ML20141C754

From kanterella
Jump to navigation Jump to search
Provides Summary Technical Rept of Apr 1992 Unit 1, Integrated Leak Rate Test.Rept Includes Analysis & Interpretation of Integrated Leak Rate Test Data,As Well as Summary Analysis of Type B & C Test Results
ML20141C754
Person / Time
Site: Surry Dominion icon.png
Issue date: 07/24/1992
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18151A171 List:
References
92-447, NUDOCS 9705190204
Download: ML20141C754 (1)


Text

, __

Y1ROINIA Etzcruze Ann Powen COMPANY Rzcunown, VIRGINIA 20261 l

July 24, 1992 United States Nuclear Regulatory Commission Serial No.92-447 Attention: Document Control Desk NO/ETS i

Washington, D. C. 20555 j

Docket No.

50-280 License No.

DPR-32 I

Gentlemen:

)

VIRGINIA El ECTRIC AND POWER COMPAN_Y SURRY POWER STATION UNIT 1 REACTOR CONTAINMENT BUILDING lhrrEGRATED LEAK RATE TEST In accordance with the requirements of 10 CFR 50 Appendix J, Section V, Subparagraphs B.1 and 3, we are providing a summary technical report of the Apri!

1992 Unit 1 Integrated Leak Rate Test.

The report includes an analysis ano I

interpretation of the integrated leak rate test data, as well as a summary analysis of the Type B and C test results.

i j

if you have any question please contact us.

i Very truly yours, k

r~--

\\v W. L. Stewart Senior Vice President - Nuclear 1

Attachment Unit 1 Integrated Leak Rate Test Report i

cc:

U. S. Nuclear Regulatory Commission j

Region 11 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch J

NRC Senior Resident inspector Suny Power Station s

(

w 9705190204 970501 PDR ADOCK 050002 0 P

4.