Provides Clarification of Statement Documented in Section M, 125 Vdc Vital Battery Modified Performance Test, in Response to Insp Repts 50-369/96-10 & 50-370/96-10 on 961130
ML20141J146
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/20/1997
From: Barron H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-369-96-10, 50-370-96-10, NUDOCS 9705270267
Download: ML20141J146 (1)


Text

._

m

.... ~

ll' I

.,,, -,1Jukethirer Company H B llvxa

%Guire Nucleur GeneradonIkportment l' ice Pressdent 17700Hagen ferryRoad(h!G0ll' )

(W1)RT54W P

Huntmrille. SC28078D10 (likt)&U@ Fax DUKEPOWER May 20, 1997 U.

S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555

Subject:

McGuire Nuclear Station Docket Nos. 369, 370 j

NRC Inspection Report 50-369/96-10, 50-370/96-10, Commitnant Clarification On November 30, 1996, the NRC completed an inspection at McGuire which was documented in NRC Inspection Report 50-369/96-10 and 50-370/96-10.

The purpose of this letter is to provide clarification of a statement documented in i

Section M2.2, "125 VDC Vital Battery Modified Performance E

Test."

Section M2.2 states in part, "To provide additional assurance that the installed battery banks performance would not degrade over time, the licensee committed to perform additional testing of the sample cells from the EVCB and EVCD batteries."

The statement requires clarification regarding the additional testing that is planned by McGuire Additional testing is planned to be performed on degraded l

cells from vital battery banks EVCC and EVCA.

These cells will undergo destructive test / analysis at Argonne National Laboratory to facilitate the determination of the root cause of the battery capacity loss.

In addition, McGuire is participating in a test conducted by the AT&T Round Cell j

Nuclear Utility User's Council by providing three cells to 1

the Conshohocken Test Facility to be tested along with other j

cells from the industry to determine the charge recovery characteristico following multiple shallow discharges.

I Should this clarification of these plans create any concerns or questions on the part of the NRC or their inspectors,

)

please direct them to Kay Crane, McGuire Regulatory

{

Compliance at (704) 875-4306.

A M G '7001G

^

H.

B. Barron, Vice President J

{[~C) ( 'c)

McGuire Nuclear Station 9705270267 970520 i