ML20141D322
| ML20141D322 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 03/31/1986 |
| From: | Zwolinski J Office of Nuclear Reactor Regulation |
| To: | Berry K CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| References | |
| TAC-60911, NUDOCS 8604070495 | |
| Download: ML20141D322 (3) | |
Text
-
MAR 311986 Docket No. 50-155 Mr. Kenneth W. Berry Director, Nuclear Licensing Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201
Dear Mr. Berry:
SUBJECT:
INTEGRATED PLAN SEMI-ANNUAL UPDATE N0. 4 REVIEW (TAC 60911)
Re:
Big Rock Point Plant By Amendment 82, dated February 12, 1986, to the Big Rock Point (the facility) Operating License DPR-6, License Condition (7) was incorporated so as to require Consumers Power Company (CPC) to adhere to the Plan for the Big Rock Point Integrated Assessment, "the Plan".Section V.A., Periodic Updating, requires that semi-annual updates be submitted to the NRC for our review.
By submittal dated February 28, 1986 as revised by letter dated March 4, 1986 and supplemented by letters dated March 19 and 27, 1986, CPC has provided required Plan Update No. 4 The supplemental schedular information letters dated March 19 and 27,1986 were requested by the NRC Pnject Manager.
Our staff has reviewed all of the information provided by CPC for Integrated Plan Update No. 4 and finds the additions and changes to the Plan schedules to be acceptable. Our staff has also noted CPC's timeliness and responsiveness during schedule discussions for Issue A-112, Alternate Rod In.iection; Issue B-032, Emergency Operating Proceoures Upgrade; and in particular, Issues B-005 and B-006, Detailed Control Room Design Review and Safety Parameter Displav System.
If you would like to discuss with our staff any of the Integrated Plan Issues, please contact the NRC staff facility Project Manager.
Sincerely, c.W1v,d W go0 Sob 55 John A. Zwolinski, Director P
PDR BWR Project Directorate #1 i
Division of BWR Licensing I
cc: See next page DISTRIBUTION
,, Docket J11e 4 CGrimes RBernero NRC PDR GHolahan EJordan i
Local PDR JZwolinski BGrimes BWD#1 Reading ACRS (10)
CJamerson OELD JPartlow TRotel a DRL:PD#1 DBL:PD#1 DBL:PDF CJamerso TRotella:tm JZwolinski 3/3\\/86 3 /H/86
%/4/86
UNITED STATES
[
('
g NUCLEAR REGULATORY COMMISSION
...E WASHINGTON, D. C. 20555
- ((#[
S March 31, 1986 Docket No. 50-155 4
Mr. Kenneth W. Berry Director, Nuclear Licensing Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201
Dear Mr. Berry:
SUBJECT:
INTEGRATED PLAN SEMI-ANNUAL UPDATE NO. 4 REVIEW (TAC 60911)
Re:
Big Rock Point Plant By 4mniinent f 7, dated February 12, 1986, to the Big Rock Point (the facility) Operating License DPR-6, License Condition (7) was incorporated so as te reouire Consumers Power Company (CPC) tn adhere to the Plan for the Big Rock Point Integrated Assessment, "the Plan".
Section V.A., Periodic Updating, requires that semi-annual updates be submitted to the NRC for our review.
By submittal dated February 28, 1986 as revised by letter dated March 4, 1986 and supplemented by letters dated March 19 and 27,1986, CPC has provided required Plan Update No. 4 The supplemental schedular information letters dated March 19 and 27, 1986 were requested by the NRC Project Manager.
Our staff has reviewed all of the information provided by CPC for Integrated Plan Update No. 4 and finds the aJditions and changes to the Plan schedules to be acceptable. Our staff has also noted CPC's timeliness and responsiveness during schedule discussions for Issue A-112, Alternate Rod In.iection; Issue B-032, Emeroency Operatina Procedures Uparade; and in particular, Issues B-005 and 8-006, Detailed Control Room Design Review and Safety Parameter Displav System.
If you would like to discuss with our staff any of the Intearated Plan Issues, please contact the NRC staff facility Project Manage,r.
O Since ly, j
D John. Zwolinski, Director BWR P oject Directorate #1 Division of BWR Licensing cc: See next page I
O O
Mr. Kenneth W. Berry Consumers Power Co.npany Big Rock Point Plant cc:
Mr. Thomas.A. McNish, Secretary
~
Consumers Power Company 212 West Michigan Avenue Jackson, Michican 49201 Judd L. Racon, Esquire Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Bia Rock Point Plant ATTN: Mr. David P. Hoffman Plant Superintendent Route 3 Post Office Box 591 Charlevoix, Michigan 49720 Mr. I. Lee Moerland Chairman, Board of Commissioners P. O. Box 218 Charlevoix, Michigan 49720 Office of the Governor Room 1 - Capitol Building Lansing, Michigan 48913 Regional Administrator Nuclear Regulatory Commission, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P. O. Box 30035 Lansing, Michigan 48909 Resident Inspector Bia Rock Point Plant c/o U.S. NRC RR #3, Box 600 Charlevoix, Michigan 49720 e