Text
-
l E114 ~ I*
COOPER NUCLEAR STATION' Eo N.
TABLE 4.2.B (Page 2)
~
N $
RHR SYSTEM TEST & CALIBRATION FREQUENCIES o
3 79 re
- [ 8
=0 4
'F4,.
Instrument 3l$
Item Item I.D. No.
Functional Test Frea.
Calibration Frea.
Check 04
$o~ h
+
,.'j Instrumentation 3
9e a of n.
E g
1.
Drywell High Pressure PC-PS-101, A, B, C & D Once/ Month (1)
Once/3 Months None 2.
Reactor Low Water 14 vel NBI-LIS-72, A, B, C & D fl Once/ Month (1)
Once/3 Months Once/ Day GJ
.d c.
3.
Reactor Vessel Shroud Level NBI-LITS-73, A & B (1 Once/ Month (1)
Once/3 Months Once/ Day 7 a ej 4.
Reactor Low Pressure RR-PS-128 A & B Once/ Month (1)
Once/3 Months None 5.
Reactor Low Pressure NBI-PS-52 A1,A2,C1, & C2 Once/ Month (1)
Once/3 Months None
~,<
NEI-PIS-52 B~& D 6.
Drywell Press.-Containment PC-PS-119, A,B,C & D Once/ Month (1)
Once/3 Months None Spray 7.
RHR Pump Discharge Press.
RHR-PS-120, A,B,C & D Once/ Month (1)
Once/3 Months
.None 8.
RHR Pump. Discharge Press.
RHR-PS-105, A,B,C & D Once/ Month (1)
Once/3 Months None-9.
RHR Pump Iow Flow Switch RHR-dPIS-125 A & B Once/ Month (1)
Once 3 Months None 10.
RHR Pump Start Time Delay RHR-TDR-K70, A & B Once/ Month (1)
Once/Oper. Cycle None 11.
RHR Injection Valve Close T.D.
RHR-TDR-K45 1A & IB Jnce/ Month (1)
Once/Oper. Cycle 'None 12.
RHR Pump Start Time Delay RHR-TDR-K75, A & B Once/ Month (1)
Once/Oper. Cycle None 13.
RHR Heat Exchanger Bypass T.D.
RHR-TDR-K93, A & B Once/ Month (1)
Once/Oper. Cycle None i
14 RHR Cross Tie Valve Position RHR-IMS-8 Once/ Cycle (1)
N.A.
15.
Low Voltage Relays 27 x 2/1F, 27 X 2/1G (7)
None i
16.
Iow Voltage Relays 27 X 1/1F, 27 X 1/1G (7)
None 17.
Pumo Disch. Line Press. Low CM-PS-266, CM-PS-270 Once/3 Months Once/3 Months None 18.
Emergency buses Undervoltage 27/1F-2, 27/1FA-2, 27/1G-2, Once/ Month once/18 Months Once/12 hrs.
)
Relays (Degraded Voltage) 27/1GB-2 T
2 19.
Emergency Buses Loss of 27/1F-1, 27/1FA-1, 27/1G-1, Once/ Month Once/18 Months once/12 hrs.
voltage Relays 27/1CB-1, 27/ET-1, 27/ET-2 9
20.
Emergency Buses Undervoltage 27X7/1F, 27X7/1G Once/ Month Once/18 Months None 7
Relays Timers t
O a
5 N
1
-