ML20141K552
| ML20141K552 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 01/17/1986 |
| From: | Holloway C NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Jeffery Griffin ARKANSAS POWER & LIGHT CO. |
| References | |
| NUDOCS 8601220577 | |
| Download: ML20141K552 (2) | |
Text
'
s JAN 171986 Docket Nos. 50-313 50-368 Arkansas Power and Light Company ATTN: Mr. John W. Griffin Senior Vice President Energy Supply Post Office Box 551 Little Rock, AR 72203 Gentlemen:
As you are aware,10 CFR 170 (" Fees for Facilities and Materials Licenses and Other Regulatory Services...") was revised effective June 20, 1984. Our letter notice of May 24, 1984, addressed the major changes in the rule and transmitted a copy of the revised rule to you.
One of the requirements of the revised rule is that companies be billed at six-month intervals as review of applications progresses.
The following types of applications fall under the six-month billing process:
'l 1.
Applications for operating licenses and design approvals (Sections 170.12(b & e) and 170.21.A through G),
2.
Applications for amendments to construction permits and operating i
licenses and other approvals related thereto such as reliefs and exemptions fron. regulation requirements (170.12(c & d) and 170.21.A through G), which were filed on or after June 20, 1984.
3.
Part 55 Operator Replacement and Requalf fication Services and related activities performed on or'after June 23,1984(Sections 170.12(f)and170.21.I),
4.
Services required on or after June 23, 1984, for the certification of individuals as instructors for reactor operators-l (Section170.12(f)and170.21.J.3),
S 5.
Review of topical and. other reports and reyfsions or amendments to accepted reports.(Section 170.12(f) and 170.21.J.1, J.2 and J.4). -
0 3
OPPIC3 M SusneAa4E h D%T3>
w;c ronu sia no-80) NRCM 0240 OFFICIAL RECORD COPY
o JAN 171986 Since the revised rule became effective on June 20, the end of each six-month cycle for the above applications and services is the last NRC full pay period in December and June of each year. On this basis, the first si:t-month cycle for them ended Decenber 22, 1984, and the second six-month cycle ended on June 22, 1935. Recently bills were issued for most of the applications under category 1 above for the cycle ending December 22, 1984. !1e are actively compiling data for billing categories 2 through 5 above for the first six-month cycle and you can expect to receive bills from the NRC's Office of Resource Managenent as we complete the fee computations for each category.
Each category will be on a separate invoice. Contractual costs cover the period of July through November 30, 1984.
For those applications for which you paid the $150 application fee, credit wf11 he given in the first bills for this application fee.
If the cost to December 22, 1984, is less than $150, the balance of the credit will be given in subsequent bills.
Footnote 2 to the schedule in 10 CFR 170.21 provides that no application review costs will be less than $150.
If you have a question or wish to challenge a portion of a teill, we would suggest that you pay the unchallenged portion of the hf11 by the due date to avoid interest and penalty charges on that portion.
Enclosed for your information is a copy of the "NRC procedures for Extending Payment Dates of License Fee Billings."
In the future, we do not plan to send letters to notify you of the iminent issuance of bills.
Please accept our apologies for the delayed issuance of the bills under the revised schedule.
Sincerely, N5Tdd c.zame, yng,4,3 C. James Holloway, Jr., Acting Director License Fee Management Staff Office of Administration
Enclosure:
Procedures for Extending Paynent Distribution w/o enclosures:
PDR LPDR Regulatory Docket File LFMS Reactor File CJHolloway RMDiggs LSolander LFMS R/F DW/Part 55 Ltr:LFMS OF FICE ) LFMS:ADMg LFMS:ADM EME)
Di l[/gO9.$p-/.l(( [85 DATE)
NRC FORM 318 (10-80) NRCM O240 0FFICIAL RECORD COPY