VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 85-12 FOR THE MONTH OF DECEMBER, 1985 8601220099 851231 PDR ADOCK 05000271 R
t OPEl% TING DATA REPORT Docket No.
50-271 Date 860110 Completed by F.J. Burger Telephone (802) 257-7711 i
OPERATING STATUS Notes:
1.
Unit Name:
Vermont Yankee 2.
Reporting Period:
December 3.
Licensed Thermal Power (MWt):
1593 4.
Nameplate Rating (Gross MWe):
540 5.
Design Electrical Rating (Net MWe):514(oc) 504(cc) 6.
Maximum Dependable Capacity (Gross We):
535 7.
Maximum Dependable Capacity (Net MWe):
504 8.
If changes occur in capacity ratings (Items f*Jmber 3 through 7) since last report, give reasons:
NA 9.
Power level to which restricted, if any (Net MWe): NA i
- 10. Reasons for restrictions, if any:
NA 1
This month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744.00 8760.00
- 12. Nt.snber of Hours Reactor was Critical 0.00 6297.13 93111.06
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 0.00 6288.28 90718.35
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00 i
- 16. Gross Thermal Energy Generated (MWH) 0.00 9550621.00 132109630.50
- 17. Gross Electrical Energy Generated (MWH) 0.00 3166154.00 43955902.00 l
- 18. Net Electrical Energy Generated (MWP) 0.00 2999402.00.
41700250.00
- 19. Unit Service Factor 0.00 71.78 77.93
- 20. Unit Availability Factor 0.00 71.78 77.93
- 21. Unit Capacity Factor (using MDC Net) 0.00 67.94 71.08
- 22. Unit Capacity Factor (using DER Net) 0.00 66.61 69.70 4
- 23. Unit Forced Outage Rate 0.00
.32 6.92 i
- 24. Shutdowns scheduled over next 6 months (Type, Date and Duration of Each):
Refueling outage becan September 21,1985 for 32 weeks.
l
- 25. If shut down at end of report period, ' estimated date of startup:May 3,1986
- 26. Units in Test Status (prior to commercial operation): NA Forecast Achieved Initial Criticality Initial Electricity Commercial Operation i
I
AVERAGE DAILY UNIT POWER LEVEL Docket No.
50-271 Unit Versort Yankee Date 860110 Completed by F.J. 8urcer Telephone (802) 257-7711 MONTH December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
.28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
INSTRUCTIONS:
On this format, list ~the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Dock;t No.
50-271
~
Unit Vermont Yankee UNIT SHUTDOWNS AND POWER REDUCTIONS Date 860110 Completed by F. J. Burger REPORT MONTH _ December Telephone (802) 257-7711 1
2 3
4 5
No.
Date Type Duration Reason Method of License System Component Cause and Corrective Action to (hours)
Shutting Down Event Code Code Prevent Recurrence Reactor Report #
85-14 851201 S
744 C
1 N/A N/A N/A 1985 Refueling / Maintenance /Recirc (cont)
Pipe Replacement Outage in progress.
1 2
3 4
F-Forced A-Equipment Failure (Explain)
Method:
Exhibit G - Instructions S-Scheduled B-Maintenance or Test 1-Manual for Preparation of Data Entry C-Refueling 2-Manual Scram Sheets for Licensee Event D-Regulatory Restriction 3-Automatic Scram Report (LER) File (NUREG 0161)
E-Operator Training and License Examination 4-Other (Explain)
F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain)
-n
r o 1 o 1 N
s 7
O u 7 I
e B
T 1
e 7
C 7 m 5
A 2
J. 2 r
- a E
0 v F
)
V 5
2 I
t y0 T
n 0 b8 C
.o 1
(
E om 1
de R
Nr 0 en R
e 6 t o O
t V_ 8eh C
l p kt_ epe ci t ml on a o e DU D C l T
L US ER NO I
TCNU F
L AM ESUAC E
G E
A C
T N
U A
OR N
E E
RB T
OM N
U I
RN A
E N
L D
E T
E A
FC L
ON E
A R
EN RE Y
UT T
TN E
AI F
NA A
N S
T N
EM P
I U
E Q
N E
O N
il
!l ll l
l1!
Iiii!<
t I
i
>l lt l!;
!l
{t j!
Ilr t
~
Dock;t No.
50-271 Unit Vermont Yankee Date 860110 a
Completed by F.J. Burger Telephone (802) 257-7711 REPORT MONTH December SUNGRY OF OPERATING EXPERIENCES Hiahliants Vermont Yankee operated at 0% of rated thermal power for the month.
Gross electrical generation was O
MWH, or 0% of design electrical capacity.
Operatina Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
Throughout the reporting period, the plant was shutdown for the 1985 Refueling / Maintenance /Recirc Pipe Replacement Outage.
a n.
_____._______m
b,
. VERMONT YANKEE NUCLEAR POWER CORPORATION ~
P. O. BOX 157 GOVERNOR !!UNT ROAD
. VERNON. VEILMONT 05354 VYV 86-7 January 10,- 1986 U. S. Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D. C.
20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of-December,1985.
Very truly yours, VERMONT YAWEE NUCLEAR POWER CORP.