ML20141J771
| ML20141J771 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 05/21/1997 |
| From: | Howell A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gambhir S OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20141J775 | List: |
| References | |
| 50-285-97-01, 50-285-97-1, NUDOCS 9705280217 | |
| Download: ML20141J771 (5) | |
See also: IR 05000285/1997001
Text
.. - - ~ .
-._
_ ~ .
. . ~ . . - - . - - . _ - . . . . . . . - -
. - - - - - . - . . -
- . . _ . . .
j
-
,
-
. . .
ka ps%
UNITED STATES
9
r
. *.
NUCLEAR REGULATORY COMMISSION
o
.
{
c
REGloN Iv
I
k+9*****/
8
611 RV AN PLAZA drive, SulTE 400
ARLINGTON, TEXAS 760114064
MAY 21 1997
S. K. Gambhir, Division Manager
,
Production Engineering
l
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
'
P.O. Box 399
Hwy. 75 - North of Fort Calhoun
Fort Calhoun, Nebraska 68023-0399
SUBJECT: NRC INSPECTION REPORT 50-285/97-01
l
Dear Mr. Gambhir
)
An NRC inspection was conducted April 14 through May 6,1997, at your Fort Calhoun
Station reactor facility. The enclosed report presents the scope and results of that
inspection.
The inspection included an evaluation of seven appiicants for senior reactor operator
licenses. We determined that all of the applicants satisfied the requirements, and the
appropriate licenses are in the process of being issued.
The questions associated with the control room systems and facility walkthrough portion
of the operating test of the examination submitted by your staff were inadequate for
administration prior to incorpoiation of changes suggested by the chief examiner. These
changes involved replacement or revision of nine of the ten questions to achieve a
cognitive level of difficulty which would discriminate at the required knowledge level.
These revisions were necessary to satisfy the NRC's individual test item quality
expectations, consistent with the NRC's Examination Standards, which had been recently
clarified to the regional staff following an internal audit., We regret the impact this imposed
on your staff, but at the same time, we commend them for their prompt and effective
efforts to enhance the quality of the examinations. No further response by you is required.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Prectice," a copy of this letter
and its enclomre will be placed in the NRC Public Document Room (PDR).
j
(
hi
l
lil.l!Ol.El.l!!!.Olll.llWi.llli.klHi.ll
~
9705280217 970521
ADOCK 05000285
G
m
1
-
.
,
Omaha Public Power District
-2-
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
/
'
~
h Arth r T. Howell, I!I, Director
i Division of Reactor Safety
Docket No.: 50-285
License No,: DPR-40
Enclosure:
NRC Inspection Report
50-285/97-01
cc w/ Enclosure and Attachments 1 and 2 only:
James W. Tills, Manager
Nuclear Licensing
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399
Hwy. 75 - North of Fort Calhoun
Fort Calhoun, Nebraska 68023-0399
James W. Chase, Manager
Fort Calhoun Station
P.O. Box 399
Fort Calhoun, Nebrasta 68023
Perry D. Robinson, Esq.
Winston & Strawn
1400 L. Street, N.W.
Washington, D.C. 20005-3502
Chairman
Washington County Board of Supervisors
Blair, Nebraska 68008
.
'
l
i
Omaha Public Power District
-3-
'
i
1
Cheryl Rogers, LLRW Program Manager
i
Environmental Protection Section
Nebraska Department of Health
301 Centennial Mall, South
P.O. Box 95007
j
Lincoln, Nebraska 68509-5007
j
'
i
7
1
4
'
.
)
l
1
!
i
a
i
i
- .--..
. .. .- .- .
--.
. . . .
. . _ -
.- . .
_
~
- - . - . - - - - - - - . ~ _ . --.
.
.
.
i
Omaha Public Power District
-4-
l
!
.1
E-Mail report to T. Boyce (THB)
l
E-Mail report to NRR Event Tracking System (IPAS)
t
E-Mail report to Document Control Desk (DOCDESK)
bec to DCD
IE42) w/ Enclosure and Attachments 1 and 2 only:
j
bec distrib. by RIV:
Regional Administrator
DRS-PSB
!
DRP Director
MIS System
!
Branch Chief (DRP/B)
RIV File
i
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
Resident inspector
bec distrib. by RIV w/ Enclosure and Attachments 1-3:
S. Richards (HOLB/NRR)
L. Hurley
l
i
i
i
DOCUMENT NAME: R:\\_FCS\\FC701rp,REL
To receive copy,of docunpnt, indicate in box: "C" = Copy wittyty enclosures
"E" = Copy with enclosures "N" = No copy
RIV:RE:OB \\' '
bl
C:OB
&
D:DRPL/,
f
D:DRS f)(>
_
I
REL9ntz/Imb
JLPellet
M
TPGwypn 9'
ATHoMl]Il ' f
05d/97
05/ff97
9' ' 05A4$
)
05tr/97"
OFFIClAL RECORD COPY
.
/
.-
,
Omaha Public Power District
-4-
E-Mail report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
,
E-Mail report to Document Control Desk (DOCDESK)
i
bec to DCq,dpWff('IE42) w/ Enclosure and Attachments 1 and 2 only:
i
bec distrib. by RIV:
'
!
Regional Administrator
DRS-PSB
l
DRP Director
MIS System
!
Branch Chief (DRP/B)
RI V File
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
Resident inspector
,
bec distrib. by RIV w/ Enclosure and Attachments 1-3:
S. Richards (HOLB/NRR)
L. Hurley
i
DOCUMENT NAME: R:\\_FCS\\FC701rp.REL
To receive copy,of docurr ent, indicate in box: "C" = Copy wM enclosures
"E" = Copy with enclosures "N = No copy
RIV:RE:OB \\' '
b
C:OB
&
D:DRPL/f
f
D:DRS f)fl ;
l
_
RELantz/Imb
JLPellet
y
TPGwyffn 9'
ATHo % )ll{
05h/97
05/lf97
9' ' 054G7/
}
05tt/97'
OFFICIAL RECORD COPY
280041