ML20141G214
| ML20141G214 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 01/06/1986 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Fay C WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20141G220 | List: |
| References | |
| NUDOCS 8601100033 | |
| Download: ML20141G214 (2) | |
See also: IR 05000266/1985023
Text
.
.
JAN 0 6 886
Docket No. 50-266
Docket No. 50-301
Wisconsin Electric Power Company
ATTN: Mr. C. W. Fay
Vice President
Nuclear Power Department
231 West Michigan, Room 308
Milwaukee, WI 53201
Gentlemen:
This refers to the routine safety inspection conducted by Mr. L. J. Hueter
of this office on December 9-12, 1985, of activities at Point Beach authorized
by NRC Operating Licenses No. DPR 24 and DPR 27, and to the discussion of our
findings with Mr. J. Zack and other onsite staff members at the conclusion of
the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In your letter of February 28, 1985, submitted in response to our Notice of
Violation dated January 11, 1985, you disagreed with our violation of
Technical Specification requirements concerning radiation system monitor
calibrations.
After further consideration, we agree that using one point
calibrations for liquid and gaseous effluent monitors did not violate Technical
Specification 15.4.1 requirements, as stated in the Notice of Violation.
1herefore, the violation is rescinded.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
T' GQlp
,L
hj
B601100033 060106
ADOCK 05000266
G
,
-
- -
--
L
,
Wisconsin Electric Power Company
2 J AN 0 61986
We will gladly discuss any questions you have cor.cerning this inspection.
Sincerely,
/
.
W. D. Shafer, Chief
Radiological Protection Branch
Enclosure:
Inspection Reports
No. 50-266/85023(DRSS);
No. 50-301/85022(DRSS)
cc w/ enclosure:
J. J. Zach, Plant Manager
DCS/R$8 (RIDS)
,
Licensing Fee Management Branch
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Section
Ness Flores, Chairperson
Wisconsin Public Service
Commission
(
A
RII
RJg,
RIII,,
)
Toten
schem.cae..
af,af.
shair
0
r
- - - -