance copy of the encloted corments was provided to your staff.
Should there be any questions or need to consult with the NRC staff, please contact the Perry Project Manager, John J. Stefano.
Sincerely, Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing
Enclosure:
As stated cc:
See next page J
J l
-, _. - - ~.., _ _ _. - -.. _.
~
-l Mr. Murray R. Edelman Perry Nuclear Power Plant The Cleveland Electric Units 1 and 2 Illuminating Company CC*
Jay Silberg, Esq.
Ilr. Larry 0. Beck Shaw, Pittman, & Trowbridge The Cleveland Electric 1800 M Street, N. W.
Illuminating Company Washington, D. C.
20006 P. O. Box 97 E-210 Ferry, Ohio 44081 Donald H. Hauser, Esq.
The Cleveland Electric Illuminating Company P. O. Box 5000 Cleveland, Ohio 44101 Resident Inspector's Office U. S. Nuclear Regulatory Commission Parmly at Center Road Perry, Ohio 44081 Regional Administrator, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Donald T. Ezzone, Esq.
Assistant Prosecuting Attorney 105 Main Street Lake County Administration Center Painesville, Ohio 44077 Ms. Sue Hiatt GCRE Interim Representative 8275 Munson Mentor, Ohio 44060 Terry J. Lodge, Esq.
618 N. Michigan Street Suite 105 Toledo, Ohio 43624 John G. Cardinal, Esq.
Prosecuting Attorney Ashtabula County Courthouse Jefferson, Ohio 44047 1
_. ~.,. _ -,
1 STAFF POSITIONS AND REQUEST FOR ADDITIONAL INFORMATION PERRY NUCLEAR POWER STATION, UNIT 1 AND 2 144 The following startup test abstracts should specify the criteria to be used by Gilbert Associates, Inc. or the vendor to determine 'ppropriate a
acceptance criteria or reference appropciate design specifications.
(1)
FSAR Subsection 14.2.12.2.37 (Test Number 100 - Integrated HVAC)
(2)
FSAR Subsection 14.2.12.2.39 (Test Number 114 - Emergency Closed Cooling System)
(3)
FSAR Subsection 14.2.12.2.42 (Test Number 117 - Emergency Service Water) 14B The responses to Jun following questions should be revised as the referenced abstracts are no longer appropriate.
(1) 640.17 (2) 640.18 (3) 640.19 (4) 640.38 (5) 640.39 (6) 640.40 (7) 640.41 (8) 648.42 (9) 640.44 (10) 640.45 (11) 640.50
'14C The response to Question 643.58 should reference Question 643.65 as the questions are identical.
14D Clarification or technical justification should be provided for the -2 percent deviation from rated power allowance in FSAR Subsection 14.2.12.2.10 (Test Number 12-APRM calibration), Acceptance Criteria for Level 2.
14E The response to Question 640.17 and FSAR Table 1.8-1 should be revised to indicate and to provide technical justification for the specific items of Regulatory Guide 1.69.1 for which you do not intend to comply.
Additionally, FSAR Subsection 14.2.12.2.47 (Test Number 122-BOP Piping Expansion and Vibration) should be revise.1 to reinstate the specific acceptance criteria and the systems to which.they apply.