| Site: | Saint Lucie |
| Issue date: | 01/06/1986 |
| From: | Sanders G SANDIA NATIONAL LABORATORIES |
| To: | Sells D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20141J487 | List: |
| References | |
| REF-GTECI-A-45, REF-GTECI-DC NUDOCS 8603030113 | |
| Download: ML20141M951 (2) | |
Text
Sandia Nationa', Laboratories Amuaucune. Miv Meoco 8M85
- January 6, 1986 Donald E. Sells
~
Division of Licensing Nuclear Regulatory Commission Washington, DC 20555
Dear Don,
The Task Action Plan A-45 analyses have reached a point at which a second visit is planned to the St. Lucie Nuclear Power Plant for January 23-24.
It is anticipated that one Sandian and three engineers from United i
Engineers and Constructors will be on the plan visit.
The purpose of the trip is to answer some questions regarding crossties to the Unit 2 systems a=
and operator recovery actions, and to explore some preliminary i
analysis vulnerabilities that the early work has identified.
Specifically, the questions that we have at the moment ace:
e What do plant personnel do if CCW valves HCV 14-8A oc HCV 14-8B fail to close?
Can they manually clost then?
Ate there proceduces?
Is a redundant valve practical for backfit?
~
e Row does Unit 1 ceceive power from Unit 2 diesel generators?
How much time does it take?
WRAt buses are fed?
e Are AFW motot driven pump feedwatet Valves 09-9 and 09-10 normally closed?
Can they be hand opened?
Could they be left normally open?
Are AFW tutbine driven pump steam supply valves MV-08-13, f
o MV-08-14, and MV-08-03 all powered by DC 125 V bus 1AB?
Could valve MV-08-03 be left open?
Could MV-08-14 be powered by DC 125 V bus 187 e
What would it take to perform a bleed and feed operation?
Ace Unit 2 proceduces applicable to Unit 17 can interlocks be overriden to allow emergency AC power to e
400V AC bus 1A-2 from bus 1B.2 via 480 V bus 1AB?
Are the auxiliary feedwatec pumps tested on a staggered test e
basis?
i 0603030113 860210 ADOCK050fg PDR P
ronald E. Sells January 6, 1985 How are the 4.16 ~KV switchgear cabinets bolted to, prevent o
seismic damage?
What is the design criteria for the sheet steel boxes around the service watec and component cooling water pumps?
What are the dimensions of the diesel oil storage tank and e
where are the diesel fuel transfer pumpa located?
i La the Unit 2 FSAR hydrology section updated from the Unit 1 t
version?
By the time we visit the plant, a few additional questions may be added wir.h regard to Appendix R upgrades.
I hope that these questions give you a better idea of the type of visit that we are planning and I would be happy to answer any further 1
quer.tions that you might have.
Sincerely, f w ) M e<
c Gary Sanders Reactor Systems Studies Division 6414 i
~