Text
_.
t United Stat:s
+
Enrichment Corpor; tion 2 Democracy Center i
I,J 6903 Rockledge Drive Bethesda. MD 20817 Tel: (301)564 3200 Fax: (301) 564-3701 Unileil Staten IGirichtnent Onpr.ition JAMES H. MILLER Dir: (301) 564-3309 VICE PRESIDENT, PRODUCTION Fax: (301) 571-8279 n
May 12,1997
' Dr. Carl J. Paperiello SERIAL: GDP 97-0072 Director, Office of Nuclear Material Safety and Safeguards Attention: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Portsmouth Gascous Diffusion Plant (PORTS)
Docket No. 70-7002 Transmittal of Revision 9 to Portsmouth Certification Application
Dear Dr. Paperiello:
ia accordance with 10 CFR Part 76, the United States Enrichment Corporation (USEC) hereby submits twenty (20) copies of Revision 9 (May 14,1997) to USEC-02, Application for United States Nuclear Regulatory Commission Certification, Portsmouth Gaseous Diffusion Plant.
]
Revision 9 incorporates changes to the Technical Safety Requirements. These changes were previously submitted for your review in accordance with 10 CFR 76.45 and were approved as j
Amendment 2 to the Certificate of Compliance GDP-2 in your letter dated April 14,1997 (TAC NO.
L32010). Revision bars are provided in the right-hand margin to identify the changes. Revision 9 will be implemented effective May 14,1997.
/) !
Should you have any questions or comments on Revision 9, please call me at (301) 564-3309 or Steve Routh at (301) 564-3251
)
9705210300 970512 Sincerely, r
O PDR ADOCK 07007002l y
c
- og9, g
ames 11. Miller gigggggg8 F'" I",
Vice President, Production i
Offices en Paducah, Kentucky Portsmouth. Ohio Washington.DC
~
Dr. Carl J. Paperiello May 12,' 1997 GDP 97-0072 Page 2
(
Attachment:
USEC-02, Application for United States Nuclear Regulatory Commission l
Certification, Portsinouth Gaseous Diffusion Plant, Revision 9, j
Copy Numbers I through 20
Enclosure:
Affidavit cc:
NRC Region III Office Copy Numbers 21,172 i
NRC Resident Inspector - PGDP Copy Number 22 Mr. Joe W. Parks (DOE)
Copy Numbers 24 through 28 l
NRC Resident Inspector - PORTS, w/o 1
t
[
P i
f j
\\.
s OATIl AND AFFIRMATION I, James H. Miller, swear and affirm that I am Vice President, Production, of the United States Enrichment Corporation (USEC), that I am authorized by USEC to sign and file with the l
Nuclear Regulatory Commission this Revision 9 of the USEC Application for United States Nuclear Regulatory Commission Certification, Portrmouth Gaseous Diffusion Plant (USEC-02), that I am familiar with the contents thereof, and that the sta'-ents made and matters set forth therein are true I
and correct to the best of my knowledge, information, and belief.
r h
Jam Miller
)
Subscribed to before me on th'is /d day of kd41-
,1997.
j i
i.
l.
$1 4/Od W Notary Pubg7ay@373{;$y%ytAND Cer'l' ote (Jod in Mongomery County e
Cc aminion Eviien August 1,1997
i i
o.
l 1
\\
l APPLICATION FOR UNITED STATES NUCLEAR REGULATORY COMMISSION CERTIFICATION.
PORTSMOUTH GASEOUS DIFFUSION PLANT REMOVE / INSERT INSTRUCTIONS REVISION 9 ~
MAY 14,1997 Remove Pages Insert Pages VOLUME 1 List of Effective Pages List of Effective Pages pgs. i/ii, xxvii/xxviii pgs. i/ii, xxvii/xxviii VOLUME 2 List of Effective Pages 1.ist of Effective Pages pgs.i/ii,xxvii/xxviii pgs. i/ii, xxvii/xxviii 6.5-13/14 6.5-13/14 VOLUME 4 List of Effective Pages List of Effective Pages pgs. ii, iv pgs, ii, iv 3.0-3 3.0 3 1
. - ~.
l
\\
SAR-PORTS May 14,1997 Rev. 9
~\\
LIST OF EFFECTIVE PAGES - VOLUME 1 LIST OF EFFECTIVE PAGES Pages Revision Pagcs Revision i
9 xvi..
8 il 4
xvii 8
)'
ill 8
xviii 8
iv 8
xix 8
y 4
xx 8
vi' 8
xxi 8
vii 8
xxii 4
viii 8
xxiii 4
ix 4
xxiv 4
x 8
xxv 8
xi 4
xxvi 8
3 xii 8
xxvii 9
xiil 4
xxviii 8
l dv 8
xv 8
i INTRODUCTION - LIST OF EFFECTIVE PAGES Eagg Revision Eagg Revision 1
1 2
2
]
3 2
l 4
2 J
i
- (
l i
O
.____.,y
SAR-PORTS July 26,1996 Rev. 4 O
VOLUME 1 TABLE OF CONTENTS - LIST OF EFIT,CTPE PAGEm Eggg Revision Eggn Fevisio.n i
3 xviii 4
ii 3
xix 3
iii 3
xx 3
iv 3
xxi 3
v 3
xxii 3
vi 3
xxiii 3
vii 4
xxiv 3
viii 3
xxv 3
ix 3
xxvi 3
x 3
xxvii 3
xi 3
xxviii 3
di 3
uh 3
xiii 3
xxx 3
xiv 3
xxxi 3
xy 3
xxxii 3
xvi 3
xvii 3
9 DEFINITIONS - LIST OF EFFECTIVE PAGES Eagn Revision Eggg Revision 1
2 2
2 3
3 4
1 O
e
SAR-PORTS May 14,1997 Rev.9 CHAPTER C LIST OF EFFECTIVE PAGES Eggg Revision Eggg Revision
~
l 6.1-1 4
6.4-7 3
6.1-2 4
6.4-8 3
6.1-3 8
6.4-9 2
6.1-4 2
6.4-10 2
6.1-5 3
6.5 1 3
6.1-6 2
6.5-2 3
6.1-7 3
6.5-3 2-6.1-8 8
6.5-4 2
6.1 9 3
6.5-5 3
I 6.1-10 8
6.5-6 3
6.1-11 8
6.5-7 8
6.1-12 8
6.5-8 8
6.1-13 3
6.5-9 2.
6.1-14 3
6.5-10 2
6.1-15 3
6.5-11 2
6.1-16 8
6.5-12 3
6.1-17 2
6.5-13 9
6.1-18 2
6.5-14 3
6.2-1 3
6.6-1
'3 6.2-2 2
6.6-2 3
6.3 2 6.6-3 3
6.3-2 2
6.6-4 3
6.3-3 2
6.6-5
'4 6.3-4 2
6.6-6 3
6.3-5 3
6.6-7 3
6.3-6 3
6.6-8 3
i 6.3-7 3
6.6-9 3
6.3-8 3
6.6-10 3
6.3-9 3
6.6-11 3
6.3-10 3
I 6.3-11 3
6.3-12 3
6.3-13 3
6.3-14 3
6.3-15 2
6.3-16 2
6.4-1 3
6.4-2 3
6.4-3 3
6.4-4 3
6.4-5 3
6.4-6 3
i e
xxvii V-
SAR-PORTS July 26,1996 Rev. 4 O
LIST OF EFFECITVE PAGES (Continued)
Eggg Revision Eagg Revision 6.6-12 3
6.10 4 3
6.6-13 3
6.10-5 3
6.6 14 3
6.10-6 2
6.6-15 3
6.10 7 2
6.6-16 8
6.10-8 2
l 6.6-17 3
6.10-9 2
l z
j'3 6.6-18 8
6.10-10 1
l 2
6.6-19 3
6.11-1 3
1 6.6-20 3
6.11-2 4
6.7-1 3
6.11-3 4
6.7-2 2
6.11-4 3
6.7-3 2
6.11-5 3
6.7-4 1
6.11-6 3
6.8-1 3
6.11-7 3
6.8-2 3
6.11-8 3
6.8-3 2
A-1 4
6.8-4 2
A-2 3
6.9-1 3
A-3 4
g 6.9-2 2
A-4 2
6.9-3 4
B-1 3
6.9-4 1
B-2 3
6.9-5 3
B-3 4
t 6.9-6 3
B-4 3
6.9-7 3
6.9-8 3
6.9-9 3
6.9-10 3
6.9-11 3
6.9-12 3
6.9-13 3
6.9-14 3
l 6.9-15 3
6.9-16 3
6.9 17 3
6.9-18 3
6.9-19 3
6.9-20 3
6.10 1 2
6.10-2 8
6.10-3 2
O mm
' SAR-PORTS May 14,1997 Rev. 9 LIST OF EFFECTIVE PAGES - VOLUME 1 LIST OF EFFECTIVE PAGES bggg Revision hgg Revision i
i 9
xvi 8
1i 4
xvn 8
in 8
xviii 8
iv 8
xix 8
v 4
n 8
i vi 8
xxi 8
vii 8
xxii 4
viii 8
xxiii 4
ix 4
xxiv 4
x 8
xxv 8
xi 4
xxvi 8
xii 8
xxvii 9
xiil 4
xxviii 8
xiv 8
n 8
INTRODUCTION - LIST OF EFFECTIVE PAGES bgej Revision hgg Revision 1
1 2
2 3
2 4
2 s
e e
SAR-PORTS July 26,19%
Rev. 4 VOLUME 1 TABLE OF CONTENTS - LIST OF EFFECTIVE PAGES faggi Revision Pages Revision i
3 xviii 4
il 3
xix 3
iii 3
xx 3
iv 3
xxi 3
v 3
xxii 3
vi 3
xxiii 3
vii 4
xxiv 3
vm 3
uv 3
ix 3
xxvi 3
x 3
xxvii 3
xi 3
xxviii 3
xii 3
xxix 3
xiii 3
xxx 3
xiv 3
xxxi 3
xy 3
xxxii 3
xvi 3
xvii 3
O DEFINITIONS - LIST OF EFFECTIVE PAGES Eggpa Revision Pages Revision 1
2 2
2 3
3 4
1 e4 11
SAR-PORTS May 14,1997 j
Rev. 9 CHAPTER 6 LIST OF EFFECTIVE PAGES Eagg Revision Pages Revision 6.1-1 4
6.4-7 3
6.1-2.
4 6.4-8 3
6.1-3 8
6.4-9 2
l A.1-4 2
6.4-10 2
6.1-5 3
6.5-1 3
6.1-6 2
6.5-2 3
6.1-7 3
6.5-3 2
6.1-8 8
6.5-4 2
... '~
6.1-9 3
6.5-5 3
6.1-10 8
6.5-6 3
6.1-11 8
6.5-7 8
6.1-12 8
6.5-8 8
6.1-13.
3 6.5-9 2
6.1-14 3
6.5-10 2
6.1-15 3
6.5-11 2
6.1-16 8
6.5-12 3
i 6.1-17 2
6.5-13 9
6.1-18 2
6.5-14 3
-6.2-1 3
6.6-1 3
6.2-2 2
6.6-2 3
O 6.3-1 2
6.6-3 3
6.3-2 2
6.6-4 3
l 6.3-3 2
6.6-5 3
6.3-4 2
6.6-6 3
6.3-5 3
6.6-7 3
6.3-6' 3
6.6-8 3
6.3-7 3
6.6-9 3
6.3-8 3
6.6-10 3
6.3-9 3
6.6-11 3
6.3-10 3
6.3-11 3
6.3-12 3
^
6.3-13 3
6.3-14 3
6.3-15 2
6.3-16 2
6.4-1 3
6.4-2 3
6.4-3 3
l 6.4-4 3
6.4-5 3
6.4-6 3
j xxvii
SAR-PORTS July 26,1996 Rev. 4 O,
LIST OF EFFECTIVE PAGES (Continued)
Eagn Revision Eggg Revision 6.6-12 3
6.10-4 3
6.6-13 3
6.10-5 3
6.6-14 3
6.10-6 2
6.6-15 3
6.10-7 2
6.6-16 8
6.10-8 2
6.6-17 3
6.10-9 2
6.6-18 8
6.10-10 1
6.6 19 3
6.11-1 3
6.6-20 3
6.11-2 4
6.7-1 3
6.11-3 4
6.7-2 2
6.11-4 3
6.7-3 2
6.11-5 3
6.7-4 1
6.11-6 3
6.8-1 3
6.11-7 3
6.8-2 3
6.11-8 3
6.8-3 2
A-1 4
6.8-4 2
A-2 3
6.9-1 3
A-3 4
6.9'-2 2
A-4 2
6.9-3 4
B-1 3
6.9-4 1
B-2 3
6.9-5 3
B-3 4
6.9-6 3
B-4 3
6.9-7 3
6.9-8 3
6.9-9 3
6.9-10 3
6.9-11 3
6.9-12 3
6.9-13 3
6.9-14 3
6.9-15 3
6.9-16 3
6.9-17 3
6.9 18 3
6.9-19 3
6.9-20 3
6.10-1 2
4.10-2 8
6.10-3 2
O
,w
V SAR-PORTS May 14,1997 Rev. 9 b
V When all of the above elements have been satisfied, the first-line manager can return the equipment to service.
6.5.10 Items Addressed by Compliance Plan This section is implament~i as described with exception (s) as listed below. The listing of the exception (s) also contains a brief description of what is currently in place at the plant. The Compliance Plan provides a description of the exceptions (noncompliances), a justification for continued operation, a description of the actions to be taken to achieve compliance and the schedule for completion of those actions.
6.5.10.1 Procedure Upgrades An upgrade of operations procedures is being performed as part of the nuclear safety upgrade program.
6.5.10.2 Training Program Upgrades Training will be required on upgraded procedures. In addition, training and qualification for some of the positions noted in this section are included in the nuclear safety upgrades for systems 1
approach to training.
6.5.10.3 Overtimo The followmg overtune guideline, among others, is currently included in the Technical Safety Requirements (TSRs):
1 An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, nor more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7 day period, all excluding shift turnover time; r
\\
6.5-13 4
.i SAR-PORTS May 31,1996 Rev. 3 I
i 4
I l
l
)
4 i
l l
'I t
Blank Page
.I E
l i
l l
l a
i l
5 4
8 9
6.5-14 I
l
=.
.. - =
~
TSR-PORTS May 14,1997 Rev.9
~
LIST OF EFFECTIVE PAGFE
(
Eagg Revision Eggg Revision i
6 2.1-23
'5 ii 9
2.1-24
,5 iii 7
2.1-25 5
iv 9
2.1-26 5
y 5
2.1-27 5
vi 6
2.1-28 5
vii 6
2.1-29 5
[
viii 6
2.1-30 5
ix 5
2.1-31 5
4, x
5 2.1-32 6
1.0-1 5
2.1-33_
6 1.0-2 5
2.2-1
'5 1.0-3 5
2.2-2 5
1.04 5
2.2-3 6
1.0-5 5
2.2-4 5
1.0-6 5
2.2-5 6
1.0-7 5
.2.2-6 6
1.0-8 5
2.2-7 6
1.0-9 5
2.2-7a 6
2.0-1 3
2.2-8 6
' -O-
'2.1-1 5
2.2-8a 6
2.1-2 5
2.2-9 5
2.1-3 5
2.2-10 6
2.1-4 6
2.2-11 5
21-4a 6
2.2-12 7
2.1-4b 6
2.2-13 5
2.1-5 6
2.2-14 5
1 2.1-6 5
2.2-15 5
2.1 7 5
2.2-16 5
2.1-8 5
2.2-17 5
2.1-9 5
2.2-18 5
2.1-10 5
2.2-19 5
2.1-11 5
2.2-20 5
2.1-12 5
2.2-21 5
2.1-13 5
2.2-22 5
2.1-14 5
2.2-23 5
2.1-15 5
2.2-24 5
2.1-16 6
2.2-25 5
2.1-17 6
2.2-26 5-l 2.1-18 5
2.2-27 5
2.1-19 5
2.2-28 5
l 2.1-20 6
2.2-29 5
2.1-21 5
2.1-22 5-1 I
- TSR-PORTS May 14,1997 Rev.9 4
i LIST OF EFFECTIVE PAGES (Continued) 4 Egggg Revision Paggg Revision i
2.7-10 5
3.0-2 5
2.7-11 5
3.0-3 9
2.7-12 5
3.0-4 5
2.7-13' 5
3.0-5 5
2.7-14 5
3.0-6 5
2.7-15 5
3.0-7 5
2.7-16 6
3.0-8 5
2.7 5 3.0-9 5
~
2.7-18 5
3.0-10 5
2.7-19 5
3.0-11 5
2.7-20 5
3.0-12 5
4 2.7-21 5
3.0-13 5
2.7-22 5
3.0-14 5
1 2.7-23 5
3.0-15 5
2.7-24 5
3.0-16
.5 2.7-25 5
2.7-26 5
i 2.7-27 5
2.7-28 5
A, 2.8-1 5
2.8-2 5
2.8-3 5
i 2.8-4 6
2.8 5 6
2.8-Sa 6
2.8-6 5
4 3.0-1 5
k e
if C
LO IV
j'
\\
. " TSR-PORTS May 14,1997 e
Rev.9 SECTION 3.0 ADMINISTRATIVE CONTROLS
\\
b.
Individuals.who perform training, health physics, quality assurance, nuclear criticality safety, and/or other safety functions shall have sufficient organizational
. freedom to ensure their independence from operating pressures.
3.2.2 FACILITY STAFF a.
Minimum staffing requirements for each facility are shown in Table 3.2.2-1.
These staffing levels do not apply under conditions requiring facility evacuation.
b.
Administrative procedures shall be developed, implemented, and maintained to limit the working hours of facility staff who perform safety functions (e.g.,
operators, health physics personnel, maintenance personnel), in accordance with the following guidelines.
Adequate shift coverage shall be maintained without routine heavy use of overtime.
.l The objective shall be to have personnel work an 8-hour or 12-hour work day [i.e.,
a nominal 40 hour4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> (can be as much as 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />) work week]. In the event that overtime must be used on a temporary basis, the following guidelines shall be used.
1.
An individual should not be permitted to work more than 16 straight hours, excluding shift turnover; O
2.
An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, nor more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period, nor more than 72 l
hours in any 7 day period, all excluding shift turnover time; 3.
A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work periods; the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> may include shift turnover; 4.
Except during outage periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift.
Any deviation from the above guidelines shall be authorized in advance by the General Manager or his designee,'in accordance with approved administrative procedures and with documentation of the basis for granting the deviation. Routine deviation from the above guidelines is not authorized.
Management will assess on a monthly basis the application of overtime for facility staff who perform safety functions to ensure consistency with the overtime guidelines stated above.
W(
U) 3.0-3
-