Forwards New Revs to Parsons Power Group,Inc Audit Plan & Implementing Procedures Noted on Attachment 1.Attachment 1 Also Provides Instructions to Incorporate New Revs Into Previously Transmitted Documents
ML20141E627
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/27/1997
From: Curry D
External (Affiliation Not Assigned)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141E632 List:
References
NUM2-PPNR-0251, NUM2-PPNR-251, NUDOCS 9707010120
Download: ML20141E627 (2)


Text

_

i , e PARSONS l

Parsons Power Group inc.

  • 2675 Morgantown Road
  • Fax: (610) 855-2001

~

.()

i V June 27,1997 Docket No. 50-336 Parsons NUM2-PPNR-0251-L t

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 l

Millstone Nuclear Power Station Unit No. 2 Independent Corrective Action Verification Program (ICAVP)

Gentlemen:

Attached please find new revisions to the Parsons Power Group Inc. ICAVP Audit Plan (PLN41) and Implementing Procedures noted on Attachment 1. Note that Attachment I also provides the i instructions to incorporate the new revisions into the previously transmitted documents. These l revisions incorporate those items discussed during our recent conversations with the NRC ICAVP j Staff.

Please call me at (610) 855-2366 if you have any questions.

Sincerely, l

V l l

Daniel L. Curry b l Parsons ICAVP Project Director l DLC:djv Attachment 1 -Instruction Sheet cc: E. Imbro (2) - USNRC i

( Document Control Desk - USNRC

')

H. Eichenholz - USNRC h,- ,

I R. Laudenat - NNEC J. Fougere - NNECo 010000 Rep. Terry Concannon - NEAC f]

9707010120 970627 PDR p ADOCK050003]6 ,.

[lllllll[llll)ll

.. 2 .

llllll u __;

l l

Attachment 1 fy U INSTRUCTION SHEET Audit Plan (PLN-01)- Revision 2 Project Procedure PP Revision 2 Remove Insert Remove Insert Cover (Pg 1) Rev.1 Cover (Pg 1) Rev. 2 Pagei Rev.1 Page i Rev.2 Cover (Pg 1) Rev.1 Cover (Pg 1) Rev. 2 Pageii Rev.1 Page ii- Rev. 2 Page 2 Rev.1 Page 2 Rev. 2 3-5 Rev.1 3-5 Rev. 2 Page 6 Rev.1 Page 6 Rev. 2 4-2 Rev.1 4-2 Rev. 2 Page 14 Rev.1 Page 14 Rev. 2 4-4 Rev.1 4-4 R.ev. 2 Page 15 Rev.1 Page 15 Rev. 2 4-6 Rev.1 4-6 Rev. 2 Page 16 Rev.1 Page 16 Rev. 2 4-8 Rev.1 4-8 Rev. 2 4-9 Rev.1 4-9 Rev. 2 Project Procedure PP Revision 2 4-12 Rev.1 4-12 Rev. 2 4-13 Rev.1 4-13 Rev. 2 Remove Insett 4-15 Rev.1 4-15 Rev. 2 4-17 Rev.1 4-17 Rev. 2 Entire Rev.1 Entire Rev. 2 4-21 Rev.1 4-21 Rev. 2 4-24 Rev.1 4-24 Rev. 2 l 4-26 Rev.1 4-26 Rev. 2 5-1 Rev.1 5-1 Rev. 2 5-3 Rev.1 5-3 Rev. 2 1 4

1 Communications Plan (PLN-02)- Revision 2 Remove Insert , j Entire Ruv.1 Entire Rev. 2 l

Project Procedure PP Revision 2 Remo_vg Insert Cover (Pg 1) Rev.1 Cover (Pg 1) Rev. 2 Page 2 Rev.1 Page 2 Rev. 2 Page 7 Rev.1 Page 7 Rev. 2 Page 10 Rev.1 Page 10 Rev. 2 l

Project Procedure PP Revision 2 Remove Insert Entire Rev.1 Entire Rev. 2

!