Forwards Refuel 8 Inservice Insp Summary of Steam Generator Tube Plugging
ML20141E006
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/15/1997
From: Leonard T
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-97-0102, W3F1-97-102, NUDOCS 9705200261
Download: ML20141E006 (3)


Text

,

Er' e perations, Inc.

l t

Kjllona. LA 70066-0751 Tel 504 464 3120 T.R. "Ted* Leonard

%::=

Waterffvd S W3F1-97-0102 A4.05 i

PR 3

May 15,1997 U.S. Nuclear Regulatory Commission Attn: Document Control Desk s

Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Reporting of Special Report Gentlemen:

Attached is Special Report (SR) Number 97-001-00 for Waterford Steam Electric Station Unit 3. This report provides the Refuel 8 Inservice Inspection summary of steam generator tube plugging. This condition is being reported pursuant to i

10CFR50.36(c)(2) and Technical Specifications 4.4.4.5.a and 6.9.2.

Very truly yours, T.R. Leonard General Manager Plant Operations

/(/

TRUDFUtjs

- Attachment cc:

E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),

3 A.L. Garibaldi, J.T. Wheelock - INPO Records Center, J. Smith, N.S. Reynolds, NRC Resident inspectors Office,

-200044 Administrator - LRPD 9705200261 970515 I'

PDR ADOCK 05000382 Q..

PDRis

?

SPECIAL REPORT SR-97-001-00 Steam Generator Eddy Current Examination (8th Refueling)

On May 1,1997, Waterford 3 completed a 100% inservice eddy current bobbin coil full length examination of each Steam Generator (S/G) and a 100% hot leg top of the tubesheet. This report is submitted in accordance with Technical Specification (TS) 4.4.4.5.a, which requires reporting the number of tubes plugged in each S/G within 15 days of completing inservice inspection (ISI) of S/G tubes pursuant to TS 6.9.2. A follow-up report will be submitted in accordance with TS 4.4.4.5.b by May 1.,1998.

The total number of tubes which have been plugged in each SIG are shown below:

S/G #1 SIG #2 Manufacturina/Preservice 6

20 Batwina (Preventive Pluaaina) 149 149 First Refuelina 0

1 Second Refuelina 3

0 Third Refuelina 10 9

Fourth Refuelina

- Preventive Plugging as a result of ECT 4

5

- Batwing Preventive Plugging 156 156 Fifth Refuelina 4

5 Sixth Refuelino

- Preventive Plugging as a result of ECT 1

2

- 40% Thru-Wall Indications 2

0 1

i-i+.

w

5, SPECIAL REPORT SR-97-001-00 Stecm Generator Eddy Current Examination (8th Refueling)

(Cont'd.)

S/G #1 SIG#2 Seventh Refuelina

- Preventive Plugging as a result of ECT 6

3

- > 40% thru-wallindications 2

0

- Single circumferentialindications 6

1 Elahth Refuelina

- Top of the tubesheet Loose Part Indications 3

3 Multiple Circumferential Indicatians 2

0 Single Volumetric Indications 2

1 Multiple AxialIndications 1

0 Single Circumferential Indication 12 7

Single AxialIndications 9

7

- Wear Indications 240% Thru Wall 0

7 3

i The total number of tubes which have been plugged in each S/G:

SIG #1 S/G#2 Total:

378 376 S/G #1 (8 Plugs) and S/G #2 (3 Plugs) cold leg Westinghouse inconel-600 mechanical ribbed plugs were removed by electrical discharge machining.

Framatome Technologies, Inc, re-plugged the eleven tube locations with a long threaded rolled mechanical Inconel-690 plug.

I 2