ML20141C754

From kanterella
Jump to navigation Jump to search
Provides Summary Technical Rept of Apr 1992 Unit 1, Integrated Leak Rate Test.Rept Includes Analysis & Interpretation of Integrated Leak Rate Test Data,As Well as Summary Analysis of Type B & C Test Results
ML20141C754
Person / Time
Site: Surry Dominion icon.png
Issue date: 07/24/1992
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18151A171 List:
References
92-447, NUDOCS 9705190204
Download: ML20141C754 (1)


Text

, __ _ . -. .

Y1ROINIA Etzcruze Ann Powen COMPANY Rzcunown, VIRGINIA 20261 l July 24, 1992 United States Nuclear Regulatory Commission Serial No.92-447 Attention: Document Control Desk NO/ETS l

i Washington, D. C. 20555 l j Docket No. 50-280

License No. DPR-32 I
Gentlemen:

)

VIRGINIA El ECTRIC AND POWER COMPAN_Y SURRY POWER STATION UNIT 1 REACTOR CONTAINMENT BUILDING lhrrEGRATED LEAK RATE TEST i

In accordance with the requirements of 10 CFR 50 Appendix J, Section V,  ;

! Subparagraphs 1992 Unit 1 Integrated B.1 and 3, we Leak areTest.

Rate providing a summary technical report of the Apri!

I The report includes an analysis ano  ;

interpretation Type of the B and C test integrated leak rate test data, as well as a summary analysis of the results. i j if you have any question please contact us.

i

! Very truly yours,  !

k r~--

\v W. L. Stewart 1

Senior Vice President - Nuclear Attachment Unit 1 Integrated Leak Rate Test Report )

i cc: U. S. Nuclear Regulatory Commission j Region 11

101 Marietta Street, N. W.

! Suite 2900

, Atlanta, Georgia 30323 Mr. M. W. Branch J

NRC Senior Resident inspector Suny Power Station s

( w 9705190204 970501 PDR ADOCK 050002 0 P

4.