ML20141F750

From kanterella
Jump to navigation Jump to search
Submits Initial Estimate of Addl Staff Costs Induced by Davis-Besse Incident.Data Provided on ofc-by-ofc Basis. Complete Rept Expected by 860411
ML20141F750
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/01/1986
From: Hiller L
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
To: Fitti C
NRC
Shared Package
ML20141F729 List:
References
NUDOCS 8604230150
Download: ML20141F750 (19)


Text

~ ~ - - - ~ - - --

. _ ._ ~. .

Attachment 1 g*'* -

3 l  !

April 1, 1986 g6N 7 /

I MEMORANDUM FOR: Charles J. Fitti, Administrative Officer

' Ad Hoc Independent Davis-Besse Review Group FROM: Lee Hiller, Deputy Director Office of Resource Management

SUBJECT:

REQUEST FOR DAVIS-BESSE INDUCED COSTS The purpose of this memo is to provide you with RM's initial (interim) estimate of additional staff costs induced by the Davis-Besse incident (see attachment). The data provided on an office-by-office basis, results from preliminary costs and staff hours provided by NRC offices in the time initially allocated to us. Additional analysis will be necessary to provide a more comprehensive estimate of the resources that were required by the Ad Hoc Independent Review Group in order to perform their charter. i

\

We anticipate that our analysis will be completed and a written report - I available by April 11, 1986. If there are any questions, please contact Ronald V. Villafranco, X27251.

Original signed by:

Lee Hiller Lee Hiller, Deputy Director Office of Resource Management

Attachment:

As stated j 8604230150 860411 PDR ADOCK 05000346 R pnp

--____n _

INITIAL (INTERIM) ESTIMATE OF DAVIS-BESSE INDUCED COSTS STAFF HOURS LABOR 1/ OTHER El NRC 0FFICE Regular Overtime Total COSTS COSTS AE0D 2454 701 3155 $195.610 -

RES - - - 2/ $40,000

- - - SI S/

ACRS

- - S/ S/

NMSS -

ELD 160 - 160 9,920 980 1,080 91 1,171 62,063 S/

IE NRR 6,792 441 7,234 448,508 199,566 REGION III 9,912 2,205 12,116 642,148 84,181 Estimated cost 20,398 3,438 23,836 $1,358,249 $324,727 using initial data provided by NRC offices Total = $1,682,976 1/ abor L costs calculated based on license fee rates (I&E and Regions at

$53/hr all others at $62/hr).

S/ ollar D costs include both travel and program support funds.

2/ oN labor costs for Research.

$/ ost C not available; to be determined.

,= ..

-ca ...

Attachment 2 -

PAGE 1 U. S. NUCLEAR REGULATORY COMMISSION 03/25/86 REGULATORY INFORMATION TRACKING SYSTEM - MANPOWER REPORT 1 - EFFORT BY OFFICE ON DAVIS BESSE PLANT ACTIVITY F ROM. T.H.E. 06. /.09. /. 85. .I. N.C. I.D. E. N. T. . T. H. R.O. U.G. H. 0 3. /. 01/ 8 6

  • R.

... E. P. O. R. T. . C. O. N. T A. I N. S.. . U. N. E. D. I. T. E.D. .D. A. T. A. . *.

  • DAVIS-BESSE INCIDENT RELATED

.-------------ACTIVITY ..---------------------------------------- ......---------------

OVERTIME TOTAL


ACT NAME REGULAR HOURS HOURS HOURS CODE I&E 50.0 2.0 52.0 HLE ESCALATED ENFORCEMENT 18.0 ACT-CODE TOTAL ElR EVENT INCIDENT RESPONSE 18.0 .0 ACT-CODE TOTAL 16.0 .0 16.0 10R INSPECTION OTHER ROUTINE 4.0 ACT-CODE TOTAL LRA LICENSING REACTORS ACTIVITIES 4.0 .0 ACT-CODE TOTAL 6.0 .0 6.0 ENF NORMAL ENFORCEMENT 161.0 ACT-CODE TOTAL DR1 REACTIVE DOCUMENTATION 153.0 8.0 ACT-CODE TOTAL 497.0 54.0 551.0 ACT-CODE TOTAL PRI REACTIVE ONSITE/OFFISTE INSPECTION 86.0 7.0 93.0 ACT-CODE TOTAL PP1 ROUTINE INSPECTION 73.0 .0 73.0 PAP ROUTINE PREPARATION 41.0 ACT-CODE TOTAL STF SUPPORT FOR PROBLEM FACILITY 41.0 .0 ACT-CODE TOTAL 4.0 .0 4.0 ACT-CODE TOTAL SSS SUPPORT OF SPECIAL STUDIES 84.0 0 84.0 ACT-CODE TOTAL SRO SUPPORT TO REGIONAL OFFICES 48.0 20.0 68.0 ACT-CODE TOTAL ATV TRAVEL 1,080.0 91.0 1.171.0 OFFICE TOTAL NRR NOT RELATED TO AN ACTIVITY CODE 54.0 .0 54.0 ACT-CODE TOTAL 6,738.5 441.5 7,180.0 ACT-CODE TOTAL NRR NRR TAC-RELATED ACTIVITY 6,792.5 441.5 7,234.0 OFFICE TOTAL REGION 3

.5 .0 .5 ACT-CODE TOTAL J0M ADMINISTRATIVE SUPPORT 8.1 .0 8.1 ACT-CODE TOTAL BJ1 ALLEGATION FOLLOW-UP - INSPECTION 22.4 1.0 23.4 ACT-CODE TOTAL BJ2 ALLEGATION FOLLOW-UP - PREP / DOC 3.0 .0 3.0 ACT-CODE TOTAL JA0 COMMISSION INFO REQUESTS .0 21.0 JC0 CONGRESSIONAL INFO REQUESTS 21.0 ACT-CODE TOTAL 28.0 4.0 32.0 ACT-CODE TOTAL BD1 EMERGENCY RESPONSE SUPPORT ACTIVITIES 5.0 .0 5.0 ACT-CODE TOTAL BA3 ENFORCEMENT COORDINATOR 44.5 .0 44.5 ACT-CODE TOTAL BC EP LICENSING REVIEWS 412.0 111.5 523.5 ACT-CODE TOTAL BA2 ESCALATED ENFORCEMENT ACTIVITIES 130.0 8.0 138.0 ACT-CODE TOTAL AID INDEPENDENT DOCUMENTATION 439.2 24.5 463.7 ACT-CODE TOTAL AII INDEPENDENT ON-SITE /OFF-SITE INSPECTION 35.0 .0 35.0 ACT-CODE TOTAL AIP INDEPENDENT PREPARATION 598.3 1,284.8 AT INSPECTION-RELATED TRAVEL 686.5 ACT-CODE TOTAL 106.0 .0 106.0 ACT-CODE TOTAL NMS NMSS RELATED ACTIVITIES

.f= ...

9 PAGE 2 U. S. NUCLEAR REGULATORY COMMISSION 03/25/86 REGULATORY INFORMATION TRACKING SYSTEM - MANPOWER REPORT 1 - EFFORT BY OFFICE ON DAVIS BESSE PLANT ACTIVITY .

F R OM. T. H. E. 06. /. 09. /. 85. .I. N.C. ID. E. N. T. . T. H. R. O. U.G. H. 0 3. /. 01/ 8 6

  • R.E. P.O. R. T. .C.O. .N. T. A. I.N. S. .U.N. E.D. I T. E.D. .D. A. T. A. .
  • a .

DAVIS-BESSE INCIDENT RELATED -................................

NAME HOURS HOURS HOURS CODE

.o REGION 3 110.5 45.0 155.5 BA1 NORMAL ENFO3 CEMENT ACTIVITIES 36.0 7.5 43.5 ACT-CODE TOTAL NOT RELATED TO AN ACTIVITY CODE 57.0 1.0 58.0 ACT-CODE TOTAL NRR NRR TAC-RELATED ACTIVITY 33.0 .0 33.0 ACT-CODE TOTAL BH QUALITY ASSURANCE REVIEWS 483.5 43.0 526.5 4 ACT-CODE TOTAL ARD REACTIVE DOCUMENTATION 179.0 2.5 181.5 ACT-CODE TOTAL ARP REACTIVE INSPECTION PREPAKATION 2,025.9 528.3 2,554.2 ACT-CODE TOTAL ARI REACTIVE ON-SITE /OFF. SITE INSPECTION 636.0 178.0 814.0 ACT-CODE TOTAL BD2 RESPONSE TO EVENTS / INCIDENTS 644.0 63.0 707.0 ACT-CODE TOTAL APD ROUTINE DOCUMENTATION 298.3 6.0 304.3 ACT-CODE TOTAL APP ROUTINE INSPECTION PREPARATICN 3,345.6 569.2 3,914.8 ACT-CODE TOTAL API ROUTINE OH-SITE /OFF. SITE INSPECTION 34.6 8.0 42.6 ACT-CODE TOTAL BB SALP 87.0 6.0 93.0 ACV-CODE TOTAL BE TECHNICAL SUPPORT FOR INVESTIGATIONS 9,911.6 2,204.8 12,116.4 ACT-CODE TOTAL 17,784.1 2,737.3 20,521.4 i OFFICE TOTAL DBESSE TOTAL

_ ,_ _ - _ _ . m ,_. _. _ ._. _ . _ _ . _ _ ___ _ _ . , - _

.= , ,

I l

r

~

U. S. NUCLEAR REGULATORY COMMISSION PAGE 3 03/25/86 REGULATORY INFORMATION TRACKING SYSTEM . MANPf*4ER REPORT 1 - EFFORT BY OFFICE ON DAVIS BESSE PLANI ACTIVITY -

F ROM. T. H. E. 06. /.. 0. 9. /. 8. 5. .I N. C. ID. E. N. T . T. H. R. O. U. G. H. .03./.01/86

. . . R. E. P. O. R. T. .C. O. N. T. A. I. N. S. .U. N. E.D. I. T. E.D. .D. A. T. A. . *. *. .

DAVIS-BESSE OTHER ACTIVITY ACT ACTIVITY REGULAR OVERTIME TOTAL HOURS CODE NAME HOURS HOURS NRR NOT RELATED TO AN ACTIVITY CODE 564.0 8.0 572.0 ACV-CODE TOTAL 1.297.1 20.0 1.317.1 NRR NRR TAC-RELATED ACTIVITY ACT-CODE TOTAL 1,861.1 28.0 1.889.1 OFFICE TOTAL 1.861.1 28.0 1.889.1 i DBESSE TOTAL I

Eauppsh- .

-c. ..

PAGE 4 U. S. NUCLEAR REGULATORY COMMISSION 03/25/86 REGULATORY INFORMATION TRACKING SYSTEM - MANPOWER ,

REPORT 1 - EFFORT BY OFFICE ON DAVIS BESSE PLANT ACTIVITY

  • FROM.THE eeeee neen eeeeeeen seeeeen 06/09/85..INCIDE.NT ee TH. ROUGH 03/.01/86

... R. E. P. O..R.

. T. .C. O. N T A. I N. S. . U. N. E.D. I. T. E.D. .D. A. T. A. . *. *.

___________________________________________________ REGULAR OVERTIME TOTAL

____________________________________________ACT ACTIVITY HOURS HOURS HOURS CODE NAME ___________________________

= s. .

l U. S. NUCLEAR REGULATORY COMMISSION PAGE 1 03/25/86 REGULATORY INFORMATION TRACKING SYSTEM - MANPOWER -

a REPORT 2 - EFFORT BY ACTIVITY ON DAVIS BESSE PLANT -

F R OM. T. H. E. 06. /. 09. /. 8. 5.. .I N. C. ID. E. N. T. . T. H. R. O. U. G. H. 0 3. /. 0,1/ 8 6
*
  • R.

... E. P. O. R. T. .. C. O. N. .T A. I N. S. . U.. N. E.D. .I T. E. D. .D. A. T. A. . *. * .

DAVIS-BESSE INCIDENT RELATED NRC REGULAR OVERTIME TOTAL OFFICE HOURS HOURS HOURS J0M ADMINISTRATIVE SUPPORT OFFICE TOTAL REGION 3 5 .0 .5 ACT-CODE TOTAL .5 .0 .5 BJ1 ALLEGATION FOLLOW-UP - INSPECTION I

OFFICE TOTAL REGION 3 8.1 0 8.1 ACT-CODE TOTAL 8.1 .0 8.1 l BJ2 ALLEGATION FOLLOW-UP - PREP / DOC i

OFFICE TOTAL REGION 3 22.4 1.0 23.4 ACT-CODE TOTAL 22.4 1.0 23.4 JA0 COMMISSION INFO REQUESTS OFFICE TOTAL REGION 3 3.0 .0 3.0 ACT-CODE TOTAL 3.0 .0 3.0 JC0 CONGRESSIONAL INFO REQUESTS OFFICE TOTAL REGION 3 21.0 .0 21.0 ACT-CODE TOTAL 21.0 .0 21.0

- BD1 EMERGENCY RESPONSE SUPPORT ACTIVITIES OFFICE TOTAL REGION 3 28.0 4.0 32.0 ACT-CODE TOTAL 28.0 4.0 32.0 BA3 ENFORCEMENT COORDINATOR OFFICE TOTAL REGION 3 5.0 .0 5.0 ACT-CODE TOTAL 5.0 .0 5.0 BC EP LICENSING REVIEWS OFFICE TOTAL REGION 3 44.5 .0 44.5 ACT-CODE TOTAL 44.5 .0 44.5

< o ,

= ... .

03/25/86 U. S. NUCLEAR REGULATORY COMMISSION PAGE 2 REGULATORY INFORMATION TRACKING SYSTEM - MANPOWER ,

REPORT 2 - EFFORT BY ACTIVITY ON DAVIS BESSE PLANT

  • F R OM. T. H. E. .06../..0 9. /. 8 5. .I . N. C. .I D. E. N. T . T. H. R. O. U. G. H. .03./.01/86
  • R.

... E. P. .O. R. T .C.O. . N. T. A. . I N. S. . U. N. ..E.D. I T. E.D. .D. A. T. A. . * * .

DAVIS-BESSE INCIDENT RELATED NRC REGULAR OVERTIME TOTAL OFFICE HOURS HOURS HOURS HLE ESCALATED ENFORCEMENT OFFTCE TOTAL I&E 50.0 2.0 52.0 ACT-CODE TOTAL 50.0 2.0 52.0 BA2 ESCALATED ENFORCEMENT ACTIVITIES OFFICE TOTAL REGION 3 412.0 111.5 523.5 ACT-CODE TOTAL 412.0 111.5 523.5 ElR EVENT INCIDENT RESPONSE OFFfCE TOTAL I&E 18.0 .0 18.0 ACT-CODE TOTAL 18.0 .0 18.0 AID INDEPENDENT DOCUMENTATION OFFfCE TOTAL REGION 3 130.0 8.0 138.0 ACT-CODE TOTAL 130.0 8.0 138.0 AII INDEPENDENT ON-SITE /OFF-SITE INSPECTION OFFICE TOTAL REGION 3 439.2 24.5 463.7 ACT-CODE TOTAL 439.2 24.5 463.7 AIP INDEPENDENT PREPARATION OFFICE TOTAL REGION 3 35.0 .0 35.0 ACV-CODE TOTAL 35.0 .0 35.0 10R INSPECTION OTHER ROUTINE OFFfCE TOTAL I&E 16.0 .0 16.0 ACT-CODE TOTAL 16.0 .0 16.0 l

AT INSPECTION-RELATED TRAVEL i OFFfCE TOTAL REGION 3 686.5 598.3 1.284.8 l ACT-CODE TOTAt 686.5 598.3 1.284.8

.~ .

U. S. NUCLEAR REGULATORY COMMISSION PAGE 3 03/25/86 REGULATORY INFORMATION TRACKING SYSTEM - MANPOWER

  • REPORT 2 - EFFORT BY ACTIVITY ON DAVIS BESSE PLANT
  • F R OM T. H. E. 06. . /. 09. ./. 8 5. .I. N. C. ID. E. N. T. . T. H. R. O. U.G. H. 0 3. /. 01/ 8 6 1
  • R.

... E. P. O. R. T.. . C. O. N. T. A. I N. S. . .U. N. E.D. I. T. E.D. .D. A. T. A. . *. * .

DAVIS-BESSE INCIDENT RELATED NRC REGULAR OVERTIME TOTAL OFFICE HOURS HOURS HOURS LRA LICENSING REACTORS ACTIVITIES OFFICE TOTAL I&E 4.0 0 4.0 ACT-CODE TOTAL 4.0 .0 4.0 NHS NMSS RELATED ACTIVITIES OFFICE TOTAL REGION 3 106.0 .0 106.0 ACT-CODE TOTAL 106.0 .0 106.0 ENF NORMAL ENFORCEMENT OFFICE TOTAL I&E 6.0 .0 6.0 ACT-CODE TOTAL 6.0 .0 6.0 BA1 NORMAL ENFORCEMENT ACTIVITIES OFFICE TOTAL REGION 3 110.5 45.0 155.5 ACT-CODE TOTAL 110.5 45.0 155.5 NOT RELATED TO AN ACTIVITY CODE OFFICE TOTAL NRR 54.0 .0 54.0 OFFICE TOTAL REGION 3 36.0 7.5 43.5 ACT-CODE TOTAL 90.0 7.5 97.5 NRR NRR TAC-RELATED ACTIVITY OFFICE TOTAL NRR 6,738.5 441.5 7,180.0 OFFICE TOTAL REGION 3 57.0 1.0 58.0 ACT-CODE TOTAL 6,795.5 442.5 7,238.0 BH QUALITY ASSURANCE REVIEWS OFFICE TOTAL REGION 3 33.0 .0 33.0 ACT-CODE TOTAL 33.0 .0 33.0

.;~ ... .

e 03/35/86 U. S. NUCLEAR REGULATORY COMMISSION PAGE 4 REGULATORY INFORMATION TRACKING SYSTEM - MANPOWER REPORT 2 - EFFORT BY ACTIVITY ON DAVIS BESSE PLANT -

l

. F R OM.. T H. E. 06. ./. 0 9. /. .8 5. . .I N.C. ID. E. N. T. . T. H. R. O. U. G. H. 0 3. /. 01/ 8 6 aa

( . . . R. E. P. . O. R. T.. C. O. N. .T. A. I N. S. . U. N. E. D. I T. E. D. .D. A. T. A. . *. *. .

DAVIS-BESSE INCIDENT RELATED OFFICE HOURS HOURS HOURS DR1 REACTIVE DOCUMENTATION OFFICE TOTAL I&E 153.0 8.0 161.0 ACT-CODE TOTAL 153.0 8.0 161.0 ARD REACTIVE DOCUMENTATION OFFICE TOTAL REGION 3 483.5 43.0 526.5 ACT-CODE TOTAL 483.5 43.0 526.5 j

l ARP REACTIVE INSPECTION PREPARATION l OFFICE TOTAL REGION 3 179.0 2.5 181.5 l ACT-CODE TOTAL 179.0 2.5 181.5 ARI REACTIVE ON-SITE /OFF-SITE INSPECTION OFF8CE TOTAL REGION 3 2.025.9 528.3 2.554.2 ACT-CODE TOTAL 2.025.9 528.3 2.554.2

, PRI REACTIVE ONSITE/OFFISTE INSPECTION l OFFICE TOTAL ISE 497.0 54.0 551.0 l ACT-CODE TOTAL 497.0 54.0 551.0 BD2 RESPONSE TO EVENTS / INCIDENTS OFFICE TOTAL REGION 3 636.0 178.0 814.0 ACT-CODE TOTAL 636.0 178.0 814.0 APD ROUTINE DOCUMENTATION OFFICE TOTAL REGION 3 644.0 63.0 707.0 ACT-CODE TOTAL 644.0 63.0 707.0 l

PP1 ROUTINE INSPECTION OFFTCE TOTAL I&E 86.0 7.0 93.0 ACT-CODE TOTAL 86.0 7.0 93.0 l

.N ,

PAGE 5 U. S. NUCLEAR REGULATORY COMMISSION -

03/25/86 REGULATORY INFORMATION TRACKING SYSTEM . MANPOWE .

F R OM. T.H.E. 06. /.09. /. 8 5. .I.N.C. I.D.E.N. T. .T.H.R.O.U.G. H. 0 3. /. 01/ 8 6

. . . R. E. P.O. R. T. .C.O.N. T. A. I. N. S. .U.N.E.D. I. T. E.D. .D. A. T. A. . *. *.

DAVIS-BESSE INCIDENT RELATED ... .. ............._.............

TOTAL NRC OFFICE REGULAR HOURS _...............................................................

OVERTIME HOURS HOURS APP ROUTINE INSPECTION PREPARATION 6.0 304.3 REGION 3 298.3 6.0 304.3 TOTAL 298.3 OFFICE ACV-CODE TOTAL API ROUTINE ON. SITE /OFF. SITE INSPECTION 569.2 3,914.8 3,345.6 3,914.8 REGION 3 3,345.6 569.2 OFFT*F TOTAL AC1-cOOE TOTAL PAP ROUTINE PREPARATION .0 73.0 73.0 73.0 I&E 73.0 0 OFFICE TOTAL ACT-CODE TOTAL BB SALP 8.0 42.6 REGION 3 34.6 8.0 42.6 ' ' '

TOTAL 34.6 OFFICE ACT-CODE TOTAL STF SUPPORT FOR PROBLEM FACILITY 0 41.0 41.0 41.0 I&E 41.0 .0 OFFICE TOTAL ACT-CODE TOTAL SSS SUPPORT OF SPECIAL STUDIES .0 4.0 4.0 4.0 I&E 4.0 0 OFFICE TOTAL ACT-CODE TOTAL SRO SUPPORT TO REGIONAL OFFICES 84.0 0 34.0 I&E .0 84.0 TOTAL 84.0 OFFICE OCT-CODE TOTAL SE TECHNICAL SUPPORT FOR INVESTIGATIONS 6.0 93.0 87.0 93.0 REGION 3 87.0 6.0 OFFICE TOTAL ACT-CODE TOTAL

03/25/86 U. S. NUCLEAR REGULATONY COMMISSION PAGE 6 .

REGULATORY INFORMATION TRACKING SYSTEM - MANPOWER

' REPORT 2 - EFFORT BY ACTIVITY ON DAVIS BESSE PLANT F R OM. T. H. E. 06. /. 09. /. .8 5. .I. N.C. ID. E. N. .T . T. H. R. O. U. G. H. .03./.01/86 ,

  • R.

... E. P.O. R. T. .C.O.

. N. T. A. I N. S. .U. NE.D.

e .I T E. D. .D. A. T A n *.

  • DAVIS-BESSE INCIDENT RELATED NRC . REGULAR OVERTIME TOTAL OFFICE HOURS HOURS HOURS ATV TRAVEL OFFICE TOTAL I&E 48.0 20.0 68.0 ACV-CODE TOTAL 48.0 20.0 68.0 DBESSE TOTAL 17,784.1 2,737.3 20,521.4 1

3 4

L . E .

t 03/25/86 U. S. NUCLE AR REGULATORY Cope 4ISSION PAGE 7 -

REGULATCRY INFORMATION TRACKING SYSTEM - MANPOWER i

REPORT 2 - EFFORT BY ACTIVITY ON DAVIS BESSE PLANT F ROM. T. H. E. 06. /. 09. . /. 8 5. .I. N. C. .I D. E. N. T . T. H. R. O. U. G. H. .03./.01/86 .

. . . R. E. P. O. R. T...C. O. N. T. A. I N. S. . U. . N. E.D. .I T. E.D. .D. A. T. A. . * *.

DAVIS-BESSE OTHER ACTIVITY NRC REGULAR OVERTIME TOTAL OFFICE HOURS HOURS HOURS NOT RELATED TO AN ACTIVITY CODE OFFICE TOTAL NRR 564.0 8.0 572.0 ACT-CODE TOTAL 564.0 8.0 572.0 NRR NRR TAC-RELATr', ACTIVITY OFFICE TOTAL hRR 1,297.1 20.0 1,317.1 ACT-CODE TOTAL 1,297.1 20.0 1,317.1 DBESSE TOTAL 1,861.1 28.0 1,889.1 l

l l

o *

.:=. ...

03/25/86 U. S. NUCLEAR REGULATORY COP 99ISSION PAGE 8

  • REGULATORY INFORMATION TRACKING SYSTEM - MANPOWER REPORT 2 - EFFORT BY ACTIVITY ON DAVIS BESSE PLANT F ROM. T. H. E. 06../..0 9. /. 8 5. .I

. N. C. .I D. E. N. T . T. H. R. O. U. G. H. 03. /. 01/ 8 6 .

    • REPORT CONTAINS UNEDITED DATA en semanamenessannessenamaanneenseene.

NRC REGULAR OVERTIME TOTAL OFFICE HOURS HOURS HOURS GRAND TOTAL - 19,645.2 2,765.3 22,410.5

03/25/86 NUCLEAR REGULATORY COMMISSION PAGE 1 OFFICE OF NUCLEAR REACTOR REGULATION FY85 - TRAVEL TO DAVIS-BESSE SINCE 6/9/85 050-00346 DAVIS-BESSE 1

  • AUTH NAME OF DEST DEP RET OBS TRIP ST
  • NO TRAVELER DATE DATE TOTAL 57480 BEARD OAK HARBOR 0708 0713 730 567.24 PD 58655 BEARD OAK HARSOR 0827 0828 375 56989 BLUMER OAK HARBOR 0618 0620 0 CA 3810 L BLUMER OAK HARBOR 0923 0926 490

/gg (51084) BUTLER GLEN ELYN 1107 1108 375 417.87 PD 59084 CWALINA OAK HARBOR 0918 0920 420 56872 DE AGAZIO OAK HARBOR 0609 0614 0 CA 56925 DE AGAZIO GLEN ELLYN 0626 0626 0 CA 56992 DE AGAZIO OAK HARBOR 0618 0620 0 CA 57845 DE AGAZIO OAK HARBOR 0724 0725 425 -

58737 DE AGAZIO OAK HARBOR 0827 0828 430 1 5255g8 DEAGAZIO DEAGAZIO GLEN ELYN GLEN ELYN 1107 1210 1108 1210 410 0

381.86 PD CA D711 DEAGAZIO OAK HARBOR 0923 0926 0 CA 59027 DENTON OAK HARBOR 0909 0909 225 12.97 PD 59140 DICK PT CLINTON 0915 0920 680 57725 DUNNING OAK HARBOR 0714 0720 820 438.70 PD 58570 DUNNING CAK HARBOR 0820 0822 545 58736 EDISON OAK HARBOR 0827 0828 380 59057 EDISON OAK HARBOR 0909 0909 215 59339 EL-BASSIONI OAK HARBOR 0923 0924 380 59353 KNIGHT OAK HARBOR 0922 0925 400 59396 MCCRACKEN OAK HARBOR 0924 0925 335 59030 MIRAGLIA OAK HARBOR 0909 0909 215 17.04 PD 58801 MORISSEAU OAK HARBOR 0923 0926 490 58602 PAULSON OTTAWA CTY 0827 0828 375 305.91 PD 58939 PERSINKO OAK HARBOR 0915 0920 655 59352 RIDGELY OAK HARBOR 0922 0925 340 59372 ROSA OAK HARBOR 0924 0927 390 238 ROWSOME OAK HARBOR 0923 0924 325 ff@[ Q&5) STOLZ GLEN ELYN 1107 1108 375 266.18 PD 557 STOLZ GLEN ELYN 1210 1210 0 CA 56994 STOLZ OAK HARBOR 0618 0620 0 CA 57846 STOLZ OAK HARBOR 0724 0725 0 CA 59340 VANDER MOLEN OAK HARBOR 0923 0924 430 58654 WESSMAN OAK HARBOR 0827 0828 0 CA

e erm. e .,_

e 03/25/86 NUCLEAR REGULATORY COMMISSION PAGE 1 OFFICE OF NUCLEAR REACTOR REGULATION FY36 - TRAVEL TO DAVIS-BESSE SINCE 6/9/85 050-00346 DAVIS-BESSE 1 AUTH NAME OF DEST DEP RET OBS TRIP ST NO TRAVELER DATE DATE TOTAL 62133 BEARD ATLANTA 1205 1205 310 60631 BECKER GLEN ELLYN 1008 1008 265 234.76 64828 BELTRACCHI, L. OAK-HRBR O 0331 0401 365 63803 CHENG OHIO 0212 0213 375 60359 DE AGAZIO OAK HARBOR 1003 1004 425 371.15 64829 DE AGAZIO, A. OAK-HRBR O 0331 0401 410 61925 DEAGAZIO OAK HARBR 1120 1121 400 337.82 60616 DICK OAK HARBOR 1008 1009 430 317.93 1 61982 DICK OAK HARBR 1209 1210 425 315.37 l 64302 DICK, G OAK HARBOR 0323 0328 550 60478 HERNAN OAK HARBOR 1003 1004 315 293.41 63804 JOHNSTON OHIO 0212 0213 375 61 JONES LYNCHBURG 1105 1105 115 100.29 I#

- 60706 KUO SAN FRAN 1013 1017 600 870.57 LIEDER OAK HARBR 1120 1121 365 234.50 60620 MC CRACKEN GLEN ELLYN 1008 1008 270 325.50 60357 MCCRACKEN OAK HARBOR 1003 1004 390 277.00 63817 PAGE OHIO 0212 0214 375 60519 PARR OAK HARBOR 1003 1004 355 352.91 63704 PERSINKO OHIO 0216 0222 0 CA 64206 PERSINKO, D OAK HARBOR 0323 0329 535 60518 ROSA OAK HARBOR 1003 1004 320 277.20 jf-wCEUTOD SHAW URBANE 1016 1017 365 503R STOLZ OAK HARBOR 2003 1004 390 275.00 61926 STOLZ OAK HARBR 1120 1121 365 275.00 i 61436 THROM LYNCHBURG 1105 1105 25 6.10 1 60513 WESSMAN OAK HARBOR 1003 1004 320 293.02 63800 WRIGHT OHIO 0212 0213 430

Attachment 3 April 1, 1986 ESTIMATE OF ADDITIONAL RESOURCES REQUIRED TO SUPPORT THE DAVIS-BESSIE INVESTIGATION TEAM AND REVIEW GROUP INCIDENT INVESTIGATION TEAM  : AD HOC INDEPENDENT REVIEW GROUP  :

(Jun 10, 1985 to Mar 1, 1986)  : (Jan 24, 1986 to Mar 1, 1986)  :


STAFFHOURS------- 2/ : ---------STAFFHOURS------- -1/ 2/  :

NRC Over- Labor-1/ Other  : Over- Labor Other  :

OFFICE Regular Time Total Costs Costs  : Regular Time Total Costs Costs  :

AEOD _

NRR  :  :

REGION 3  :  :

IE  :  :

RES  :  :

NMSS  :  :

ACRS  :  :

ELD  :  :

PA  :  :

ASLBP  :  :

, TOTALS $ $  : $ $  :

_1/ Use license fee rates to compute labor costs (IE and Regions at $53/hr, all other $62/hr).

, _2/ Other Costs include both travel and program support funds.

'" v..

03/25/86 NUCLEAR REGULATORY COMMISSION PAGE 1

  • OFFICE OF NUCLEAR REACTOR REGULATION FY85 - TRAVEL TO DAVIS-BESSE SINCE 6/9/85 050-00346 DAVIS-BESSE 1
  • AJTH NAME OF DEST DEP RET OBS TRIP ST
  • NO TRAVELER DATE DATE TOTAL 56953 BEARD OAK HARBOR 0610 0621 1275 57480 BEARD OAK HARBOR 0708 0713 730 567.24 PD 58655 BEARD OAK HARBOR 0827 0828 375 56989 BLUMER OAK HARBOR 0618 0620 0 CA 58800 BLUMER OAK HARBOR 0923 0926 490 51084 BUTLER GLEN ELYN 1107 1108 375 417.87 PD l 59084 CWALINA DAK HARBOR 0918 0920 420 56872 DE AGAZIO DAK HARBOR 0609 0614 0 CA 56925 DE AGAZIO GLEN ELLYN 0626 0626 0 CA 56992 DE AGAZIO OAK HARBOR 0618 0620 0 CA 57845 DE AGAZIO OAK HARBOR 0724 0725 425 58737 DE AGAZIO OAK HARBOR 0827 0828 430 51086 DEAGAZIO GLEN ELYN 1107 1108 410 381.86 PD 52558 DEAGAZIO GLEN ELYN 1210 1210 0 CA 59211 DEAGAZIO OAK HARBOR 0923 0926 0 CA 59027 DENTON 04K HARBOR 0909 0909 225 12.97 PD 59140 DICK PT CLINTON 0915 0920 680 57725 DUNNING OAK HARBOR 0714 0720 820 438.70 PD 58570 DUNNING OAK HARBOR 0820 0822 545 58736 EDISON OAK HARBOR 0827 0828 380 59057 EDISON OAK HARBOR 0909 0909 215 59339 EL-BASSIONI OAK HARBOR 0923 0924 380 59353 KNIGHT OAK HARBOR 0922 0925 400 59396 MCCRACKEN OAK HARBOR 0924 0925 335 59030 MIRAGLIA OAK HARBOR 0909 0909 215 17.04 PD 38801 MORISSEAU OAK HARBOR 0923 0926 490 38602 PAULSON OTTAWA CTY 0827 0828 375 305.91 PD 58939 PERSINKO OAK HARBOR 0915 0920 655 59352 RIDGELY OAK HARBOR 0922 0925 340 59372 ROSA OAK HARBOR 0924 0927 390 59338 ROWSOME OAK HARBOR 0927 0924 325 '

51085 STOLZ GLEN ELYN 1107 1108 375 266.18 PD l 52'c 5 7 STOLZ GLEN ELYN 1210 1210 0 CA l 56994 STOLZ OAK HARROR 0618 0620 0 CA l 57846 STOLZ OAK HARCOR 0724 0725 0 CA '

59340 VANDER MOLEN OAK HARBOR 0923 0924 430 58654 WESSMAN OAK HARBOR 0827 0828 0 CA nr

' se,

e

, -f*. e .,

03/25/86 NUCLEAR REGULATORY COMMISSION PAGE 1 '

OFFICE OF NUCLEAR REACTOR REGULATION FYS6 - TRAVEL TO DAVIS-BESSE SINCE 6/9/85 050-00346 DAVIS-BESSE 1 .

AUTH NAME OF DEST DEP RET OBS TRIP ST .

NO TRAVELER DATE DATE TOTAL 62133 BEARD ATLANTA 1205 1205 310 60631 BECKER GLEN ELLYN 1008 1003 265 234.76 64828 BELTRACCHI. L. OAK-HRBR O 0331 0401 365 63803 CHENG OHIO 0212 0213 375 60359 DE AGAZIO OAK HARBOR 1003 1004 425 371.15 64829 DE AGAZIO. A. OAK-HRBR O 0331 0401 410 61925 DEAGAZIO OAK HARBR 1120 1121 400 337.82 60616 DICK OAK HARBOR 1008 1009 430 317.93 61982 DICK OAK HARBR 1209 1210 425 315.37 64302 DICK. G OAK HARBOR 0323 0328 550 60478 HERNAN OAK HARBOR 1003 1004 315 293.41 63804 JOHNSTON OHIO 0212 0213 375 61437 JONES LYNCHBURG 1105 1105 115 100.29 60706 KUO SAN FRAN 1013 1017 600 870.57 61927 LIEDER OAK HARBR 1120 1121 365 234.50 60620 MC CRACKEN GLEN ELLYN 1008 1008 270 325.50 60357 MCCRACKEN OAK MARBOR 1003 1004 390 277.00 63817 PAGE OP70 0212 0214 375 60519 PARR C4K HARBOR 100? 1004 355 352.91 63704 PERSINKO OHIO 0216 0222 0 CA 64206 PERSINKO. D OAK HARBOR 0323 0329 535 60518 ROSA OAK HARBOR 1003 1004 320 277.20 60807 SHAW URBANE 1016 1017 365 60358 STOLZ OAK HARBOR 1003 1004 390 275.00 61926 STOLZ OAK HARBR 1120 1121 365 275.00 61436 THROM LYNCHBURG 1105 1105 25 6.10 60513 WESSMAN OAK HARBOR 1003 1004 320 293.02 63800 WRIGHT OHIO 0212 0213 430 l l

re y

  • h,

__ _ _ _ _ _ _.___ _ _ _ _ _ . - _ _ - _