Forwards List Indicating Current Status of Issues in June 1983 Integrated Plant Safety Assessment Rept.Closeout of Items Will Be Made by Region III in Subsequent Insp Repts
ML20141D318
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 03/28/1986
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Taylor J
DAIRYLAND POWER COOPERATIVE
References
TAC-52514, NUDOCS 8604070493
Download: ML20141D318 (4)


Text

,

I l

g 2 81986 Docket No. 50-409 Mr. James W. Taylor General Manager Dairyland Power Cooperative 2615 East Avenue South La Crosse, Wisconsin 54601

Dear Mr. Taylor:

SUBJECT:

STATUS OF SYSTEMATIC EVALUATION PROGRAM ISSUES (TAC 52514)

Re: La Crosse Boiling Water Reactor The June 1983 Integrated Plant Safety Assessment Report of the la Crosse Boiling Water Reactor (LACBWR) provided (1) an assessment of the significance of differences between current technical positions on safety issues and those that existed when LACBWR was licensed, (21 a basis for deciding how these differences should be resolved, and (31 a documented evaluation of plant safety.

By letter dated August 22, 1984, (Norelius to Eisenhut) Reaion III reported on the status of the corrective action implementation scheaule resulting from the Systematic Evaluation Program (SEP) Integrated Assessment Review.

Additionally, the August 22 letter provided a status of SEP actions and noted that those items listed as open were being tracked as inspection report open items by Region III. The enclosure to this letter shows the current status of these issues. Close put of these items will be made by Region III in subsequent inspection reports.

Sincerely, gggsrei FJed by John A. Zwolinski, Director PWR Proiect Directorate #1 Division of RWR Licensing

Enclosure:

SEP Issues cc w/ enclosure:

See next page m DISTRIBUTION .

VDocket [11e; 2 RBuck NRC'POR JStang Local PDR JZwolinski BWD#1 Reading ACRS(10)

OELD CGrimes RBernero GHolahan 8604070493 EJordan BGrimes La Crosse File gDR ADOCK Mo9 PDR JPartlow l CJamerson i

I

% #1 D

< t.

DBL:PD#1 1

DBL:PD#1 [}

CJamerson V tm JS g JZwolinski l t /86 3 $/86 }/gb/86 3 /26/8 (

~

  1. o, UNITED STATES l 85 NUCLEAR REGULATORY COMMISSION
k')",, ( . '(.
E WASHINGTON. D. C. 20555

. . . . l

. March 28,1986 Docket No. 50-409 Mr. James W. Taylor General Manager Dairyland Power Cooperative 2615 East Avenue South La Crosse, Wisconsin 54601

Dear Mr. Taylor:

SUBJECT:

STATUS OF SYSTEMATIC EVALUATION PROGRAM ISSUES (TAC 52514)

Re: La Crosse Boiling Water Reactor The June 1983 Integrated Plant Safety Assessment Report of the La Crosse Boilina Water Reactor (LACPWR) provided (1) an assessment of the significance of differences between current technical positions on safety issues and those that existed when LACRWR was licensed, (2) a basis for decidinq how these differences should be resolved, and (3) a documented evaluation of plant safety.

By letter dated August 22, 1984, (Norelius-to Eisenhut) Reaion III reported on the status of the corrective action implementation schedule resultino from the Systematic Evaluation Prooram (SEP) Intearated Assessment Review.

Additionally, the August 22 letter provided a status of SEP actions and noted that those items listed as coen were beino tracked as inspection report open items by Region III. The enclosure to this letter shows the current status of these issues. Close put of these items will be made by Recion III in subsequent inspection reports.

Sincerely, 9 - k, John . Zwolinski, Director RWR Project Directorate #1 Division of BWR Licensino

Enclosure:

SEP Issues cc w/ enclosure:

See next page

Mr. James W. Taylor Dairyland Power Cooperative la Crosse Boiling Water Reactor cc:

Fritz Schubert, Esquire Clarence Riederer, Chief Engineer Staff Attorney Wisconsin Public Service Dairyland Power Cooperative Commission 2615 East Avenue South Post Office Rox 7854 La Crosse, Wisconsin 54601 Madison, Wisconsin 53707 Roy P. Lessy, Jr.

O. S. Heistand Morgan, Lewis A Bockius 1800 M Street, N.W.

7th Floor North Receptionist Washington, D.C. 20036 Mr. John Parkyn, Plant Manager la Crosse Boiling Vater Reactor Dairyland Power Cooperative l P. O. Box 275 Genoa, Wisconsin 54632 U.S. Nuclear Regulatory Commission Resident Inspectors Office Rural Route #1, Box 276 Genoa, Wisconsin 54632 Town Chairman Town of Genoa Route 1 Genoa, Wisconsin 54632 Chairman, Public Service Commission of Wisconsin Hill Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

LA CROSSE SEP ISSUES IPSAR Inspection Section Report Item Description Comments 4.19.2 83-22-14 Level Controller Installed during for shutdown condenser refueling outage -

to be inspected orior to startup 4.21.1.3 84-09-09 Lockable Valves Closed in for Resin Transfer 50 409/84-16 4.21.3.2 84-08-14 Install remotelv Assessment of operated solenoid in cost-benefit shutdown condenser submittal off-gas vent line in progress 4.21.5 84-09-17 Check valves in Valves are installed -

shutdown condenser to be inspected sample line letter to licensee sent 3/10/86 4.2.6.4 84-09-18 Separate Power Per DPC letter Supplies for full (1/13/85,11/14/85),

scram channels all modifications for IPSAR Section

- 4.26 are complete except for the power-to-flow circuits which will be modified durina the 1987 outape.

See also NRC letter (12/23/85) i

,,,