a NRC MONTHLY OPERATING REPORT DOCKET NO.
50:5g2 UNIT NAME P2NGS 2 DATE 02f0Bf86 COMPLETED BY Mu2s Bigbardsgn TELEPHONE 60g:232:5300 4
Ext 6523 s
OREB9IING SIBIug 1.
Unit Name; Palo Vgtdg. Nuclear Ggograting St etigen Unit 2 2.
' Reporting period: January 12@6 3.
Licensed Thermal Power (MWt): 3@00 4.
Nameplate Rating (Gross MWe): 1403 5.
Design Electrical Rating (Net MWe): 1870 6.
Maximum Dependable Capacity (Gross MWe):Tg bg dgtermingd l
7.
Maximum Dependable Capacity (Net MWe):
To bg dgterr togd g
B.
If Changes Occur In Capacity Ratings (Items Number 3 l
Through 7) Since Last Report, Give Reasons:
Recalculated according to. definition ___________________
9.
Power Level ko Which Restricted, If Any (Net MWe):120 MWt 10 MWg)
_ =-----------------
- 10. Reasons For Restrictions, If Any:
____-_6sw EsusC Oseret ins LiceDse __---------------__--.----
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period
___744____
____744___
__1488____
- 12. Number Of Hours Reactor Was Critical
_____0____
_____0____
____0_____
- 13. Reactor Reserve Shutdown Hours
_____0____
__0____
____0_____
i
- 14. Hours Generator.On-Line
_____0____
_____0____
____0_____
- 15. Unit Reserve Shutdown Hours
_____0____
_____0____
____0_____
- 16. Gross Thermal Energy Generated
_____0____
_O____
_0__
(MWH)
J
- 17. Gross Electrical Energy Generated
_____0____
_____0____
____0____
(MWH)
- 18. Net Electrical Energy Generated
_____0____
_____0____
____0____
(MWH)
- 19. Unit Service Factor
___N/A____
___N/A____
__N/A____
- 20. Unit Avetlability Factor
___N/A____
___N/A____
__N/A____
l
- 21. Unit Capacity Factor (Using MDC
___N/A_
___N/A____
__N/A____
Net) l
- 22. Unit Cacacity Factor (Using DER
___N/A____
___N/A____
__N/A____
Net)
- 23. Unit Forced Outage Rate
___N/A____
___N/A____
__N/A____
- 24. Shutdowns Scheduled Over Next 6 Months (Tyoe, Date. and Duration of Each): __No significant outage glanngd until after_____
__--_--_-_____-_-_-- weCCeDty run________________________
25.
If Shutdown At End Of Reoort Period, Estimated Date of Startup:______
N/A
- 26. U$5ts IE Test Status (Prior To Comnercial Ooeration):
Forecast Achieved INITIAL CRITICALITY 3/86
~~~
f INITIAL ELECTRICITY
[~[6/86((((~_
((~~~ _ _ _
_ f h 3bf '
COMMERCIAL OPERATION
__11/86_____
8604240338 860131
~
}
PDR ADOCK 05000529 f
R PDR 1
/
s REFUELING INFORMATION DOCKET NO._QO-522__________
l UNIT _______PVNGS-@_____
DATE_
___02/0@L@@_____
COMPLETED BY_McPc Richandsgn TELEPHONE __608-23g-g300____
__ Ente @523_______
]
1.
Scheduled date for next re f uel i r.g shutdown.
01/02/88 2.
Scheduled date for restart fo11 ewing refueling.
4 02/20/88 3.
Will refueling or resumption of operation thereafter repuire a
]-
Technical Specification change or other license amendment?
I Not Yet Determined What will these be?
l l
Not Yet Determined
]
4.
Scheduled date for submitting proposed licensing action and supporting information.
I Not Yet Determined 5.
Important Licensing considerations associated with refueling,
- e. g.
new or different fuel design or supplier, unreviewed i
design or performance analysis methods, significant changes in j
fuel design, new operating procedures.
1 1
l Not Yet Determined i
6.
The number of fuel assemblies, a) In the core._641___________
t i ~
b )' In the scent fuel Atorage pool._____0_______
7.
Licensed spent fuel storage capacity.____13@2______
J Intended change in scenc fuel storage capacity.__Ngne______
tj j
8.
Projected date of 1.a st refueling that can be discharged to spent fuel storage pool assuming present capacity.
1 2003 (w/ annual reloads and,f,u l l core discharge caoability).
I l
1 AVERAGE DAILY UNIT, POWER LEVEL i
DOCKET NO.
_50_-5 2. 9__ _-__ _
h-U N I T _ _ _
_ _P _V N _G _S _ _2 _ _ _ _ _ _ _
D A TE_ _ __ _0.2. _/.0_ _8 / 8_6_ ______ _
COMPLETED BY_M_. P__.
_R_i c_ h _a rd _s o n.
2 i
i T E L E P H O N E _ 6 _0 2 _- 9 _3 2 _ _5 3 0._0 l
4
_E_ _x _t _. _6 5_ 9 3 t
MONTH:
January 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1, 1
17 __ ___..__._0______________
0
.i 2
_______0 18 - - - _ __
0 1,
3
___________0____
19 0
i 1
4
_________-_0--_-
2 0 __ __
0 _ __ -_
j L
5
_____0 21
_0___
i 6
_0__________
22 ___________0 7
_0_____
23 ___________0_______________
8
____-__-__0____-.
24 ___________0______________
i 1
9 25.__
___0_
0 10 _ __ - _
_0-----
2 6 _ _ _ _ _ __
0=
11 0
27 _____ _
__0__
f i
12 _________
0_ -__ ____ _ _
2 8 _ _ _ _ _ _ _ _ _ _ _0_ _ _._
= _ _ _ _ _ _ _ _
l 13
______0-29 __ _ ______0__________
t i
14
--=_
.____0________
30 ___ ____ __0_______
i 15 ______ --__0_____________
31
____0__
16 ____
_____0.'_
I I
o a
_-n-
-en,.,.
.,n
,_.------.,,.cn-
.n,.
e s
9 SUMM68Y DE REEB@IlNQ EK8E81ENCE EQ8 ISE MQNIH DOCKET NO.___QO-529___________
UNIT _________PMNGS-2__________
DATE_________02/0@f@@__________
COMPLETED BY_M P Eighardson__
s n TELEPHONE __602-932-5300_______
__Egt s 6523__________
01/01 0000 - Plant on Mode 6.
01/04 1510 - Flant in Mode 5.
01/28 0900 - Commenced preparation of plant systems for olant heatup.
5 l
8
' UNIT SHUTDOWNS AND POWER ACDUCTIONS
.F.6. DOCKET NL 8tn 4 99 4 g 4..
8 :'. ' UNIT NANC PVtlCh?
1
('
DATE O l/IO/H6 1
COMPLETED BY E. t'. R i chif rrinnn
~
,C TELEPHONC ~ 4 U -slflf) k l
Fve_6591 I
Hethod of i
Shutting Down System Component Cause & Corrective r
1 Du rn t len 2
3 f.ER 4
5*
Action to No.
Date Type (Hours)
Reason Mosctor No.
Codo Code Prevent Recurrence 1
d s
,s j
Not applicable - reactor has not achieved initia1 criticality, j
i I
t N
4 l
l l-1 6
1 1
a
.~
m.
e
- w
)
1.
2
- J F-forced Rensnn 3:
Hethod:
Exhlblt r - Instrtctions 5-Scheduled A-Equipment Fellpro (Cxplaln) 1-Hanual D-F.11ntenanco or Test for Prnparation of Data C-Rorueling 2-Hanual Serne.
En*.ry sheets for Licensee 3-Autorna tic f.:: ram, tvent Report (LER) File D-Reguintory Restriction 1s-Cont inua t ion f rom-(NUREC 0161)
E-Doorntor Tra ining h I.scense Examine t ton Previous Month F-Admin i s t ra t ivo 5-nediact ion or 70%
5
Arizona Nuclear Power Project Po BOX 52034 e PHOENIX. ARIZONA 85072-2034 February 14, 1986 ANPP-35131-EEVB/LJM/98.05 Mr. Ronald M. Scroggins, Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Docket No. STN 50-529 (License NPF-46)
January Monthly Operating Report File: 86-024-404
Dear Mr. Scroggins:
Attached please find the January,. 1986, Monthly Operating Report prepared and sub-mitted pursuant' to Specification 6.9.1.6 of Appendix A (Technical Specifications) i to the Palo Verde Nuclear Generating Station, Unit 2 Operating License. By copy of this letter, we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.
If you have any questions, please contact me, l
i Very truly yours, k
(*
'inu E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/LJM/rw Attachments cc:
J. B. Martin (all w/a)
R. P. Zimmerman E. A. Licitra A. C. Gehr INPO Records Center S
5 l
J