a NRC MONTHLY OPERATING REPORT DOCKET NO.

50:5g2 UNIT NAME P2NGS 2 DATE 02f0Bf86 COMPLETED BY Mu2s Bigbardsgn TELEPHONE 60g:232:5300 4

Ext 6523 s

OREB9IING SIBIug 1.

Unit Name; Palo Vgtdg. Nuclear Ggograting St etigen Unit 2 2.

' Reporting period: January 12@6 3.

Licensed Thermal Power (MWt): 3@00 4.

Nameplate Rating (Gross MWe): 1403 5.

Design Electrical Rating (Net MWe): 1870 6.

Maximum Dependable Capacity (Gross MWe):Tg bg dgtermingd l

7.

Maximum Dependable Capacity (Net MWe):

To bg dgterr togd g

B.

If Changes Occur In Capacity Ratings (Items Number 3 l

Through 7) Since Last Report, Give Reasons:

Recalculated according to. definition ___________________

9.

Power Level ko Which Restricted, If Any (Net MWe):120 MWt 10 MWg)

_ =-----------------

10. Reasons For Restrictions, If Any:

____-_6sw EsusC Oseret ins LiceDse __---------------__--.----

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period

___744____

____744___

__1488____

12. Number Of Hours Reactor Was Critical

_____0____

_____0____

____0_____

13. Reactor Reserve Shutdown Hours

_____0____

__0____

____0_____

i

14. Hours Generator.On-Line

_____0____

_____0____

____0_____

15. Unit Reserve Shutdown Hours

_____0____

_____0____

____0_____

16. Gross Thermal Energy Generated

_____0____

_O____

_0__

(MWH)

J

17. Gross Electrical Energy Generated

_____0____

_____0____

____0____

(MWH)

18. Net Electrical Energy Generated

_____0____

_____0____

____0____

(MWH)

19. Unit Service Factor

___N/A____

___N/A____

__N/A____

20. Unit Avetlability Factor

___N/A____

___N/A____

__N/A____

l

21. Unit Capacity Factor (Using MDC

___N/A_

___N/A____

__N/A____

Net) l

22. Unit Cacacity Factor (Using DER

___N/A____

___N/A____

__N/A____

Net)

23. Unit Forced Outage Rate

___N/A____

___N/A____

__N/A____

24. Shutdowns Scheduled Over Next 6 Months (Tyoe, Date. and Duration of Each): __No significant outage glanngd until after_____

__--_--_-_____-_-_-- weCCeDty run________________________

25.

If Shutdown At End Of Reoort Period, Estimated Date of Startup:______

N/A

26. U$5ts IE Test Status (Prior To Comnercial Ooeration):

Forecast Achieved INITIAL CRITICALITY 3/86

~~~

f INITIAL ELECTRICITY

[~[6/86((((~_

((~~~ _ _ _

_ f h 3bf '

COMMERCIAL OPERATION

__11/86_____

8604240338 860131

~

}

PDR ADOCK 05000529 f

R PDR 1

/

s REFUELING INFORMATION DOCKET NO._QO-522__________

l UNIT _______PVNGS-@_____

DATE_

___02/0@L@@_____

COMPLETED BY_McPc Richandsgn TELEPHONE __608-23g-g300____

__ Ente @523_______

]

1.

Scheduled date for next re f uel i r.g shutdown.

01/02/88 2.

Scheduled date for restart fo11 ewing refueling.

4 02/20/88 3.

Will refueling or resumption of operation thereafter repuire a

]-

Technical Specification change or other license amendment?

I Not Yet Determined What will these be?

l l

Not Yet Determined

]

4.

Scheduled date for submitting proposed licensing action and supporting information.

I Not Yet Determined 5.

Important Licensing considerations associated with refueling,

e. g.

new or different fuel design or supplier, unreviewed i

design or performance analysis methods, significant changes in j

fuel design, new operating procedures.

1 1

l Not Yet Determined i

6.

The number of fuel assemblies, a) In the core._641___________

t i ~

b )' In the scent fuel Atorage pool._____0_______

7.

Licensed spent fuel storage capacity.____13@2______

J Intended change in scenc fuel storage capacity.__Ngne______

tj j

8.

Projected date of 1.a st refueling that can be discharged to spent fuel storage pool assuming present capacity.

1 2003 (w/ annual reloads and,f,u l l core discharge caoability).

I l

1 AVERAGE DAILY UNIT, POWER LEVEL i

DOCKET NO.

_50_-5 2. 9__ _-__ _

h-U N I T _ _ _

_ _P _V N _G _S _ _2 _ _ _ _ _ _ _

D A TE_ _ __ _0.2. _/.0_ _8 / 8_6_ ______ _

COMPLETED BY_M_. P__.

_R_i c_ h _a rd _s o n.

2 i

i T E L E P H O N E _ 6 _0 2 _- 9 _3 2 _ _5 3 0._0 l

4

_E_ _x _t _. _6 5_ 9 3 t

MONTH:

January 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1, 1

17 __ ___..__._0______________

0

.i 2

_______0 18 - - - _ __

0 1,

3

___________0____

19 0

i 1

4

_________-_0--_-

2 0 __ __

0 _ __ -_

j L

5

_____0 21

_0___

i 6

_0__________

22 ___________0 7

_0_____

23 ___________0_______________

8

____-__-__0____-.

24 ___________0______________

i 1

9 25.__

___0_

0 10 _ __ - _

_0-----

2 6 _ _ _ _ _ __

0=

11 0

27 _____ _

__0__

f i

12 _________

0_ -__ ____ _ _

2 8 _ _ _ _ _ _ _ _ _ _ _0_ _ _._

= _ _ _ _ _ _ _ _

l 13

______0-29 __ _ ______0__________

t i

14

--=_

.____0________

30 ___ ____ __0_______

i 15 ______ --__0_____________

31

____0__

16 ____

_____0.'_

I I

o a

_-n-

-en,.,.

.,n

,_.------.,,.cn-

.n,.

e s

9 SUMM68Y DE REEB@IlNQ EK8E81ENCE EQ8 ISE MQNIH DOCKET NO.___QO-529___________

UNIT _________PMNGS-2__________

DATE_________02/0@f@@__________

COMPLETED BY_M P Eighardson__

s n TELEPHONE __602-932-5300_______

__Egt s 6523__________

01/01 0000 - Plant on Mode 6.

01/04 1510 - Flant in Mode 5.

01/28 0900 - Commenced preparation of plant systems for olant heatup.

5 l

8

' UNIT SHUTDOWNS AND POWER ACDUCTIONS

.F.6. DOCKET NL 8tn 4 99 4 g 4..

8 :'. ' UNIT NANC PVtlCh?

1

('

DATE O l/IO/H6 1

COMPLETED BY E. t'. R i chif rrinnn

~

,C TELEPHONC ~ 4 U -slflf) k l

Fve_6591 I

Hethod of i

Shutting Down System Component Cause & Corrective r

1 Du rn t len 2

3 f.ER 4

5*

Action to No.

Date Type (Hours)

Reason Mosctor No.

Codo Code Prevent Recurrence 1

d s

,s j

Not applicable - reactor has not achieved initia1 criticality, j

i I

t N

4 l

l l-1 6

1 1

a

.~

m.

e

  • w

)

1.

2

- J F-forced Rensnn 3:

Hethod:

Exhlblt r - Instrtctions 5-Scheduled A-Equipment Fellpro (Cxplaln) 1-Hanual D-F.11ntenanco or Test for Prnparation of Data C-Rorueling 2-Hanual Serne.

En*.ry sheets for Licensee 3-Autorna tic f.:: ram, tvent Report (LER) File D-Reguintory Restriction 1s-Cont inua t ion f rom-(NUREC 0161)

E-Doorntor Tra ining h I.scense Examine t ton Previous Month F-Admin i s t ra t ivo 5-nediact ion or 70%

5

Arizona Nuclear Power Project Po BOX 52034 e PHOENIX. ARIZONA 85072-2034 February 14, 1986 ANPP-35131-EEVB/LJM/98.05 Mr. Ronald M. Scroggins, Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No. STN 50-529 (License NPF-46)

January Monthly Operating Report File: 86-024-404

Dear Mr. Scroggins:

Attached please find the January,. 1986, Monthly Operating Report prepared and sub-mitted pursuant' to Specification 6.9.1.6 of Appendix A (Technical Specifications) i to the Palo Verde Nuclear Generating Station, Unit 2 Operating License. By copy of this letter, we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.

If you have any questions, please contact me, l

i Very truly yours, k

(*

'inu E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/LJM/rw Attachments cc:

J. B. Martin (all w/a)

R. P. Zimmerman E. A. Licitra A. C. Gehr INPO Records Center S

5 l