Forwards Rev 1 to LER 97-003 Re Degraded Back Pressure Dampers Needed for Pipe Rupture Mitigation Resulted in Operation Being Outside Design Basis.Cause & Corrective Action Discussed
Date released: 06/03/2020 Download: ML20141C515


:on 970204,degraded Back Pressure Dampers Needed for Pipe Rupture Mitigation Resulted in Operation Being Outside Design Basis.Caused by Failure to Include Periodic Cycling & Cleaning of Bdps.Addl Failures,Corrected
ML20141C517
Person / Time
Site: Limerick Constellation icon.png
Issue date: 05/12/1997
From: Kantner J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
References
Download: ML20141C517 (6)
Forwards Rev 1 to LER 97-003 Re Degraded Back Pressure Dampers Needed for Pipe Rupture Mitigation Resulted in Operation Being Outside Design Basis.Cause & Corrective Action Discussed
ML20141C509
Person / Time
Site: Limerick Constellation icon.png
Issue date: 05/12/1997
From: Boyce R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC