ML20141D943

From kanterella
Jump to navigation Jump to search
Advises That 860228 Rev 9 to Physical Security Plan Consistant W/Provisions of 10CFR50.54(p) & Acceptable, Excluding Changes Under Rev 8 Ref in
ML20141D943
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/03/1986
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Agosti F
DETROIT EDISON CO.
References
NUDOCS 8604080321
Download: ML20141D943 (3)


Text

r-74E f f* F A

  • I P MhA R .""**% t i a== i Giu Luu/MLiG W TUh i ti U, APR 0 31986 Docket No. 50-341 Mr. Frank E. Agosti Vice President Nuclear Operations The Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166

Dear Mr. Agosti:

This is to acknowledge receipt of your letter dated February 28, 1986, which transmitted changes, identified as Revision 9, to the " Fermi 2 Physical Security Plan," under the provisions of 10 CFR 50.54(p).

We have reviewed the submitted changes and have determined that, except for those items identified in the enclosure, they are consistent with the provisions of 10 CFR 50.54(p) and do not decrease the effectiveness of the plan. These changes are, therefore, acceptable.

For those items identified as being unacceptable under the provisions of 10 CFR 50.54(p), the previously approved plan revisions must be followed. Should you want to pursue changing the plan under the provisions of 10 CFR 50.54(p), you must resubmit the changes modified to address our comments. In those instances where you desire to pursue the changes without modification, they must be resubmitted under the provisions of 10 CFR 50.90.

The changes accepted with this letter does not include those changes made in Revision 8 to the " Fermi 2 Physical Security Plan" on which comments were forwarded to you by our letter of March 6, 1986. The comments on these changes must be resolved and the changes resubmitted under the provisions of 10 CFR 50.54(p) or the changes resubmitted under the provisions of 10 CFR 50.90.

The reporting and/or recordkeeping requirements contained in 1.his letter af fect fewer than ten respondents; therfore, OMB clearance is not required under P.L.95-511.

The enclosure to your letter contains Safeguards Information of a type specified in 10 CFR 73.21 and are being withheld from public disclosure. ,

\

j-9"

=)

\0 p A rro f i A rn e I N '~O "M / A*

A \' E"CIOUffe Co9tnins m u uv4 ut u i , v,uvai vn SAFEGUAng in,y ,.M IO!!

Upon Separation This Pago is Decontrolled 8604000321 060403 hDR ADOCK 03000341 PDR J

r m a r 1-nii n inO 1 TIODM "AT ' ' OY'"

cru mous u sv Mr. Frank E. Agosti 2 APR 0 31986 The enclosure to this letter also contains Safeguards Information and should be protected against unauthorized disclosure.

Sincerely, W. L. Axels , hief Nuclear Materials Safety and Safeguards Branch

Enclosure:

Comments (Unclassified Safeguards Information) cc w/o enclosure: See Attached List bec: w/ enclosure, w/o attached list:

NMSS/SGRT NRR/SSPB SG Case File: 0500034105WA SG Inspector File: Madeda SG Reviewer File NRR Docket File Enclosuro contnins

'/,O ./gt'f SAFEGUARDS f r0DMTl0:1 4RIII RIII R Upon Separation This Kers/jl

  • Creed ri Axe n Pago is Decontrolled 04/p /86 g\ t

^)

4.

g 7. ,. n , , , n ,,

vi 6. l V V,11 % .)d -

iI U IIY d -

^

k f

I FERMI Docket No. 50-341 Mr. Frank E. Agosti Vice President, Nuclear Operations The Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166 cc: Mr. Harry H. Voigt Esq. Ronald C. Callen LeBoeuf, Lamb, Leiby & MacRae Adv. Planning Review Section 1333 New Hampshire Avenue, N. W. Michigan Public Service Comission Washington, D. C. 20036 6545 Mercantile Way P. O. Box 30221 John Flynn, Esq. Lansing, Michigan 48909 Senior Attorney The Detroit Edison Company Regional Administrator, Region III 2000 Second Avenue U. S. Nuclear Regulatory Comission Detroit, Michigan 48226 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Dennis R. Hahn, Chief Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P. O. Box 30035 Lansing, Michigan 48909 Mr. O. Keener Earle Supervisor-Licensing The Detroit Edison Company Femi Unit 2 6400 No. Dixie Highway Newport, Michigan 48166 Mr. Paul Byron U. S. Nuclear Regulatory Comission Resident Inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Monroe County Office of Civil Preparedness 963 South Raisinville Monroe, Michigan 48161