Forwards Insp Rept 50-423/86-08 on 860225-0414.No Violation Noted.Problem w/Brown-Bouveri 600 Circuit Breaker Wiring Harness Damage Noted.Evaluation Re Generic Aspect of Problem Requested
ML20141H831
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/18/1986
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20141H835 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8604250196
Download: ML20141H831 (2)


See also: IR 05000423/1986008

Text

_

-

APR 181986

e

Docket No. 50-423

License No. NPF-49

Northeast Nuclear Energy Company

ATTN:

Mr. John F. Opeka

Senior Vice President-Nuclear

Engineering and Operations Group

P.O. Box 270

Hartford, Connecticut

06101

Gentlemen:

Subject:

Inspection 50-423/86-08 (2/25/86-a/14/86)

This refers to the routine inspection by Messrs. J. Shedlosky and F. Casella of

this office from February 25 to April 14, 1986 at the Millstone Point Nuclear Power

Station, Unit 3.

The inspection findings have been discussed with Mr. Crockett

and other members of your staff during and at the conclusion of the inspection.

No violations were identified.

The transition of the operating staff from the construction phase to plant opera-

tions has been progressing.

The operating staff has demonstrated a capacity and

willingness to learn from the plant transients and trips which have occurred.

There was a noteworthy improvement in performance during the recovery from the

March 31 - April 9 outage as compared to the recovery from the February 24 - March

5 outage. We are pleased to see a decrease in the incidence of personnel-induced

transients as the startup program progresses.

The enclosed report describes a problem with Brown-Bouveri K600 circuit breaker

wiring harness damage due to contact with the racking pawl.

We understand that

you are evaluating this matter for generic implications.

Please let me know, at

your earliest convenience, what your findings are and your plans regarding reporting

the generic aspects of this problem.

I

Thank you for your cooperation.

j

Sincerely, OriginalSigneasye

[> Edward C. Wenzinger, f

>

let

W Projects Branch No. 3

Division of Reactor Projects

En.losure:

NRC Region I Inspection Report 50-423/86-08

8604250196 060418

PDR

ADOCK 05000423

O

PDR

,f

--

E ;oy .

,4g y *

-

i.

l

Northeast Nuclear Energy Company

2

APR 181986

'

.

1

cc w/ encl:

!

V. Papadopoli, Construction Quality Assurance Supervisor

!

E. R. Foster, Director of Generation Construction

i

W. J. Mroczka, Vice President, Nuclear Operations

l

D. O. Nordquist, Manager of Quality Assurance

l

R. T. Laudenat, Manager, Generation Facilities Licensing

W. D. Romberg, Station Superintendent

Public Document Room (PDR)

l

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

i

NRC Senior Resident Inspector

i

State of Connecticut

i

bcc w/ encl:

Region I Docket Room (with concurrences)

,

l

Management Assistant, DRMA (w/o enc 1)

i

DRP Section Chief

G. Walton, SRI, BV-2

i

T. Rebelowski, SRI, Millstone 1&2

l

B. Doolittle, LPM, NRR

,

!

!

!

<

!

,

!

l

!

RI:DRP

RI:D P

P

!

p: -

f

!

Shediosky/meo

zinger

4/15/86

,

l

OFFICIAL R CORD COPY

l

l

l

l

k