Forwards List of OL Application Review Costs for 841223-850622,per Revised 10CFR170 Re License & Insp Fees. Amount Due Discussed
ML20141M905
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/20/1986
From: Holloway C
NRC OFFICE OF ADMINISTRATION (ADM)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 8603030038
Download: ML20141M905 (2)


Text

l DISTRIBUTION:

PDR

^

LPDR l

LFMS Actual Manpower ft i

RMDiggs CJHolloway RaStDecket File FEB 2 01985 DWeiss~

LFMS Reactor File LSolander, PRAB MKaltman, PRAB Docket No. 50-423 CHarwood, NRR EDoolittle, NRR l

MRushbrook, NRR l

Northeast Huclear Energy Company l

ATTH: Mr. John F. Opeka Senior Vice President Nuclear Engineering and Operations P.O. Box 270 Hartford, CT 06141-0270 Gentlemen:

l I

As you are aware,10 CFR 170 of the Comission's regulations for license and inspection fees was revised effective June 20, 1984. Section170.12(b) of the revised rule provides that for applications for pennits, licenses, facility reference design approvals, and special projects which have l

been on file with the Commission for review for six months or longer.

billings would be made at six-month intervals or when the review is i

completed, whichever is earlier.

Consistent with the requirenents of 10 CFR 170.12(b), we have completed l

the cost analysis for the Millstone 3 OL application review for the period December 23, 1984 through June 22, 1985. The cost through that period is 51,130,383. The enclosure is a breakdown of the review costs by program office. When the costs of $1,130,3S8 are added to the costs of $2.654,544 from the two previous billings, the cinulative cost of

$3,784,932 through June 22, 1985 exceeds the maximum fee of $3,077,400 l

as stated in 10 CFR 170.21. Accordingly,$707,532 has been subtracted l

from the costs of $1,130,388, leaving a balance due of $422,856.

In accordance with Footnote 2 of 10 CFR 170.21, and since your Company received an operating license (5% power) on November 25, 1985, only

$422,856 may be assessed for the operating license review. The Office j

of Resource llanagement has been notified to bill your Company for this j

amount. When making payment, please make reference to the bill number.

Sincerely, I

8603030038 860220 M. ' #

PDR ADOCK 05000423 l

P PDR C. James Holloway, Jr., Acting Director License Fee Management Staff Office of Administration

Enclosure:

la stated

/

l

..LFMS :

.M.... L

.{.

4 j

..L

.CJ..

. ay jp..

.L.

L 2

.i

~*

h l

l l

I 2/.f.T/.86 l

.-e v

T"

_ _. __ :L i

o"=>

i

..g.,

wne ronu ns oo.somacu ono OFFICIAL RECORD COPY

i North:ast Nuclear Energy Company i

Operating License Review Costs From 12/23/84 Through 6/22/85 FACILITY: MILLSTONE 3 DOCKET NO.: 50-423 Costs Per Professional Prograr. Office Professional Sta f f-hours Staff-hour Contractual Total Review Sta f f-hour

_ Expended Costs Costs Costs 1.

NRR

$62 6,947.4

$430,739

$130,524

$561,263 2.

IE-HQ 53 2,417.0 128,101 177,930 306,031 3.

REGIONS 53 4,494.5 238,209 11,186 249,395 4.

ACRS 62 10.0 620 620 5.

MMSS 58 225.5 13.079

___13,079 Total Cost: $1,130,3881/

1/ en the costs of $1,130,388 Wh are added to the costs of $2,654,544 from the two previous billing periods, the cumulative costs through June 22,1985 are 53,784,932. This total exceeds by $707,532 the maximum fee of $3,077,400 as currently stated in 10 CFR 170.21.

Accordingly, S707,532 has been subtracted from the costs of 51,130,388, leaving a total of $422,856 to be assessed.

In accordance with Footnote 2 of 10 CFR 170.21 and since the licensee received an operating license (5% power) on November 25, 1985, only

$422,856 may be assessed for the OL review through issuance of the 100% power license.