DOCKET NO.

50-483 UNIT NAME CALLAWAY UNIT 1 DATE 2-4-M C G 6PL.m,A m B Z D.

B. PRATTE

~

TELEPHONE (L) o/6-846'O PART A OPERATIONS

SUMMARY

Tae Callaway Unit was operated at 100% power for the month of January with the fellowing exceptions.

1.

Januarv 4 - Power was reduced to conserve water for the cooline tower due to an intake system outage to repair leaks.

2.

January 11 - Power was reduced to 50% to reduce exposure during S/G manwav leak repair.

3.

January 20 Minor power reductions due to 'A' Heater Drain Pump outage and Feedwater Heater leak repairs.

4.

January 30 - Minor power reduction due to

'A' Heater Drain Pump seal failure.

PART B PORV AND SAFETY VALVE

SUMMARY

NONr e

CA-#804, 8604240425 860210 04/10/85 PDR ADOCK 05000483 QDP-ZZ-04204 R

PDR Page 1 of 4 f

f II

- - +

-eeaa s

m?

b u m,m-e-m i

l Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-483 UNIT Callaway DATE 2-4-86 D. B. PRATTE COMPLETED BY TELEPHONE (314) 676-8460 MONTH JANUARY 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net)

'069 1129 1

1 37 1112 1097 2

18 1122 1102 3

3, 4

901 1084 g

5 1067 1061 21 1125 1063 e

g 1124 1073 y

g 1121 1116 8

24 g

1122 997 5

1112 1105 to 3

11 936 1099 27 12 721 1118 g

1063 1119 13 y

34 1067 1115 y

15 1065 1091 g

1044 16 Page 2 of 4 CA-9804 04/10/85 QDP-ZZ-04204

Part D OPERATING DATA REPORT 50-483 DOCKET NO.

UNIT 2-4-86 DATE COMPLETED BY D.

B. PR A'rTr (314) 676-8460 TELEPHONE OPERATING STATUS 744 Januarv 1986 GROSS HOUR $ 1N REPORTING PERIOD:

1. REPORTING PERIOD:

34lI M AX. DEPENO. CAP ActTY IMWewal:

1170 i

2. CURRENTLY AUTHORIZED POWER LEVEL (MWtt:

oESIGN ELECTRICAL RATING (MWo. Net):

1171*

  • At stretch power level which is not currently authorized under the Operating License 1007 r
3. POWER LEVEL TO WHICH RESTRICTED ttP ANY) 16):

j

4. REASONS FOR RESTRICTION OF ANYl:

THis MONTH YR TO DATE CUMULATIVE 744 744 4907.5

5. NUMSER OP HOURS REACTOR WAS CRITICAL
6. REACTOR RESERVE SHUTDOWN HOURS 744 744 8931.4
7. hours GENERATOR ON UNE..

i 0

0 o

S. UNIT RESERVE SHUTDOWN HOURS

.@..?'55.73?2.445.73) 28.463.254

s. GROSS THERMAL ENERGY GENER ATED (MWM) /

835,132 835,132 9,649.075

10. GROSS ELECTRICAL ENERGY GENERATl!D (MWHi...

795,379 795,379 9,164,166

11. NET ELECTRICAL ENERGY GENEHATED (MWHI 100%

100%

93.97

12. REACTOR SERVICE PACTOR 100%

100%

91.qv

13. REACTOR AVAILASIUTY FACTOR..

100%

100%

91.17

14. UNIT SERVICE FACTOR..........

100%

100~

91.1-

15. UNIT AVAILASit.lTY FACTOR 95.5%

95.5%

83.47

16. UNir CAPACiTf PACTOR (Unine MOC1..

9I 3I

91. W 70 U
17. UNtf CAPACITY PACTOR (Ueweg Deep MWel.

0.0%

0.0%

5.7%

18. UNtT PORCED OUTAGE RATE......
19. SHUTDOWNS SCHEDULED CVER NEXT S MONTHS (TYPE. DATE. ANO OURATION OF EACMl:
20. IF SHUT DOWN AT END OF REPORT PER(00. ESTIMATED DATE OF STARTUP:
21. Un
  • s in test status (prior to commercial operat, ion):

Forecast Achieved Initial Criticality 10-2-84 Initial Electricity 10-24-84 Commercial Operation J 8 5 * *-

    • Revised date of commercial operation from that last reported during

/E[/E/ ['b the March 1985 re orting period.

'i'his revised date reflects the CA-#804 date agreed upon y Union Electric Company and the Missouri Public Service Commission. This date has not be'en included in any previous 04/10/85 Operating Data Report. Part D, Item 21 of this report will not be QDP-ZZ-04204 included in future reports.

Fage 3 of 4

1:

li

\\

l!

u i

Part E DOCKET NO.

50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway DATE 2-4-86 COMPLETED BY D.

B.

PRATTIL TELErtlONE MI 41 676-R460 REPORT MONTil

.IANUARY l986 METHOD OF 1

TYPE SHtJTTING DOWN F: FORCED DURATION THE REACTOR On NO.

DATE S: SCHEDULED IHOURSI REASON REDUCING FOWER CORRECTIVE ACTIONS / COMMENTS 1.

1-4-86 S

32 hrs.

B 1

Reduced power 20% for intake leak repairs.

2.

1-11-8(

S 37 hrs.

B 1

Reduced power to 50% to reduce exposure during S/G manway repairs.

I tanamanagy; REASON te.TM00 A: EQUIF40ENT FAILUBE(ERFt.A8Np I: MANUAL 3: MAltfT.OR TEST 2: MANUAL 3 CRAM C: REFUERJNG 3: AUTOMATE SCRAM

,o o h D: REGL'LATORY.RESTascrioes 4: OrtER(exFE4ese t:8

  • i 7D1 E: OPERATOR TkAINING AND l yR*

LKENSE EXAlelNAT90N

- I mE F: ADtNNIETSATIVE

{$*

G: OPERATIONAL ERROR (EXFLAIN)

. g N Ott0ER(EXFLASN) i e Page 4 of 4