ML20141H386

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1986
ML20141H386
Person / Time
Site: Cooper 
Issue date: 01/31/1986
From: Horn G, Salisbury J
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
CNSS860106, NUDOCS 8604240316
Download: ML20141H386 (5)


Text

_

I l

OPERATING DATA REPORT l

DOCKET NO.

50-298 DATE 2-7-86 COMPLETED BY J.K. Salisbury TELEPHONE (402)825-3811 i

OPERATING STATUS

1. Unit Name:

Cooper Nuclear Station Notes

2. Reporting Period: January, 1986

)

3. Licensed Thermal Power (MWt):

2381

(

4. Nameplate Rating (Gross MWe):

836

5. Design Electrical Rating (Net MWe):

778 787 6 Maximum Dependable Capacity (Gross MWe):

764

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since 1.ast Report. Give Reasons:

1 l

9. Power Level To which Restricted. lf Any (Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr to-Date Cumulative

11. Hours in Reporting Period 744.0 744.0 101,593.0
12. Number Of Hours Reactor Was Critical 744.0 744.0 75,757.I
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On Line 744.0 744.0 74,449.8
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,737,432.0 1,737.432.0 146,600,098.0
17. Gross E'ectrical Energy Generated (MWH) 588,493.0 588,493.0 46,728,466.0
18. Net Electrical Energy Generated (MWH) 566,365.0 566,365.0 45,020,725.0 i
19. Unit Senice Factor 100.0 100.0 73.3
20. Unit Availability Factor 100.0 100.0 73.3
21. Unit Capacity Factor (Usinh MDC Net) 99.6 99.6 58.0
22. Unit Capacity Factor (Using DER Net) 97.8 97.8 57.0
23. Unit Forced Outage Rate 0.0 0.0 4.9

' 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each t:

25. If Shur Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation,:

Forecast Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMM ERCIAL OPERATION

[

4240316 860131 R

ADOCK 05000298 f

(o/77:

PDR

/

v AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-298 LWIT CNS 2-7-86 DATE COMPLETED BY J.K. Salisbury (402)825-3811 TELEPHONE MONTH Jam ary, 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(Mwe-Net) 783 746 g

37 2

783 g3 754 3

783 39 756 4

780 20 778 i

5 21 781 782 6

22 780 l

782 7

781 781 23 g

780 24 782 9

779 25 781 778 10 26 783 11 778 27 783 558 783 12 23 739 13 29 782 14 776 30 789 776 15 3l 781 16 782 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) t

=

50-298 DOCKET NO.

UNITS!!U1 DOWNS AND POWER REDUCTIONS UNIT NAME CNS DATE 2-7-86 COMPLETED HY J.K.

Salisbury REPORT MON 111 January, 1986 (402)825-3811 gtrPilONE c

.! E 3

y5'3 Licensce

,E g j"3 C1use & Corrective No.

Date g

3g i*

.3 g 5 Event 3,7 Action to go y

5 5 ;g =;!

Report a mU Prevent Recurrence H

o o

d a'

i i

(None durin ; this (eporting Period) 6 t

i 1

2 1

3 4

F: Forced Reasorl:

Method:

E4hibit G Instructions S: Scheduled A Equipment Failure (Explain) l-Manual for, Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report (LER) File (NURI.G-l D Reg 6htory Restriction 4 Other (Explain) 01611 4

E-Operator Training & License Examination F-Administrative

^

5 G-Operational Error (Explain)

Exhibit I - Same Source 49/77) 1101her (Explain) e

Operations Narrative Cooper Nuclear Station January, 1986 The plant operated through the month of January with no scheduled or unscheduled shutdowns or power reductions. A capacity factor of 99.6% was achieved for the month of January.

i I

I

h

~

Nebraska Public Power Distritt

' " 55355$5355f^ "

h4 CNSS860106 Februsry 7, 1986 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Monthly Operation Status Report for January 1986 Docket No. 50-298 Gentlemen:

Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for January 1986. The report includes Operating Status Average Daily Unit Power Level, Unit Shutdown Data, and a Narrative Summary of Operating Experience.

Should you have any comments or require additional information regarding this report, please contact pe.

Sincerely,

/

C G.

Horn Div ion Manager of Nuclear Operations GRH:lb Enclosure cc:

G. D. Watson w/ enc.

A. C. Gehr w/ene.

R. D. Martin w/ enc.

d N,

l '

l

.