ML20141J893
| ML20141J893 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 05/21/1997 |
| From: | Howell A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hutchinson C ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20141J898 | List: |
| References | |
| 50-313-96-28, 50-368-96-28, NUDOCS 9705280254 | |
| Download: ML20141J893 (5) | |
See also: IR 05000313/1996028
Text
~ ~ ~ . - - ,
n..
h
- e
e' "E%e
UNIT ED STATES
j
~~
?t
NUCLEAR REGULATORY COMMISSION
[ - .-
,
i- -
c
!
i..
' ,
j.
REGloN IV
i
[
$
61t RYAN PLAZA DRIVE, sulTE 400
%
,
-
AR LINGToN, T E XAS 76011-8064
9....
r
MAY 21 1997
l
C. Randy Hutchinson, Vice President
Operations,
i
Arkansas Nuclear One
I
Entergy Operations, Inc.
.j
j
1448 S.R. 333
Russellville, Arkansas 72801-0967
j
SUBJECT: NRC INSPECTION REPORT 50-313/96-28;50-368/96-28
Dear Mr. Hutchinson:
l
An NRC inspection was conducted November 25 through December 13,1996, at your
Arkansas Nuclear One, Units 1 and ?, rsactor facilities. The enclosed report presents the
scope and results of that inspection. The inspection focused on your handling of and
respease to identified primary-to-secondary leakage in Unit 2 Steam Generator B.
I
Your overall handling of the Unit 2 leakage event was viewed as excellent and indicative of
well trained operators and chemistry support personnel. We consider that an appropriate .
examination scope was utilized for bounding the extent and magnitude of degradation
present in the steam generators. It is our understanding that, as a result of the data
obtained during Outage 2F96-1, you plan to perform additional eddy current examinations
during a mid-cycle outape subsequent to Refueling Outage 2R12.
One unresolved item was identified concerning the disregarding of bobbin coil data, which
indicated the presence'cf through-wall flaws in excess of the plugging and repair limit of
the Technical Specifications, based on acceptable motorized rotating pancake coil
information. This matter is discussed in Section E1.1 of the enclosed inspection report.
I
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Public Document Room (PDR).
i
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
'
/
h Arthur T. Howell lli, Director
) Division of Reactor Safety
kklkkk!kl,
9705280254 970521
ADOCK 05000313
G
u
.
.
Entergy Operations, Inc.
-2-
Docket Nos.: 50-313; 50-368
Enclosure:
NRC inspection Report
50-313/90-28;50-368/96-28
.
,
cc w/ enclosure:
Executive Vice President
& Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President
,
Operations Support
!
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286
Manager, Washington Nuclear Operations
ABB Combustion Engineering Nuclear
Power
12300 Twinbrook Parkway, Suite 330
.
Rockville, Maryland 20852
County Judge of Pope County
Pope County Courthouse
Russellville, Arkansas 72801
,
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3'502
David D. Snellings, Jr., Director
Division of Radiation Control and
Emergency Management
Arkansas Departmcnt of Health
4815 West Markham Street, Mail Slot 30
Little Rock, Arkansas 72205 3867
.
1
.
~
.
Entergy Operations, Inc.
-3-
,
Manager
Rockville Nuclear Licensing
Framatome Technologies
1700 Rockville Pike, Suite 525
i
Rockville, Maryland 20852
1
i
..
-
.,
. .
. . . .
. . - - _ _ . - . . - . - -
. - . .
- . - , . . - .
. . . - . - . - . .
-. _ . . . _ - . -
,
~.
i
I
l-
l
Entergy Operations, Inc.
-4-
'
.
.
EMei! report to T. Boyce (THB)
,
j
r+v:. ,eport to NRR Event Tracking System (IPAS)
i
l
E-Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE01)
bec distrib. by i.N:
Regional Adm! .istn ro
Resident inspector
,
DRP Director
MIS System
'
Brr, :'h Chief (Dif Q
RIV File
Project Engineer (U3P/.,s
DRS-PSB
Branch Chief (DRP\\TSS)
DOCUMENT NAME: R:\\_ANO\\AN628RP.lXB
To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Ccpy with enclosures "N" = No copy
RIV:TA:DRS
fj D:D[g] /
D:DRW
IBarnes/Imb @ f)
TPGninn
ATHowelkill
~
05/4/97
05{%97
05p(/97 "
OFFICIAL RECORD COPY
. . _ .
-
-
-
- .
--
.
-.
. - _ _ _ _ . _
__ - . . .
. . . _
._
___..m._.-..
.
. . . . .
. . _ . . . _ _ . _ _ _ . _ _ _ _ _ _ _ , _ _ . . . _ _ . _ . _ . . .
-
f
.
N
!
.
!
,
Entergy Operations, Inc.
-4-
f
,
I
i
I
E-Mail report to T. Boyce (THB)
5
E-Mail report to NRR Event Tracking System (IPAS)
l
l
E-Mail report to Document Control Desk (DOCDESK)
,
t
.
bec to DCD (IE01)
bec distrib. by RIV:
!
,
'
i
Regional Administrator.
Resident inspector
i
f
DRP Director
MIS System
- ~
i
l
Branch Chief (DRP/C)
RIV File
'
!-
Project Engineer (DRP/C)
DRS-PSB
i
b. "cb Chief (DRP\\TSS)
!
i
.r
!
i
,
!
i
'!
i
i
6
'
DOCUMENT NAME: R:\\_ANO\\AN628RP.lXB
,
!
To receive copy of document, Indicate in box: "C" = Copy without enclosures
"E" = Copy with enclosures "N" = No copy
RIV:TA:DRS
fj D:Df)f) /
D:DR@
.
I
IBarnes/Imb (fVfD
TPGwynn
ATHowelLill
~
.
q
05/,(,/97
05(M97
05g(/97 '
OFFICIAL RECORD COPY
?
i
180039
r
,
,-
-
-
-
._. ,.
. _ ,
,._
_ , _
.._
_ - _ _