VIRGINIA FoLECTRIC AND Powna COMPANY Ricnwown, VxreorntA 2026 September 3, 1991 l
I United States Nuclear Regulatory Commission Serial No.91-442 Attention: Document Control Desk NO/ETS Washington, D. C. 20555 l
Docket No.
50-281 Ucense No.
DPR-37 i
i Gentlemen:
i i
VIRGINIA El.ECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 2 SEACTOR CONTAINMENT INTEGRATED LEAK RATE TEST REPORT in accordance with the requirements of 10 CFR 50 Appendix J, Section V, 3
Subparagraphs B.2 and 3 we are providing a summary technical report of the May 4
1991 Unit 2 Integrated Leak Rate Test.
The report includes an analysis and I
interpretation of the integrated leak rate test data as well as, a summary analysis of the i
Type B and C test results.
4 j
If you have any question please contact us.
i l
Very,trujy yours, s
W. L Stewart Senior Vice President - Nuclear Attachment j
Unit 2 Integrated Leak Rate Test Report i
cc:
U. S. Nuclear Regulatory Commission Region ll 101 Marietta Street, N. W.
i Suite 2900 i
Atlanta, Georgia 30323
}
Mr. M. W. Branch NRC Senior Resident inspector i
Surry Power Station i
4 4
P
-.