ML20141G480
| ML20141G480 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/20/1997 |
| From: | Chandu Patel NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20141G483 | List: |
| References | |
| NUDOCS 9705220372 | |
| Download: ML20141G480 (3) | |
Text
_
p**E10 g
t UNITED STATES 3
j NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 30886-0001
\\...../
ENTERGY OPERATIONS. INC.
DOCKET NO. 50-382 WATERFORD STEAM ELECTRIC STATION. UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.128 License No. NPF-38 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Entergy Operations, Inc. (the licensee) dated August 21, 1996, as supplemented by letter dated March 17, 1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; i
4 B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the i
Commission; l
C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
' ~
9705220372 970520 PDR ADOCK 05000382 tyav h v v,
(
, =,,
2.
Accordingly, the license is amended by revising Attachment 1 of Facili*.y Operating License No. NFF-38.
3.
This license amendment is effective as of its date of issuance to be implemented within 90 days.
l FOR THE NUCLEAR REGULATORY COMISSION hM
[' N Chandu P. Patel, Project Nanager Project Directorate IV-I Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
Attachment I of the Operating License Date of Issuance: May 20. 1997 1
i 4
i l
ATTACHMENT I WATERFORD STEAM ELECTRIC STATION OPERATING LICENSE NPF-38 This attachment identifies items which must be completed to the Commission's satisfaction prior to startup following the refueling outage number 8.
i Non-essential Containment Vacuum Relief Sensing Lines:
Penetration 65 will be modified to reflect a Containment Leak Rate Test connection as indicated in licensee submittal dated August 21, 1996 (Attachment C page 4 of 4).
Penetration 53 will be modified such that two automatic containment usolation valves will be located nutside containment with continuous direct position indication in the control room as indicated in licensee j
submittal dated August 21, 1996 (Attachment C page 4 of 4).
1 3
)
AMENDMENT NO. 128