SEABROOK STATION Engineering Office A

Pubic Sorwice of New Hampshire New Hampshire Yankee Division April 17, 1986 SBN-1010 T.F.

B4. 4. 2 United States Nuclear Regulatory Commission Washington, DC 20555 Attention:

Mr. Vincent S. Noonan, Project Director PWR Project Directorate No. 5

Reference:

(a) Construction Permits CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444 Subj ect :

Construction Status Report ; Seabrook Station, Units 1 and 2

Dear Sir:

Enclosed, please find the Construction Status Report for the period ending March 31, 1986.

Ver truly yours,

,$s W

John DeVincentis, Director Engineering and Licensing Enclosure cc:

Atomic Safety and Licensing Board Service List 42 h 0CW O h 443 k

09 O

$nn R

i g

Seabrook Stahon Construchon Field Office. P O Box 700 Seabrook, NH 03874

s Diane Curran. Esquire Calvin A. Canney Harmon & Weiss City Manager 2001 S. Street, N.W.

City Hall Suite 430 126 Daniel Street Washington, D.C.

20009 Portsmouth, NH 03801 Sherwin E. Turk, Esq.

Stephen E. Merrill, Esquire Office of the Executive Legal Director Attorney General U.S. Nuclear Regulatory Commission George Dana Bisbee, Esquire Tenth Floor Assistant Attorney General Washington, DC 20555 Office of the Attorney General 25 Capitol Street Robert A. Backus Esquire Concord, NH 0330l# 197 116 Lowell Street P.O. Box 516 Mr. J. P. Nadeau Manchester, NH 03105 Selectmen's Office 10 Central Road Philip Ahrens, Esquire Rye, NH 03870 Assistant Attorney General Department of The Attorney General Mr. Angie Machiros Statehouse Station #6 Chairman of the Board of Selectmen Augusta, ME 04333 Town of Newbury Newbury, MA 01950 Mrs. Sandra Cavutis Chairman, Board of Selectmen Mr. William S. Lord RFD 1 - Box 1154 Board of Selectmen Kennsington, NH 03827 Town Hall - Friend Street Amesbury, MA 01913 Carol S. Sneider, Esquire Assistant Attorney General Senator Cordon J. Humphrey Department of the Attorney General 1 Pillsbury Street One Ashburton Place, 19th Floor Concord, NH 03301 Bos&on, MA 02108 (ATTN: Herb Boynton)

Senator Cordon J. Humphrey H. Joseph Flynn, Esquire U.S. Senate Office of General Counsel Washington, DC 20510 Federal Emergency Management Agency (ATTN: Tom Burack) 500 C Street, SW Washington, DC 20472 Richard A. Hampe. Esq.

Hampe and McNicholas Paul McEachern, Esquire 35 Pleasant Street Matthew T. Brock, Esquire Concord, NH 03301 Shaines & McEachern 25 Maplewood Avenue Donald E. Chick P.O. Box 360 Town Manager Portsmouth, NH 03801 Town of Exeter 10 Front Street Gary W. Holmes, Esq.

Exeter, NH 03833 Holmes & Ells 47 Winnacunnet Road Brentwood Board of Selectmen Hampton, NH 03841 RFD Dalton Koad Brentwood, NH 03833 Mr. Ed Thomas FEMA Region I Peter J. Mathews, Mayor 442 John W. McCormack PO & Courthouse City Hall Boston, MA 02109 Newburyport, MA 01950 Stanley W. Knowles, Chairman Board of Selectmen P.O. Box 710 North Hampton, NH 03862

Administrative Judge Helen Hoyt, Chairperson Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Administrative Judge Sheldon J. Wolfe, Chairman Atc.ic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Dr. Emmeth A. Luebke Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Dr. Jerry Harbour Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Con:terction St:tu.a R: port P:ss No. 2-100 Seabrook Station 1 Nucla r Power Picato Stctus As Of: 99-6649-S St-e(e Plant Characteristics:

Key Personnel Docket No.:

05000443 Corporate

Contact:

R. J. Harrison, President and Chief Executive Officer CP No. and Date Issued:

CPPR-135/07-07-76 Corporate Address:

1000 Ele Street Manchester, New Hampshire 03105 CP Empiration Date:

06-30-86 Corporate Telephone No.: (603) 669-4000 Applicant Public Service Of New Hampshire Plant Location:

10 M1. Sor.h of Portsmouth, NH IE Region:

I AE United Engineers & Constructors WRC LPM:

V. Nerses NSSS:

Westinghouse IE Project Inspector Constructor United Engineers & Constructors IE Resident Inspector A. C. Cerne Reactor Type PWR DER (MWE):

1198 Puel load Date Changes i

Inspection Status:

As Reported By Utility "Jouwy, L98(e Time Period MeM,11Me inan.

7 m..._6..

4 Report Beg. Date End Date Report New Reason For Change Number Of Insp.

Of Insp.

Date Schedule Reported By Utility SEs 85-18 06-10,85 06-14-85 pguy 09-06-77 09-01-82 Delays Due To EPA Reversal of Previous 85-2 0 30-85 1

-85 Approval of once Through Circulating 8

5 85 0-18-85 Water Systes and Subseg. NBC Withdrawal

\\

5-26 09-23-85 09-27-85 Of Coast. Perett, and Time Reg. to Resobilise 85-27 10 10 11-08-78 01-01-83 Schedule Re-evaluation 85-2 10-85 10- -

04-04-81 11-30-83 Schedule Re-evaluation

' 85 9 1

4-85

-Op85 j 11-30-82 09-30-84 Schedule Re-evaluation

-30 0-28-85 11-27-8 J

09-25-84 04-30-86 Schedule Re-evaluation 85-31 10-19-85 12*0 5

Incorporate lopect of Construction Suspension i

l k85-32 12 12

-85 and Cash Restrictions in 1984 j

(85 12-

-85 85 07-24-85 06-30-86 Schedule Re-evaluation Inspection Reports Are Available At 14 cal PDRs.

Local Public Document Room:

Exeter Public Library Front Street Exeter, New Hampshire 03883

T l

Construction Status Report Page No. 2-120 Seabrook Station 1 Nuclear Power Plants Status As Of 4-M-44 33886 Construction Status:

Applicant's Current Eatinated Fuel loading Date:

06-30-86 App 11canta Construction Completion Estimate As Defined Applicant's Previous Estimated Fuel Loading Date:

04-30-86 In CP: (Earliest) February 1979 Applicant's Estimated Fuel loading Date At (Latest) June 1986 CP issuance:

08-01-81 Applicant's Current Eattaated Commercial Operation Date 10-31-86 Current Eattmated Percent ranstruction Complete: 941 %*/.

Casments Regarding Current Construction Status Estimated Actual Estimated Actual Estimate Start Start Completion Completion

! Complete Mobilire and Prepare Site 07-76 08-77 100%

Place Structsral Concrets:

09-77 etr-CN 494 H:c%

Install Reactor Pressare Yessel:

05-81 05-81 1001 Install 1arge Bore Process Pipe 10-79 02-86 944 99*/*

Install Large Sore P!pe Hangers, Restraints, and Snubters:

10-79 02-86 9 W 987*

Install Small Bore Pipe 09-80 02-86 99%

Install Cable Trays 09-79 02-86 99%

Install Exposed Metal conduft:

04-79 Nr-5%

M4ed*

Install Power, Control. Instruseatstion, and Secerity Cable:

05-81 02-86 4et 99*/*

Install Electrical Teratnations:

06-81 02-86 9e4 W/s Conduct peactor Cold Hydrostatic Test:

03-85 04-85 100%

Conduct Hot Functional test:

10-85 11-85 200%

Conduct PRICP and Acceptance Tests Necessary For Fuel load:

11-82 04-86 eM G17e 4

1 r

l

s r

i Construction Status Report Page No. 2-122 Seabrook Station 2 Nuclear Power Planta Status As Of:

1.3-M-65 3 -3e -8(o Co-struction Status:

Ap911 cant's Current Estleated Fuel Loa-11og Late.

App 11canta Construction Completion Estimate As Defined App 14. snt's Previous Estimated Fuel Loading Date:

04-3G-87 In CP (Earliest) January 1981 Applicant's Estimated Fuel Loading Date At 10-01-83 (Latest) October 1988 CP Issuance:

Applicant's Current Estimated Commercial Operation Date:

a Current Estimated Percent Construction Completer 24%

Comments Regarding Current Construction Status

  • Indeterminate Estimated Actual Es t ima t ed
  • Actual Estimate Start Start Completion Completinn 1 Complete Mobilire and Prepare Sites 07-76 08-77 1001 Place Structural Concretes 08-81 69%

Install Reactor Pressure vessel:

10-83 12-83 100%

Install Large Bare Process Pipe:

09-82 4%

Install Large Bore Pipe Hangers, Restraints, and Snubbers:

09-82 3%

Install Small Bore Pipe:

0%

Install Cable Tray:

0%

Install Exposed Metal condutt:

0%

Install Power, Control, Instrumentation, and Security Cable:

0%

Install Electrical Tera 1 nations:

01 Conduct Reactor Cold Hydtc4tatic Test:

0%

Conduct Hot Functional Test:

01 Conduct PRECP and Acceptance Tests Necessary For Fuel Imd:

0%

' Indeterminate

\\'

s r

e -

\\

r.

i Construction Status Report Page No. 2-122 Seabrook Station 2 Nuclear Power Plants Status As Of:

1.%-M-4M 3 34-86 u,J.

l I

Construction Status o

I Appitutt's Current Eatinated Fuel leading Date:

App 11canta Construction Completion Estimate As Defined 04-30-87 In CP: (Earliest) January 1981

/-

Applicsw 's Previous Estimated Fu-l leading Da te:

Applicant's Estimated Fuel Loa.fing Date At 10-01-83 (Latest) October 1988 1

LP Issuance:

App 11:/.nt's Current Estimated Commercial Op-rat ton Daty y

Cu ;*nt Estimated Percent Construction Complete 24%

Comments 3ega* diag Current Construction Status-Indeterminate Estimated Actual

- * *ilma tad s actos!

Estimate g

Statt Start Comptet W.

_Complet43

% Complete d$-77 200%

07-76 Nbilize and Prepare Site:

38-81 69%

Place structural Concrete:

10-83 12-83 100%

Install Reactor Pressure Vessel:

O'f-82 4%

Install Large Bore Process Pipet 33 Install Large Bore Pipe Hangers, Icatraints, sad Snubbers:

09-82 0%

Iestsii Small Bore Pipe:

0%

In-tall table Tray:

0%

Install Exposed Metal Cceduit 0~

Install Power, Control, Jr.strumentation, and Security Caale:

0%

Install Electrical Terminatio s 0%

Conduct Reactor Cold Hydrostatic Test:

0%

l j

Conduct F.ot Functional Test:

0%

l Conduct PREOP and Acceptence Tests hecessary For Fuel load:

  • Indeterminate s

l l

l

\\'

s INSERT "A" INSPECTION ENTRANCE EXIT 86-01 01/06 01/10 86-02 01/13 01/23 l

86-03 01/27 01/31 i

86-04 01/13 01/16 86-05 01/27 01/30 86-06 02/24 02/28 86-07 03/10 03/14 86-08 02/05 02/06 86-10 02/24 02/28 86-11 02/10 02/14 86-12 02/03 04/01 l

1 86-13 02/24 0;/28 l

86-14 03/17 03/21 86-15 03/04 03/19 86-16 03/17 03/21 86-17 03/11 03/14 86-18 03/24 03/28 86-19 03/24 03/27 EQUIPMENT QUALIFICATION 02/25 02/27

_ _ _ _ _ _ _ _ _ _ _ _ _