ML20141J514

From kanterella
Jump to navigation Jump to search
Forwards LER 97-006-01 Re Lack of Coordination of 120 Volt non-safe Shutdown Circuit Breakers in Distribution Panels W/Safe Shutdown Circuit Breakers,Causes Plant to Be Outside Design Basis
Date released: 06/03/2020 Download: ML20141J514


:on 970219,failure to Properly Coordinate 120 Volt Distribution Panel Circuit Breakers w/480 Volt Supply Circuit to 120 Volt Distribution Panels Occurred.Caused by Error by Architect Engineer.Affected Circuits Modified
ML20141J520
Person / Time
Site: Clinton 
Issue date: 08/06/1997
From: Tockstein D
ILLINOIS POWER CO.
To:
References
Download: ML20141J520 (5)
Forwards LER 97-006-01 Re Lack of Coordination of 120 Volt non-safe Shutdown Circuit Breakers in Distribution Panels W/Safe Shutdown Circuit Breakers,Causes Plant to Be Outside Design Basis
ML20141J511
Person / Time
Site: Clinton 
Issue date: 08/06/1997
From: Romberg W
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20141J511 (1)