ML20141E627
| ML20141E627 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 06/27/1997 |
| From: | Curry D External (Affiliation Not Assigned) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20141E632 | List: |
| References | |
| NUM2-PPNR-0251, NUM2-PPNR-251, NUDOCS 9707010120 | |
| Download: ML20141E627 (2) | |
Text
_
e i
l PARSONS
~
Parsons Power Group inc.
- 2675 Morgantown Road
- Reading, Pennsylvania 19607 - (610) 855-2000
- Fax: (610) 855-2001
.()
i V
June 27,1997 Docket No. 50-336 Parsons NUM2-PPNR-0251-L t
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 l
Millstone Nuclear Power Station Unit No. 2 Independent Corrective Action Verification Program (ICAVP)
Gentlemen:
Attached please find new revisions to the Parsons Power Group Inc. ICAVP Audit Plan (PLN41) and Implementing Procedures noted on Attachment 1. Note that Attachment I also provides the instructions to incorporate the new revisions into the previously transmitted documents. These revisions incorporate those items discussed during our recent conversations with the NRC ICAVP j
Staff.
Please call me at (610) 855-2366 if you have any questions.
Sincerely, V
Daniel L. Curry b
l l
Parsons ICAVP Project Director DLC:djv -Instruction Sheet cc:
E. Imbro (2) - USNRC i
(
Document Control Desk - USNRC
')
h,-
I H. Eichenholz - USNRC 010000 R. Laudenat - NNEC J. Fougere - NNECo f]
Rep. Terry Concannon - NEAC 9707010120 970627 ADOCK050003]6
[lllllll[llll)ll llllll PDR p
2 u __;
l l
fy U
INSTRUCTION SHEET Audit Plan (PLN-01)- Revision 2 Project Procedure PP Revision 2 Remove Insert Remove Insert Cover (Pg 1) Rev.1 Cover (Pg 1) Rev. 2 Pagei Rev.1 Page i Rev.2 Cover (Pg 1) Rev.1 Cover (Pg 1) Rev. 2 Pageii Rev.1 Page ii-Rev. 2 Page 2 Rev.1 Page 2 Rev. 2 3-5 Rev.1 3-5 Rev. 2 Page 6 Rev.1 Page 6 Rev. 2 4-2 Rev.1 4-2 Rev. 2 Page 14 Rev.1 Page 14 Rev. 2 4-4 Rev.1 4-4 R.ev. 2 Page 15 Rev.1 Page 15 Rev. 2 4-6 Rev.1 4-6 Rev. 2 Page 16 Rev.1 Page 16 Rev. 2 4-8 Rev.1 4-8 Rev. 2 4-9 Rev.1 4-9 Rev. 2 Project Procedure PP Revision 2 4-12 Rev.1 4-12 Rev. 2 4-13 Rev.1 4-13 Rev. 2 Remove Insett 4-15 Rev.1 4-15 Rev. 2 4-17 Rev.1 4-17 Rev. 2 Entire Rev.1 Entire Rev. 2 4-21 Rev.1 4-21 Rev. 2 4-24 Rev.1 4-24 Rev. 2 l
4-26 Rev.1 4-26 Rev. 2 5-1 Rev.1 5-1 Rev. 2 5-3 Rev.1 5-3 Rev. 2 4
Communications Plan (PLN-02)- Revision 2 Remove Insert j
Entire Ruv.1 Entire Rev. 2 Project Procedure PP Revision 2 Remo_vg Insert Cover (Pg 1) Rev.1 Cover (Pg 1) Rev. 2 Page 2 Rev.1 Page 2 Rev. 2 Page 7 Rev.1 Page 7 Rev. 2 Page 10 Rev.1 Page 10 Rev. 2 l
Project Procedure PP Revision 2 Remove Insert Entire Rev.1 Entire Rev. 2
!