ML20141E881

From kanterella
Jump to navigation Jump to search
Advises That as Part of NRC Confirmatory Measurements Program,Liquid Samples Spiked W/Radionuclides Will Be Sent to Facilities for Radiochemical Analyses.Requests That Analysis Be Completed within 60 Days of Sample Receipt
ML20141E881
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire, 05000000
Issue date: 04/10/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8604220413
Download: ML20141E881 (2)


Text

- - - - . . - - - . - - - --

Ndid/

'APR 101986 QukePowerCompany vATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT:

DOCKET NOS. 50-369, 50-370, 50-269, 50-270, 50-287, 50-413 AND 50-414 As part of the NRC Confirmatory Measurements Program, liquid samples spiked with radionuclides will be sent to the McGuire, Oconee and Catawba facilities for radiochemical analyses. These samples are to be analyzed for tritium, strontium-89, strontium-90, and iron-55 in accordance with your approved procedures for analysis of liquid waste samples. If routine analyses of this type are normally performed by a vendor, this vendor should be used to analyze the spiked samples. The spiked samples, with instructions, will be sent under separate cover from the Department of Energy's Radiological and Environmental

-Sciences Laboratory within approximately thirty days.

We request that the analyses be completed as soon as practicable, but no later than 60 days from receipt of the samples. Results should be sent to V. S. Nuclear Regulatory Comission, Region II, ATTN: Mr. P. G. Stoddart. Our evaluation of your results will be discussed with your staff and transmitted in a letter. Spiked samples will be sent to you on an annual basis as part of our routine inspection program.

If you have any questions regarding this program, please contact Mr. Stoddart by telephone at 404-331-5621.

Sincerely, Virgil L. Brownlee, Chief Reactor Projects Branch 3 Division of Reactor Projects cc: M L. McConnell, Station Manager W. W. Hampton, Station Manager

5. S. Tuckman, Station Manager F.' L. Dick, Vice President -

(. Construction Foster, Station Health Physicist

.-T. Yongue, Station Health Physicist

. H. Charest, Station Chemist bec: (See page 2)

[P 2$b0 9 I 2'" I I

r ,

w Duke Power Company 2 bccMesidentInspectors Dpcument Control Desk W. N. Jabbour, NRR

@, Hood, NRR d4. Nicolaras, NRR State of South Carolina State of North Carolina l

RII RII}h RII(b RIIY$u T RIPb JPS.;ohr CO SAdamovitz PStoadart DCollins V8rownlee 4/9/86 4/$/86 4/4/86 4(O /86 4// 6/86 I

1