DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 2-4-M C G 6PL.m,A m B Z D.
B. PRATTE
~
TELEPHONE (L) o/6-846'O PART A OPERATIONS
SUMMARY
Tae Callaway Unit was operated at 100% power for the month of January with the fellowing exceptions.
1.
Januarv 4 - Power was reduced to conserve water for the cooline tower due to an intake system outage to repair leaks.
2.
January 11 - Power was reduced to 50% to reduce exposure during S/G manwav leak repair.
3.
January 20 Minor power reductions due to 'A' Heater Drain Pump outage and Feedwater Heater leak repairs.
4.
January 30 - Minor power reduction due to
'A' Heater Drain Pump seal failure.
PART B PORV AND SAFETY VALVE
SUMMARY
NONr e
CA-#804, 8604240425 860210 04/10/85 PDR ADOCK 05000483 QDP-ZZ-04204 R
PDR Page 1 of 4 f
f II
- - +
-eeaa s
m?
b u m,m-e-m i
l Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-483 UNIT Callaway DATE 2-4-86 D. B. PRATTE COMPLETED BY TELEPHONE (314) 676-8460 MONTH JANUARY 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net)
'069 1129 1
1 37 1112 1097 2
18 1122 1102 3
3, 4
901 1084 g
5 1067 1061 21 1125 1063 e
g 1124 1073 y
g 1121 1116 8
24 g
1122 997 5
1112 1105 to 3
11 936 1099 27 12 721 1118 g
1063 1119 13 y
34 1067 1115 y
15 1065 1091 g
1044 16 Page 2 of 4 CA-9804 04/10/85 QDP-ZZ-04204
Part D OPERATING DATA REPORT 50-483 DOCKET NO.
UNIT 2-4-86 DATE COMPLETED BY D.
B. PR A'rTr (314) 676-8460 TELEPHONE OPERATING STATUS 744 Januarv 1986 GROSS HOUR $ 1N REPORTING PERIOD:
- 1. REPORTING PERIOD:
34lI M AX. DEPENO. CAP ActTY IMWewal:
1170 i
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWtt:
oESIGN ELECTRICAL RATING (MWo. Net):
1171*
- At stretch power level which is not currently authorized under the Operating License 1007 r
- 3. POWER LEVEL TO WHICH RESTRICTED ttP ANY) 16):
j
- 4. REASONS FOR RESTRICTION OF ANYl:
THis MONTH YR TO DATE CUMULATIVE 744 744 4907.5
- 5. NUMSER OP HOURS REACTOR WAS CRITICAL
- 6. REACTOR RESERVE SHUTDOWN HOURS 744 744 8931.4
- 7. hours GENERATOR ON UNE..
i 0
0 o
S. UNIT RESERVE SHUTDOWN HOURS
.@..?'55.73?2.445.73) 28.463.254
- s. GROSS THERMAL ENERGY GENER ATED (MWM) /
835,132 835,132 9,649.075
- 10. GROSS ELECTRICAL ENERGY GENERATl!D (MWHi...
795,379 795,379 9,164,166
- 11. NET ELECTRICAL ENERGY GENEHATED (MWHI 100%
100%
93.97
- 12. REACTOR SERVICE PACTOR 100%
100%
91.qv
- 13. REACTOR AVAILASIUTY FACTOR..
100%
100%
91.17
- 14. UNIT SERVICE FACTOR..........
100%
100~
91.1-
- 15. UNIT AVAILASit.lTY FACTOR 95.5%
95.5%
83.47
- 16. UNir CAPACiTf PACTOR (Unine MOC1..
9I 3I
- 91. W 70 U
- 17. UNtf CAPACITY PACTOR (Ueweg Deep MWel.
0.0%
0.0%
5.7%
- 18. UNtT PORCED OUTAGE RATE......
- 19. SHUTDOWNS SCHEDULED CVER NEXT S MONTHS (TYPE. DATE. ANO OURATION OF EACMl:
- 20. IF SHUT DOWN AT END OF REPORT PER(00. ESTIMATED DATE OF STARTUP:
- 21. Un
- s in test status (prior to commercial operat, ion):
Forecast Achieved Initial Criticality 10-2-84 Initial Electricity 10-24-84 Commercial Operation J 8 5 * *-
- Revised date of commercial operation from that last reported during
/E[/E/ ['b the March 1985 re orting period.
'i'his revised date reflects the CA-#804 date agreed upon y Union Electric Company and the Missouri Public Service Commission. This date has not be'en included in any previous 04/10/85 Operating Data Report. Part D, Item 21 of this report will not be QDP-ZZ-04204 included in future reports.
Fage 3 of 4
1:
li
\\
l!
u i
Part E DOCKET NO.
50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway DATE 2-4-86 COMPLETED BY D.
B.
PRATTIL TELErtlONE MI 41 676-R460 REPORT MONTil
.IANUARY l986 METHOD OF 1
TYPE SHtJTTING DOWN F: FORCED DURATION THE REACTOR On NO.
DATE S: SCHEDULED IHOURSI REASON REDUCING FOWER CORRECTIVE ACTIONS / COMMENTS 1.
1-4-86 S
32 hrs.
B 1
Reduced power 20% for intake leak repairs.
2.
1-11-8(
S 37 hrs.
B 1
Reduced power to 50% to reduce exposure during S/G manway repairs.
I tanamanagy; REASON te.TM00 A: EQUIF40ENT FAILUBE(ERFt.A8Np I: MANUAL 3: MAltfT.OR TEST 2: MANUAL 3 CRAM C: REFUERJNG 3: AUTOMATE SCRAM
,o o h D: REGL'LATORY.RESTascrioes 4: OrtER(exFE4ese t:8
- i 7D1 E: OPERATOR TkAINING AND l yR*
LKENSE EXAlelNAT90N
- I mE F: ADtNNIETSATIVE
{$*
G: OPERATIONAL ERROR (EXFLAIN)
. g N Ott0ER(EXFLASN) i e Page 4 of 4