ML20141D695
| ML20141D695 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 05/09/1997 |
| From: | Caldwell J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Franz J IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT |
| Shared Package | |
| ML20141D700 | List: |
| References | |
| 50-331-97-07, 50-331-97-7, NUDOCS 9705200177 | |
| Download: ML20141D695 (3) | |
See also: IR 05000331/1997007
Text
_ _ .
.
. _ _ ~ - _ . _ .
.
_ . . . - _ _ _ _ . _ _ _ _ ,
l
's
.
..
,
l
l
+g# "'%g%
NUCK. EAR REGULATORY COMMISSION
g
UNITED STATES
.
,.
'
- -
'
"
REGION lit
E
f
801 WARRENVILLE ROAD
g*
f
uSLE. ILLINOIS 60532-4351
- ....
May 9, 1997
Mr. John F. Franz, Jr.
' Vice President, Nuclear
IES Utilities, Inc.
200 First Street SE
P. O. Box 351
.
-
Cedar Rapids, IA 52406-0351
.
SUBJECT:
NRC INSPECTION REPORT NO. 50-331/97007 AND NOTICE OF VIOLATION
l
.
Dear Mr. Franz:
,
.
On April 25,1997, the NRC completed a routine safety inspection at your Duane Arnold
Energy Center (DAEC) facility. The enclosed report presents the results of that inspection.
During the 6-week period covered by this inspection period, your conduct of activities at
the DAEC facility was characterized by a safety conscious approach. We are concerned,
however, about two violations of NRC requirements that were identified. In the first case,
NRC inspectors identified that surveillance testing of residual heat removal service water
pumps was not consistent with the design basis of the plant. In the second case, your
staff identified two examples where corrective actions were not adequate. The two
examples are of particular concern because your corrective actions for similar recent
violations were ineffective and further violations occurred.
These violations are cited in the enclosed Notice of Violation'(Notice), and the
circuNistances surrounding the violations are described in detail in the enclosed report.
Please note that you are required to respond to this letter and should follow the
instructions specified in the enclosed Notice when preparing your response. The NRC will
l
use your response, in part, to determine whether further enforcement action is necessary
,
!
to ensure compliance with regulatory requirements.
In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this
letter and its enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
b
200040
sines L. Caidweii. Director
Division of Reactor Projects
Docket No. 50-331
License No. DPR-49
t
!-
Enclosures:
'
j
2. Inspection Report No. 50-331/97007
!
'
(See attached distribution)
l.l. Il ll llIlli i.ll.l
..o
c
l
9705200177 970509
ADOCK 05000331
,Q
u
. . - . .
. -. -
-
-
-
.
.
.
.. - ~ - - . . . . - . - . . . . . .
. -
. - . .
-
. - -
.
.
,
J. F. Franz
-2-
Distribution:
.
cc w/ encl:
L. Root, President and
Chief Operating Officer
G. Van Middlesworth,
{
Plant Manager
K. E. Paveler, Manager,
Regulatory Perfortnance
Chairperson, Iowa Utilities Board
.
,
3
-
!
l
I
!
!
l
l
!
!
,
i
i
.. _
.
_._ _
_
. _ . . . _ _ _ . - _ . . - _ . __
_ . _ _ _ . _ . _ .
..
.
J. F. Franz
-2-
Distribution:
cc w/ encl:
L. Root, President and
Chief Operating Officer
G. Van Middlesworth,
Plant Manager
i
K. E. Peveler, Manager,
i
Regulatory Performance
Chairperson, Iowa Utilities Board
J
Docket File w/ encl
PUBLIC IE-01 w/enci
DRP w/ancl
Project Mgr., NRR w/enci
OC/LFDCB w/enci
CAA1 w/enci(E-Mail)
A. B. Beach, w/ enc!
Deputy RA, w/enci
Rill Enf. Coordinator, w/ encl
Rlli PRR w/enci
TSS w/enci
DRS (2) w/enci
!
l
1
'
l
!
l
DOCUMENT NAME: R:\\lnsprpts\\ powers \\duan\\DUA97007.DRP
1. =i- .
.< sms.
.
.
s. i. sm.
c - c
s
.ss mi i c - cw . ism .ss-nf ei
=-
OFFICE
Rlli
Rlli
Rlll
J
n
.p
f_
,
SDuPont:dp hh MJordan kk
JCaldwellhk
j
NAME
!
DATE
05M /97
05/[/97
05/7/97 [
OFFICIAL RECORD COPY
'
l